Decision Notice - 010.2008.00000858.001 [As Published] · 142008.858
Officer: Denis Wallace
Direct Telephone: (07) 5449 5179
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2008/858
Your Reference:
2 December 2008
Bark Design Pty Ltd
PO Box 1355
NOOSA HEADS QLD 4567
Dear Madam
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 2 December 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/858
Street address: 22 Hill Street, Sunshine Beach
Real property description: Lot 491 RP 48112
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Preliminary Approval for Operational Works - Landscaping, Access & Carparking, Frontage
Works, Stormwater Drainage and Excavation
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Preliminary Approval is identified in the Assessment Manager conditions.
4 ASSESSMENT MANAGER CONDITIONS
Landscaping
1. A further application for Operational Works shall be submitted to comply with the conditions of
this Preliminary Approval. A Development Permit will not be issued until all bonds and
development contributions have been paid in accordance with the Material Change of Use
application 05/0390.
2. The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines
and the approved Plans of Development. The approved plans are numbered: -
Page 1 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
2008/858
Plan / Rev. Plan / Document Name Date
Document No.
08-501/1 Landscape Plan (Sheet 1 of 2) – 15 May 2008
Landform Design Consultants
08-501/2 Landscape Plan (Sheet 2 of 2) – 15 May 2008
Landform Design Consultants
and as may be amended by these conditions and annotations on the plans.
3. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
4. The landscape construction is to be implemented in accordance with the landscape plan,
planting schedule and horticultural industry best practices.
5. All trees must be planted a minimum of 1 metre from all services.
6. This Preliminary Approval lapses if a Development Permit for Operational Works has not been
obtained by 2 December 2010, unless application to extend the currency is approved by
Council.
Landscaping, Access & Carparking, Frontage Works, Stormwater Drainage and Excavation.
7. The development shall be carried out in accordance with the approved plans listed below or as
modified herein: -
Plan / Rev. Plan / Document Name Date
Document No.
0511 – 01 – 01 A Locality Plan & Index – Earl Covington May 2008
& Associates
0511 – 02 0 Allotment Layout Plan – Earl Covington 16 May 2008
& Associates
0511 – 01 – 03 C Layout Plan and Driveway Detail – Earl May 2008
Covington & Associates
0511 – 01 – 04 0 Eathworks Plan – Earl Covington & 16 May 2008
Associates
0511 – 01 – 05 D Stormwater Layout Plan – Earl June 2008
Covington & Associates
0511 – 01 – 06 B Driveway – Longitudinal & Cross May 2008
Sections – Earl Covington & Associates
0511 – 01 – 07 A Stormwater Calculation Tables – Earl June 2008
Covington & Associates
0511 – 01 – 08 A Stormwater Drainage Longitudinal June 2008
Sections – Earl Covington & Associates
0511 – 01 – 09 0 Erosion & Sedimentation Control Plan – 16 May 2008
Earl Covington & Associates
8. Adjacent property owners must be notified three (3) days in advance, that drainage and
access works are being carried out on the common access to those properties. Please ensure
that arrangements are in place with adjoining owners/residents that use the common access.
9. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing No. 0511-01-05/D by Earl Covington & Associates.
Page 2 of 9
Page 3
2008/858
10. Following the construction of the proposed stormwater drainage within the verge, the
demolished concrete footpath shall be replaced. Prior to replacement of the footpath, the
alignment shall be confirmed on site with Council’s Construction Technical Officer. The
footpath shall have a slip resistant surface and the expansion joints shall be “saw cut”, not
trowel jointed.
11. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
12. All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy
PSP03 Landscaping Plants and Guidelines.
13. Council’s Construction Technical Officer (phone 0410 512 505) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of those works.
14. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
15. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
16. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff. Council’s
Construction Technical Officer shall provide an inspection form for ‘signing off’ by the Engineer
at appropriate stages of construction and during on-site meetings. The Construction Technical
Officer will also sign the form at each stage when requested conditions have been satisfied.
