ORDINARY MEETING MINUTES 18 JULY 2019
1. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A101A Existing Part Site Plan by Middap Architecture Feb 2019
A102A Proposed Site Works Plan by Middap Architecture Feb 2019
A103B B Proposed Building Plan by Middap Architecture Feb 2019
A104B B Site Plan with Section and Elevation References by Middap 18.03.2019
Architecture
A105B B Site Elevations by Middap Architecture 18.03.2019
A106B B Typical Villa Sections by Middap Architecture 18.03.2019
A201B B Villas and Service Core Floor and Roof Plan by Middap 18.03.2019
Architecture
A202B B Proposed Villas and Service Core 3D Views by Middap 18.03.2019
Architecture
A203A Proposed Entry Building Floor and Roof Plan by Middap 18.03.2019
Architecture
A204A Proposed Entry Building Elevations and 3D Views by Middap 18.03.2019
Architecture
A205B B Proposed Villa 1 and 2 Floor and Roof Plan by Middap Architecture 18.03.2019
A206B B Proposed Villa 1 and 2 Elevation and 3D Views by Middap 18.03.2019
Architecture
A207A Proposed Villa 3 and 4 Floor and Roof Plan by Middap Architecture 18.03.2019
A208A Proposed Villa 3 and 4 Elevation and 3D Views by Middap 18.03.2019
Architecture
6. A maximum building height of 2 storeys and 9.30 metres for Villas 1 and 2 and
9.75 metres for Villas 3 and 4 in accordance with the approved plans. The Entry
Building must not exceed 2 storeys and 8.0 metres.
26. All works must be constructed and work procedures undertaken in accordance
with:
a. The approved plans, the approved amended plans and the conditions
detailed in this Decision Notice.
b. The document ‘Proposed Cartwright Village Extension – Carramar, Noosa
Care Integrated Water Management Plan Version 4 by Callaghan & Toth
dated June 2019.
c. The document ‘Noosa Care Inc Cartwright Village Extension Carramar,
Cooroy Noosa Road, Tewantin Preliminary Design of Stormwater Detention
Volume’ by BSM dated 21 December 2017.
d. The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24
July 2017.
e. The Addendum Letter by Cardno (document number WE17064) dated 23
March 2018.
f. The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01)
dated 27 September 2018.
g. A minimum Finished Floor Level (FFL) of the Aged Care Facility and any
associated facilities at 8.80m AHD.
Page 9 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.