Original source · versioned page text
OPW14/0307 - Application for Prescribed Tidal Works
Very large file: it may take a few minutes
The original of this document is very large (18.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Table A-Operational Work
Does the operational work involve the following? (Tick all applicable boxes.)
a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jellies, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharvlils and the reclamation of land under tidal water)?
D No 181 Ves
If yes, what is the purpose?
I Upgrading works and Maintenance works for existing jetty I
D Private purpose (e.g. private pontoon)
D Another purpose (e.g. commercial marina)
Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?
181 No DVes
If applicable what is the estimated value of the proposed works?
[ I
b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
parks or unallocated state land) on state coastal land above high-water mark.
181 No DVes
If yes, which of the following?
D Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.
D For purposes directly related to the provision of lifesaving or rescue services by a volunteer community organisation.
D For other purposes (please state below).
I I
If applicable what is the estimated value of the proposed works?
I I
c) Disposing of dredge spoil or other solid waste material in tidal water?
181 No DVes
If applicable what is the estimated value of the proposed works?
I I
d) Constructing an artificial waterway?
181 No DVes
If applicable what is the length of the waterway?
I I
e) Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
vegetation on freehold and leasehold land)?
181 No DVes
If applicable what is the estimated value of the proposed works?
I I.
IDAS form 23- Tidal works and development within
coastallllAll8gement districts
Version 3 0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.