Council archive · source document
Decision Notice - 010.2008.00000858.001 [As Published] · 142008.858
2008/858
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks”.
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
27. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
28. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
29. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2005/390.
30. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
08-501/1 Landscape Plan (Sheet 1 of 2) – 15 May 2008
Landform Design Consultants
08-501/2 Landscape Plan (Sheet 2 of 2) – 15 May 2008
Landform Design Consultants
0511 – 01 – 01 A Locality Plan & Index – Earl Covington May 2008
& Associates
0511 – 02 0 Allotment Layout Plan – Earl Covington 16 May 2008
& Associates
0511 – 01 – 03 C Layout Plan and Driveway Detail – Earl May 2008
Covington & Associates
0511 – 01 – 04 0 Eathworks Plan – Earl Covington & 16 May 2008
Associates
0511 – 01 – 05 D Stormwater Layout Plan – Earl June 2008
Covington & Associates
0511 – 01 – 06 B Driveway – Longitudinal & Cross May 2008
Sections – Earl Covington & Associates
Page 5 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000858.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.