Original source · versioned page text
2018-05-17 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 17 MAY 2018
59 When requested by Council, a Noise Impact Assessment Report (NIAR) showing
monitoring and recording of noise levels must be undertaken to investigate any
complaint (other than a frivolous or vexatious complaint) caused by noise emissions
from operations at the premises.
60 Such monitoring must be undertaken within a reasonable and practicable timeframe
nominated by Council and be performed by a suitably qualified person in accordance
with accepted guidelines and standards. The report is to be submitted to Council
detailing the results of such monitoring and recommendations for any measures to
achieve compliance with limits outlined in Table 1 of this Decision Notice.
For the purpose of measuring and certifying relevant noise conditions and reporting
(e.g. mechanical plant and equipment, a/c units, motors, refrigeration equipment,
compressors, pumps, rooftop plant and equipment. etc) a suitably qualified person is
either:
a. a Registered Professional Engineer of Queensland, or
b. an environmental consultant with a minimum of three (3) years current
experience in the field of acoustics.
Rainwater/Detention Tanks
61 In accordance with the Public Health Act 2005, rainwater tanks (including the detention
tank) must be constructed with mosquito proof screens (made from either brass,
copper, aluminium or stainless steel), and constructed with a mesh size of no more
than 1mm, and must be installed in a way that does not accelerate corrosion. Tanks
that contain flap valves must be installed so that when closed, mosquitoes cannot pass
through the valve.
62 Where it is intended to use rainwater for drinking purposes, a suitable treatment system
is required to be installed to disinfect or treat the water to microbiological and physical
standards as described in the current Australian Drinking Water Guidelines to make it
fit for drinking purposes.
WASTE
Waste Disposal
63 The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”. The facilities must include an external impervious area
correctly sized for all refuse and recycling containers and suitably screened from public
places and neighbouring properties. A bin wash area is required with a cold-water tap,
hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
designed to prevent storm water entry to the sewerage system. This can be achieved
with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
the waste area can be roofed, or any other design approved by Council.
64 Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
65 Public bins must be provided throughout the car park to reduce littering. All bins
provided must be for refuse and recycling and be decanted into the bulk bins by the
site operators.
OPERATIONAL WORKS CONDITIONS
66 Advertising devices undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Page 25 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.