INTRODUCTION This report outlines a Stormwater Management Plan (SMP) for a Material Change of Use (MCU) application, 51 Elanda Street, Lot 403RP48112 (the subject site). The report has been prepared for Archend and proposes relevant Stormwater Quality Improvement Devices (SQID) and stormwater Best Management Practices (BMP) to ensure the proposed development meets the stormwater quantity and quality requirements during the operational phase. This report is for development assessment purposes only and does not provide detailed engineering designs. A detailed design will be required to finalise the stormwater concepts as presented in this report. Detailed design documentation should be prepared with the rest of the requirements associated with civil operational works. Objective The main objective of this report is to present a workable SMP that can be incorporated into the development proposal to ensure that the development does not have an unacceptable impact or cause a nuisance that could lead to actionable damage to receiving environments and downstream properties during the development's operational phase. Table 1 below summarises the objectives. Stormwater management for the proposed development has been designed in accordance with the following documents: • Noosa Shire Council Development Codes, 2020; • State Planning Policy (SPP), 2017; • Environmental Protection (Water) Policy, 2009; • Queensland Urban Drainage Manual (QUDM) Fourth Edition, 2016; • Water By Design MUSIC Modelling Guidelines, Version 3.0, 2018; • Australian Rainfall and Runoff Guideline (ARR); • International Erosion Control Association – Best Practise Erosion and Sediment Control, 2008; TABLE 1: OBJECTIVES Objectives Description Stormwater Quantity - Maintain a Lawful Point of Discharge (LPD) for all site catchments in Operational Phase accordance with QUDM (2016). Stormwater Quantity - Development should not result in water being diverted onto land that Operational Phase is not ordinarily subject to overland flow. Stormwater Quantity - Ensure the development does not create adverse flood impacts on Operational Phase upstream or adjacent properties. Stormwater Quality - Stormwater discharged from the site is treated to achieve maximum Operational Phase removal of nutrients, gross pollutants and suspended solids. 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.