Cover Letter - Response RFI

of 2

Page text shows just the words. Original shows the document exactly as it was published.

         existing services,
      c) The existing garage is to be removed.
Response 1.2:
      a) Concept Plans show a shared driveway with widths and clearances in accordance with
         PSP6.
      b) Plans show the proposed driveway extents 300mm past the proposed access handle,
      c) Plans show a typical crossection with standard minimum clearance to new services and
         verge width suitable for screening,
      d) Plans show indicative house sites with car turning circles allowing cars to park and reverse
         inside the property to exit in a forward direction.


Issue 2: The development of the site (driveways and future dwellings and associated hardstand
areas) will significantly increase stormwater runoff from the site. No detail on how the stormwater
runoff will be controlled, collected and discharged has been provided.

Information required:
     1. Provide a preliminary stormwater management plan for the proposed development. The plan
        must be prepared by a suitably person, demonstrate compliance with the Water Quality and
       Drainage Code of The Noosa Plan 2020 and include but not to be limited to:
        a)      the discharge point within each lot;
        b)      the discharge point for the runoff from the driveway,
        c)      the connection to Council’s existing drainage system, and
        d)      any necessary inter-lot drainage easements.

Response 2.1: Concept Plans have the proposed interlot drainage stormwater management system
              adjacent to the combined driveway which will collect runoff from each lot and
              driveway then discharge to the existing gully pit via a stormwater pipe network. The
              plan shows that the system will be inside an interlot drainage easement.



Issue 3: It appears that the existing overhead power connections to the subject site and the adjoining
property (No 11A) cross over the adjoining properties.

Information required:
    1. Provide detail on the location of the existing overhead services and the proposed connections
        for the new lots.


  Response 3.1: The Concept Plans show how the overhead power supply can be changed to
              provide underground power to all three lots.




If you require any additional information or clarification please not hesitate to contact us.


Yours faithfully,
Callaghan & Toth



A D Toth BE Environmental RPEQ (Env) (civil) MIEAust CPEng NPER CPESC
Director
Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services
rendered




\\ct-server01\D\D\JOBS\CT Projects in progress\2217 9 Crystal St\Correspondence\Applications\Response NC RFI.docx
Log in to download the original file

Cover Letter - Response RFI.pdf · 74 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.