Original source · versioned page text
OPW14/0307 - Application for Prescribed Tidal Works
Very large file: it may take a few minutes
The original of this document is very large (18.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Department of State Development, Infrastructure and Planning _
IDAS form 23-Tidal works and development within
coastal management districts
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for:
operational work that is tidal works (including prescribed tidal works) or operational work within a coastal
management district (mentioned in the Sustainable Planning Regulation 2009, schedule 7, table 2, Item 13)
material change of use that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 3,
item 5 because it involves:
operational work carried out completely or partly in a coastal management district; or
building work carried out completely or partly in a coastal management district that is the construction of a new
premises with a gross floor area (GFA) of at least 1000m' or the enlargement of the GFA of an existing
premises by more than 1000m'
reconflguring a lot that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 2, item
14 because the land is situated completely or partly in a coastal management district or the reconfiguration is In
connection with the construction of a canal
building work that requires referral under the Sustainable Planning Regulation 2009, schedule 7, table 1, item 11
because it Is on land completely or partly seaward of a coastal building line.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
Notes for completing this form
For all development applications you must:
• complete IDAS form 1-Application details
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Coastal Management and Protection Act 1995, the Coastal
Protection and Management Regulation 2003, the Sustainable Planning Act 2009 (SPA) or the Sustainable Planning
Regulation 2009.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
1. Confirm the following mandatory requirements accompany Confirmation of Method of
this application lodgement lodgement
Written description of the proposal, includ'ing a report that addresses any ~ Confirmed
relevant policies.
2. What is the nature of the work or development proposed by the application? (Tick all applicable boxes.)
~ Operational work-complete table A o Material Change of Use-complete table B
o Reconfiguring a Lot-complete table cD Building Work-complete table 0
Great state. Great opportunity.
Queensland
c;nvprnmpnt _
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.