Skip to the record
Search everything, all in one place.

Council archive · source document

Stormwater Management Plan · MCU24/0153

of 38

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (15.9 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                               FIGURE 4: DEVELOPMENT LAYOUT CONCEPT

Proposed Stormwater Management Strategy
The proposed development will introduce a new internal pit and pipe system within the reserve of
the internal driveway and along the southern boundary to drain impervious areas and roof water.
The system will ultimately discharge into the existing lawful point of discharge as defined in this
report.

Runoff generated from the lot will be captured and conveyed through the proposed stormwater
system. It will discharge into a proposed underground detention tank sized to accommodate some of
the runoff of the development units and the top part of the driveway infrastructure. The bottom part
of the driveway and the basement area will drain to a rain harvesting tank.

The rain harvesting tank will be fitted with the appropriate pump system to facilitate the use of the
harvested rain for greywater applications, such as irrigation. This system's development will be
detailed during the project's design development stage.

The proposed underground detention tank will discharge to the existing stormwater inlet pit
adjacent to the northeastern corner of the site next to the footpath. The tank has been sized to
ensure non-worsening during peak discharges from the site for all storm events up to and including
the 1% AEP event. The tank has been sized to account for parts of the contributing catchment (roof
water, walkways, parts of the driveway, and some vegetated areas).

It is important to note that the geotechnical investigation report by Tectonic discourages any
deliberate subsurface disposal of stormwater.

Stormwater Conveyance Management
A catchment analysis has been completed to assess the site's existing and upstream catchments. The
existing internal and external catchments have been delineated using a combination of LiDAR and
client-supplied survey data, showing that most of the site discharges to the east.

From this analysis, it has been determined that the subject site is situated at the top of the
catchment and has insignificant impacts from external catchments draining through the subject site.




24083 – 51 Elanda Street, Sunshine Beach - SMP                                                   Page 9

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.