Plan / Rev. Plan / Document Name Date
Document No.
08-501/1 Landscape Plan (Sheet 1 of 2) – 15 May 2008
Landform Design Consultants
08-501/2 Landscape Plan (Sheet 2 of 2) – 15 May 2008
Landform Design Consultants
and as may be amended by these conditions and annotations on the plans.
3. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
4. The landscape construction is to be implemented in accordance with the landscape plan,
planting schedule and horticultural industry best practices.
5. All trees must be planted a minimum of 1 metre from all services.
6. This Preliminary Approval lapses if a Development Permit for Operational Works has not been
obtained by 2 December 2010, unless application to extend the currency is approved by
Council.
Landscaping, Access & Carparking, Frontage Works, Stormwater Drainage and Excavation.
7. The development shall be carried out in accordance with the approved plans listed below or as
modified herein: -
Plan / Rev. Plan / Document Name Date
Document No.
0511 – 01 – 01 A Locality Plan & Index – Earl Covington May 2008
& Associates
0511 – 02 0 Allotment Layout Plan – Earl Covington 16 May 2008
& Associates
0511 – 01 – 03 C Layout Plan and Driveway Detail – Earl May 2008
Covington & Associates
0511 – 01 – 04 0 Eathworks Plan – Earl Covington & 16 May 2008
Associates
0511 – 01 – 05 D Stormwater Layout Plan – Earl June 2008
Covington & Associates
0511 – 01 – 06 B Driveway – Longitudinal & Cross May 2008
Sections – Earl Covington & Associates
0511 – 01 – 07 A Stormwater Calculation Tables – Earl June 2008
Covington & Associates
0511 – 01 – 08 A Stormwater Drainage Longitudinal June 2008
Sections – Earl Covington & Associates
0511 – 01 – 09 0 Erosion & Sedimentation Control Plan – 16 May 2008
Earl Covington & Associates
8. Adjacent property owners must be notified three (3) days in advance, that drainage and
access works are being carried out on the common access to those properties. Please ensure
that arrangements are in place with adjoining owners/residents that use the common access.
9. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing No. 0511-01-05/D by Earl Covington & Associates.
Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000858.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.