4) Cemetery Impacts
It has never been explained how this Council-owned land has been identified as surplus to the
needs of the adjoining cemetery. Noosa’s ‘changing demographics’ includes an ageing
population - not all of whom want to be cremated. Where will Council provide land to bury
them if Lots 1, 2, and 3 are filled with housing? (and other shire cemeteries are close to
capacity).
I suggest now the site is being remediated, council should use some of it’s publicly declared
financial surplus to create cemetery land on Lot 2 or 3 by paying back any grant funds for
infrastructure that were conditioned to housing. This would be consistent with the visionary
goal of the Council who in 1999 bought 62 Lake Macdonald Drive for cemetery purposes
and floated the 2008 Cooroy cemetery expansion DA. To my knowledge there is no
published public evidence that the 0.8Ha of effective cemetery land allowed for by Council
in the 62/62 LMD subdivison is adequate for the needs of the shire long term.
5) Stormwater handling capacity grossly inadequate- see calcs below
Stormwater control on that hill beside the cemetery is a massive issue that needs to be
addressed comprehensively now even though the future use of Lots 2 and 3 is said to be not
locked in. Squeezing this Lot 1 C2B development and whatever is proposed for Lots 2 and 3
into this hilly pocket of Cooroy needs to be considered in entirety, not piecemeal (one DA at
a time).
A) The planning report states “It is understood that the Proposed Lot 1 will be flood-free,
with only the adjoining bio-basin over approved Lot 900 being subject to Council’s Flood
Hazard Overlay.” The problem is that the Dianella Ct, LMD, Wilgee Ct intersection is
basically at the same elevation as the bio-basin and at risk of flood impassibility in storms.
B) Site runoff risks are very high.
(i) Re ‘3.9.1 Earthworks’ - substantial performance improvements are necessary for Erosion
and Sediment Control (ESC) on 64 LMD as indicated by two recent failures of stormwater
controls on site. This must be taken into account in designing C2B earthworks should this or
a later version of the DA be approved.
(ii) Re ‘3.10.2 Stormwater Quantity’ - the on site stormwater detention capacity needs serious
review.
In less than 1 hour on Sat 15 Nov, 2025 the site received 64mm (0.064m) of rain. The DA
proposes an On-site Stormwater Detention (OSD) tank with a capacity of 30kL. On 15 Nov
the 3161m2 of DA land received 3161 x 0.064= 202m3 (202kL) of rain in less than one hour.
So the OSD tank would overfill in 202/30 = about 1/7th of an hour (9 minutes). The previous
major uncontrolled polluted stormwater breach event at 64 LMD occurred 2 weeks earlier on
6
Document Set ID: 24329288
Version: 1, Version Date: 24/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission - Paul Noonan - MCU25/0118Related documentApplication case desk ↗
About this file
- File size
- 739 KB (small file)
- File type
No other editions are linked here.