Original source · versioned page text
Bushfire Hazard Assessment & Management Plan v2 - 30 Pottery St Pomona 2021
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J000864 Lot 496 on MCH591 – 30 Pottery St, Pomona 5 BUSHFIRE IMPACT REDUCTION MEASURES 5.1 General The following section describes bushfire impact reduction measures to be incorporated into the proposed development to reduce the risk of bushfire impacts to people and property. Implementation of the identified measures is not implied nor intended to advocate that building occupants remain on the site during a bushfire event, nor that people and property will be protected from bushfire impacts. The measures are intended to reduce the potential severity of bushfire impact to the development and not prevent bushfire impact. The bushfire mitigation measures have been derived from: • Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019); and • Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient Communities. 5.2 Asset Protection Zones 5.2.1 General Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential bushfire impact to people and property situated in bushfire prone areas. For illustrative purposes, Plate 13 depicts the concept of an APZ surrounding a dwelling in a bushfire prone areas. Plate 13 – Asset Protection Zones The development has been confirmed to be located within a bushfire hazard area hence provision of adequate separation between the building envelopes nominated immediately flanking the western hazardous vegetation (i.e. Lot 8 in Stage 1 and Lots 8 and 9 in Stage 2) is required to provide a reasonable level of safety to site occupants and emergency services staff. The configuration of APZ’s is typically determined based on the results of the site-specific hazard assessment including risk of bushfire impact, flame length analysis, applicable AS3959-2018 Bushfire Attack Levels and SPP Assessment Benchmark setback requirements. In this instance, the assessed plan of development offers a minimum of 19m separation between the Lot 8-10 building envelopes and the VHC 9.1 open eucalypt forest, which is proposed to be protected within the conservation covenant. © 2021 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.