The works (footpath, and that part of the stormwater drainage and concrete driveway within
the road reserve) will be accepted “On Maintenance” after this form has been signed by the
inspector for each stage and a letter from the Engineer has been received by Council
requesting that the works go “On Maintenance”.
17. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
18. Council standards shall apply to these works unless otherwise modified herein.
19. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify Council’s CEO and shall forthwith rectify the damage to that property or facility
at its cost and to the satisfaction of Council’s CEO.
Page 3 of 9
Page 4
2008/858
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
20. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
21. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
22. All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
23. Safe pedestrian access in the vicinity of the development shall be maintained at all times. If
footpath / road closures are necessary to carry out construction works, Council’s CEO must be
notified prior to the proposed closure.
24. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot“ fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No 0511-01-09 by Earl Covington & Associates,
Council’s CEO may request further controls to be installed should approved measures be
inefficient.
25. All stormwater drainage lines including private drainage lines (also known as inter-allotment
drainage lines) or as otherwise approved by Council’s CEO shall be inspected by closed
circuit television (CCTV) at the completion of all works and immediately prior to acceptance
‘On Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of
this inspection.
A report of the CCTV inspection, including photographic records (which includes photos &
video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
approval. Any defects or substandard works shall be recorded and accurately illustrated on
the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification works have
been completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
26. Prior to acceptance of the civil works (footpath, and that part of the stormwater drainage and
concrete driveway within the road reserve) to become Council assets "On Maintenance", the
lodgement of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
level and type of all services and structures. All of which shall be submitted to Council for
checking and for Council’s records.
Page 4 of 9
Page 5
2008/858
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks”.
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
27. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
28. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
29. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2005/390.
30. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
08-501/1 Landscape Plan (Sheet 1 of 2) – 15 May 2008
Landform Design Consultants
08-501/2 Landscape Plan (Sheet 2 of 2) – 15 May 2008
Landform Design Consultants
0511 – 01 – 01 A Locality Plan & Index – Earl Covington May 2008
& Associates
0511 – 02 0 Allotment Layout Plan – Earl Covington 16 May 2008
& Associates
0511 – 01 – 03 C Layout Plan and Driveway Detail – Earl May 2008
Covington & Associates
0511 – 01 – 04 0 Eathworks Plan – Earl Covington & 16 May 2008
Associates
0511 – 01 – 05 D Stormwater Layout Plan – Earl June 2008
Covington & Associates
0511 – 01 – 06 B Driveway – Longitudinal & Cross May 2008
Sections – Earl Covington & Associates
Page 5 of 9
Page 6
2008/858
0511 – 01 – 07 A Stormwater Calculation Tables – Earl June 2008
Covington & Associates
0511 – 01 – 08 A Stormwater Drainage Longitudinal June 2008
Sections – Earl Covington & Associates
0511 – 01 – 09 0 Erosion & Sedimentation Control Plan – 16 May 2008
Earl Covington & Associates
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a Change to an Existing Approval Application under the Integrated
Planning Act must be made. Amended plans clearly indicating the changes must be lodged
with this application along with the appropriate fees.
2. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
a. On a Sunday or public holiday, at any time; or
b. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
A preliminary approval under section 3.1.6 of Integrated Planning Act 1997 has been granted and as
such the level of assessment and applicable codes for any development approval resulting from this
approval are identified in the conditions.
Page 6 of 9
Page 7
2008/858
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Operational Landscaping, Access & Carparking, Frontage Works,
Works Stormwater Drainage and Excavation.
11 SELF ASSESSABLE CODES
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Denis Wallace
PLANNING OFFICER
Page 7 of 9
Page 8
2008/858
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the currency period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a currency period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 8 of 9
Page 9
2008/858
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development currency period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 9 of 9
Used in these records
Decision Notice - 010.2008.00000858.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.