PM Submission - Paul Noonan - MCU25/0118
30 October 2025. On that occasion the site received the same quantity (64mm) of rain in
merely 25 minutes. At that rate the proposed OSD would overflow in 4 minutes.
The town planning report states the OSD design requires 3kL of reuse water capacity per
dwelling and 3kL for gardens which comes to (25+1) x 3kL providing 78kL and bringing the
total to 108kL (108m3) on site. Relating this to the 3161m2 size of the C2B block we get
108m3 / 3161m2 = 0.034m (34mm) of total rain capture. This represents half of the
downpour in both recent <1hr storms which partly flooded and temporarily blocked the
intersection, so in these and larger storms LMD would flood, potentially quite often, and only
after (9/0.5)=18 minutes or (4/0.5)=8 minutes based on the current OSD design.
The capacity of the bio-retention basin might help but cannot be relied on to add storage
capacity if it contained water before a further downpour.
I realise the C2B proposal has a landscaped perimeter. But this will not retain any water if the
ground is already saturated. The ground here can be saturated for a month or more after rain.
Neither the 30 Oct or 15 Nov rain events were major for total rainfall or duration. They were
isolated short heavy events. Some heavy rain events here have lasted over a week and
dropped hundreds of mm of rain. Modelling previously shown to residents by Council
suggests that LMD would remain passable except under extreme storm events. Still, LMD
became impassable during the brief 31 October downpour as seen below.
7
Document Set ID: 24329288
Version: 1, Version Date: 24/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission - Paul Noonan - MCU25/0118Related documentApplication case desk ↗
About this file
- File size
- 739 KB (small file)
- File type
No other editions are linked here.