2021-05-20 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 20 MAY 2021
8 CONSIDERATION OF COMMITTEE REPORTS
1 PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT – 11 MAY 2021
The following Recommendations from the Planning & Environment Committee were
adopted without discussion or further amendment.
Council Resolution
Moved: Cr Stockwell
Seconded: Cr Wegener
That the report of the Planning & Environment Committee dated 11 May 2021 be received and the
recommendations therein be adopted.
Carried unanimously.
1 OPW20/0114 PLANNING & ENVIRONMENT COURT APPEAL NO. D209 OF 2020 -
REFUSAL OF AN APPLICATION FOR OPERATIONAL WORKS - JETTY AT 1/4 PORTSIDE
CT, NOOSAVILLE
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 11 May 2021 regarding Planning & Environment Court
Appeal No. D209 of 2020 and agree to settle the appeal generally in accordance with the
following conditions:
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
20.046 Sheet 1 of 2 E Site Plan prepared by Kunkel Building Design 6 August 2020
Sheets
20.046 Sheet 2 of 2 E Floor Plan, Floor Framing Plan & Typical Section 6 August 2020
Sheets prepared by Kunkel Building Design
Currency Period
2. The development approval lapses if the works have not been completed and all
conditions of approval been complied with by 20 May 2023, unless an application to
extend the currency period is approved by Council.
Site Specific Conditions
3. The approved plans must be certified by a suitably qualified Registered Professional
Engineer of Queensland (RPEQ) as being suitable for the intended use prior to the
commencement of construction. A copy of the certified plans must be submitted to
Council for records purposes.
4. The Registered Professional Engineer of Queensland (RPEQ) bears full responsibility
for all structural aspects of the jetty.
General Conditions
5. All structures must be designed and constructed such that they are free standing within
the waterway and are not connected to or behind the revetment wall.
6. All structures must have no detrimental effects on stormwater drains and/or easements.
7. Jetties must have a level-walking surface of R.L 1.000 A.H.D or be level with the top of
the revetment wall.
Page 5 of 29