                      b.      The relevant conditions of the higher order Material Change of Use approval Ref:
                              MCU19/0031 - dated 22 August 2018 to which this approval relate.
                      c.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      d.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Pavement Design and Construction
               17.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               18.    Safe pedestrian access on all streets in the vicinity of the development must be maintained
                      at all times. Should footpath/road closures be necessary to carry out construction works,
                      Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               19.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles and ensuring no trip or fall hazard to the public and
                      the property users.
               20.    Any existing kerb & channel and/or concrete footpath sections requiring removal due to the
                      new works must be saw-cut and removed to allow for a smooth and neat finish with the new
                      works.
               21.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council in writing.
                      Site Access, Driveway and Car Parking Area
               22.    New driveway must be constructed generally in accordance with the approved plans.
               23.    Landscaping, fences and other fixtures near the access must be provided to allow for clear
                      sight distances to pedestrians and drivers in compliance with the requirements of Section
                      3.2.4 and Figure 3.3 of AS/ANZS 2890.1.
               24.    The following must be complied with during the construction of the required
                      crossover/driveway and car park:
                      a.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties or on the road verge and public pathway.
                      b.      Where there is an existing or proposed pedestrian path, a matching crossfall must be
                              provided for the driveway for the full width of the path and ensuring no trip or slip hazard
                              is created due to the new works.
               25.    All paved areas for the driveway, parking, vehicles manoeuvring and pedestrian access must
                      be slip resistant in accordance with the applicable standards.
               26.    Parking area, internal kerb construction and linemarking must be provided generally in
                      accordance with the approved plans and in compliance with applicable standards and best
                      engineering practices.




                                                                                                           Page 5 of 11
Document Set ID: 21120931
Version: 3, Version Date: 23/04/2020                                                                    Print Date: 24 April 2020, 12:22 PM
Log in to download the original file

Approval for OPW.pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.