All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
20. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
21. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
22. All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
23. Safe pedestrian access in the vicinity of the development shall be maintained at all times. If
footpath / road closures are necessary to carry out construction works, Council’s CEO must be
notified prior to the proposed closure.
24. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot“ fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No 0511-01-09 by Earl Covington & Associates,
Council’s CEO may request further controls to be installed should approved measures be
inefficient.
25. All stormwater drainage lines including private drainage lines (also known as inter-allotment
drainage lines) or as otherwise approved by Council’s CEO shall be inspected by closed
circuit television (CCTV) at the completion of all works and immediately prior to acceptance
‘On Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of
this inspection.
A report of the CCTV inspection, including photographic records (which includes photos &
video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
approval. Any defects or substandard works shall be recorded and accurately illustrated on
the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification works have
been completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
26. Prior to acceptance of the civil works (footpath, and that part of the stormwater drainage and
concrete driveway within the road reserve) to become Council assets "On Maintenance", the
lodgement of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location,
level and type of all services and structures. All of which shall be submitted to Council for
checking and for Council’s records.
Page 4 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000858.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.