2021-05-20 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 20 MAY 2021
8. A rigid handrail must be fitted on one side of the walkway.
9. No posts or vertical supports of the proposed jetty are to extend vertically from the
structure unless they provide necessary support for the handrail.
10. No boatlifting devices are to be attached or moored at the jetty structure for the purpose
of elevating a vessel above the water without Council approval.
11. There must be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall unless all switches and power outlets are positioned above
the 1%AEP flood level.
12. Lighting associated with the use must be designed, installed, operated, and maintained
in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
Lighting.
13. Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
a. Located clear of this rock protection where applicable; or alternatively
b. Where the scour protection extends beyond 750mm:
i. Prior to driving piles, the rocks are to be removed to expose the geotextile
and the geotextile cut neatly to allow it to be turned back. During pile driving,
care is to be taken to ensure the geotextile is not damaged. At the completion
of pile driving, the fabric is to be turned down around the pile and the rocks
replaced around the piles
14. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
15. Boat repair activities are not permitted on site.
16. Wastewater and sullage must only be disposed of at approved pumpout facilities.
17. The mooring facility must not be utilised for live-aboard purposes, including short term
accommodation.
18. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act
EPA (1994) and the Environmental Protection (Water) Policy 2009.
19. Certification by a Registered Professional Engineer of Queensland that states that the
jetty is constructed in accordance with best practice methods and is structurally sound
must be submitted to Council. This certification must be submitted to Council within three
(3) months of the completion of the works. A final inspection and approval of the structure
by Council’s Inspector is also required. Please contact Council’s Development
Assessment Branch on 5329 6500 to arrange the inspection.
20. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
Performance Bond
21. Security in the form of a cash bond or trading bank guarantee to the sum of $2500 must
be submitted to Council, to secure performance of all conditions of this approval, prior to
commencement of works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond
or guaranteed sum to effect compliance with conditions.
Page 6 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.