ORDINARY MEETING AGENDA 17 MAY 2018
Spill Containment
Fuel Dispensing Area (Higher Risk Area)
50 Spill capture capacity must be sufficient capacity to hold a volume equivalent to at least
the largest tanker compartment likely to be delivering fuel to the site (>8kL)
51 In the event of failure of any part of the system, power failure or where the spill
compartment or hydrocarbon chamber exceeds capacity, no petroleum product shall
be released beyond the property boundary.
Stormwater quality discharge criteria.
52 Stormwater quality discharge must be to the following minimum standards:
i. <5ppm (mg/L) Total Petroleum Hydrocarbons (TPH)
ii. ≥80% reduction in Total Suspended Solids (TSS) heavy oils & metals
iii. ≥90% reduction in gross pollutants
53 There must be no high-flow bypass. 100% of captured liquids to be treated.
Uncovered Forecourt Area (Medium Risk Area)
54 In the event of failure of any part of the system, power failure or where the spill
compartment or hydrocarbon chamber exceeds capacity, no petroleum product shall
be released beyond the property.
55 Stormwater quality discharge must be to the following standards:
i. <5ppm (mg/L) Total Petroleum Hydrocarbons (TPH)
ii. ≥80% reduction in Total Suspended Solids (TSS)
iii. ≥90% reduction in gross pollutants
56 High-flow bypass / first-flush capture design capacity must be designed to meet the
defined discharge criteria during a storm up to the 3 month ARI-6 minute design rainfall
event without surcharging or backing up the drainage system.
Submit Certification
57 Prior to the commencement of the use certification shall be provided to Council
demonstrating that the system has been installed in accordance with the above.
Noise
58 Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
compressors, pumps etc. on site must be located within the building or suitably
provided with noise reduction measures and located to prevent a noise nuisance
beyond the boundary of the site and to not exceed the levels specified in Table 1.
Table 1
NOISE LIMITS AT A SENSITIVE RECEPTOR
PERIOD Noise level at noise sensitive place measured as the adjusted
maximum sound pressure level (Lamax, adj,T)
7am – 6pm Background noise level (LAbg,T) plus 5 dB(A)
6pm – 10pm Background noise level plus 5 dB(A)
10pm – 7am Inaudible
NOISE LEVELS AT COMMERCIAL PLACE
PERIOD Noise level at a commercial place measured as the adjusted
maximum sound pressure level (Lamax, adj,T)
7am – 6pm Background noise level (LAbg,T) plus 10 dB(A)
6pm – 10pm Background noise level plus10 dB(A)
10pm – 7am Background noise level plus 8 dB(A)
Page 24 of 29