HYDROLOGICAL ASSESSMENT
Existing Site Characteristics
The site is currently developed and comprises a dwelling, driveway and maintained vegetation. It
generally falls west to east towards Lot 0 BUP106270 and Lot 0 GTP689 to the west at an average
slope of 15%.
Existing Lawful Point of Discharge
The existing lawful point of discharge is on the site's eastern boundary. Since the site currently has
no internal stormwater infrastructure, all flows generated on the site flow overland to the eastern
boundary (FIGURE 3).
FIGURE 3: SITE CHARACTERISTICS
Proposed Development
The proposed residential development is a 6-unit complex as per the Plan of Development enclosed
in Appendix B.
FIGURE 4 illustrates the development layout concept. The intent of the SMP is to ensure that the
newly proposed development will be complimented by the appropriate stormwater infrastructure to
ensure all runoff generated will be routed through the proposed quality and quantity measures.
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.