ORDINARY MEETING AGENDA                                                              17 MAY 2018


    59   When requested by Council, a Noise Impact Assessment Report (NIAR) showing
         monitoring and recording of noise levels must be undertaken to investigate any
         complaint (other than a frivolous or vexatious complaint) caused by noise emissions
         from operations at the premises.
    60   Such monitoring must be undertaken within a reasonable and practicable timeframe
         nominated by Council and be performed by a suitably qualified person in accordance
         with accepted guidelines and standards. The report is to be submitted to Council
         detailing the results of such monitoring and recommendations for any measures to
         achieve compliance with limits outlined in Table 1 of this Decision Notice.
         For the purpose of measuring and certifying relevant noise conditions and reporting
         (e.g. mechanical plant and equipment, a/c units, motors, refrigeration equipment,
         compressors, pumps, rooftop plant and equipment. etc) a suitably qualified person is
         either:
         a.    a Registered Professional Engineer of Queensland, or
         b.    an environmental consultant with a minimum of three (3) years current
               experience in the field of acoustics.
    Rainwater/Detention Tanks
    61   In accordance with the Public Health Act 2005, rainwater tanks (including the detention
         tank) must be constructed with mosquito proof screens (made from either brass,
         copper, aluminium or stainless steel), and constructed with a mesh size of no more
         than 1mm, and must be installed in a way that does not accelerate corrosion. Tanks
         that contain flap valves must be installed so that when closed, mosquitoes cannot pass
         through the valve.
    62   Where it is intended to use rainwater for drinking purposes, a suitable treatment system
         is required to be installed to disinfect or treat the water to microbiological and physical
         standards as described in the current Australian Drinking Water Guidelines to make it
         fit for drinking purposes.
    WASTE
    Waste Disposal
    63   The developer must provide waste storage and disposal facilities in accordance with
         Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
         and Industrial Premises”. The facilities must include an external impervious area
         correctly sized for all refuse and recycling containers and suitably screened from public
         places and neighbouring properties. A bin wash area is required with a cold-water tap,
         hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
         designed to prevent storm water entry to the sewerage system. This can be achieved
         with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
         the waste area can be roofed, or any other design approved by Council.
    64   Refuse containers must be provided in accordance with the requirements of the
         Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
         Regulation 2000, for the storage and collection of refuse.
    65   Public bins must be provided throughout the car park to reduce littering. All bins
         provided must be for refuse and recycling and be decanted into the bulk bins by the
         site operators.
    OPERATIONAL WORKS CONDITIONS
    66   Advertising devices undertaken in accordance with this approval must generally
         comply with the approved plans of development. The approved plans are listed in the
         following table unless otherwise amended by these conditions.


                                                                                    Page 25 of 29
Log in to download the original file

2018-05-17 Ordinary Meeting Agenda(PDF, 664KB).pdf · 680 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.