Original source · versioned page text
Scg 32038(L3)
Items 6 and 7: Stormwater Infiltration Pits As the RPEQ for the project and with numerous years of relevant experience we can confirm that the proposed infiltration pits are a proven means of offsetting the minimal increase in stormwater runoff from the site. Items 8 and 9: Landscaping Plans We have requested our client forward to Council the current Landscaping plans for the site. Please note our client did provide Landscaping plans during the MCU approval stage and he is confused why he is supplying them again. We trust this response and attached revised drawing satisfy Council’s requirements. Our client is ready to contract a builder for a start early in 2024. Should you require further information please contact the undersigned. Yours faithfully SEAN RICHARDSON – RPEQ 5835 For and on behalf of SCG CONSULTING ENGINEERS Enc SCG Drawings Numbers: 32038 – OW3.1.RevA and SW1.1.RevA SCG Consulting Engineers Page 2 of 2 SCG Ref:32038(L3)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original