Council archive · source document
Stormwater Management Plan · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
FIGURE 4: DEVELOPMENT LAYOUT CONCEPT Proposed Stormwater Management Strategy The proposed development will introduce a new internal pit and pipe system within the reserve of the internal driveway and along the southern boundary to drain impervious areas and roof water. The system will ultimately discharge into the existing lawful point of discharge as defined in this report. Runoff generated from the lot will be captured and conveyed through the proposed stormwater system. It will discharge into a proposed underground detention tank sized to accommodate some of the runoff of the development units and the top part of the driveway infrastructure. The bottom part of the driveway and the basement area will drain to a rain harvesting tank. The rain harvesting tank will be fitted with the appropriate pump system to facilitate the use of the harvested rain for greywater applications, such as irrigation. This system's development will be detailed during the project's design development stage. The proposed underground detention tank will discharge to the existing stormwater inlet pit adjacent to the northeastern corner of the site next to the footpath. The tank has been sized to ensure non-worsening during peak discharges from the site for all storm events up to and including the 1% AEP event. The tank has been sized to account for parts of the contributing catchment (roof water, walkways, parts of the driveway, and some vegetated areas). It is important to note that the geotechnical investigation report by Tectonic discourages any deliberate subsurface disposal of stormwater. Stormwater Conveyance Management A catchment analysis has been completed to assess the site's existing and upstream catchments. The existing internal and external catchments have been delineated using a combination of LiDAR and client-supplied survey data, showing that most of the site discharges to the east. From this analysis, it has been determined that the subject site is situated at the top of the catchment and has insignificant impacts from external catchments draining through the subject site. 24083 – 51 Elanda Street, Sunshine Beach - SMP Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.