Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Att 3_Existing Approvals (compiled)

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (63.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                        (2)



       " <iOOdvin
               Ii Southwell, Architects.                                    24th December,1979




         (e)               car parking is to be provided on site for 31 vehicles and not
                           less than 29 of such car parles are to be covered. '!'heareas on which
                           vehicles will be driven and/or parked, are to be provided with a
                           suitably surfaced pavementprppar1y constructed and maintained to
                           good engineering standards to the satisfaction of the Council's
                           Engineer. Plans and specifications for such areas including
                           footpath CroSBingS are to be subm1ttedprior to the issue of a
                           building permit. Vehicular access to and from the site is to be
                           designed GOas to ensure that sufficient area is available for
                           manoeuvringand turning to permit forward IIlOvementto and from the
                           adjacent road. Access i. to be constructed to the satisfaction of
                           the Council'. Engineer.

           (f)            Connectionto Council's seweragesystem. •

          ('1)            Connectionto Council's water supply facilities.

          (lJ)            Stormwaterto be collected on site and disposed of to the existing
                          drainag in front of the proposed developmentin Haatings Strset. Access
                          ways to be grated at property boundaries & connected to stormwaterdrainage.
          (i)             Noearthworks or filling are to be carried. out on the site until
                          the requirements of the Council's Enqineer have been obtained in
                          writing. Such rfIqU1rements to be obtained prior to the !asue of
                          a building perlllit.

          (j)             CoIIlp1y
                                 with the reasonable requiBlente of .the RegiOnalFire Safety
                          Officer.

          (k)             '!'heapproval given herein is for TownPlan Consentonly and does
                          not imply either the issue of a building permit or Council consent
                          to an application under the Group Titles Act or Building Unit Titles
                          Act.

          (1)             Thi. approval will lapse if not availed of. within two years in
                          accordancewith Clause 3 (2) of Part II of Council by-laws, '1'oJIn
                                                                                           Planning.

          (Ill)          A certificate of al1gnm&nt is to be submit,tedwith the application for
                         building pendt and/or an identification survey to be carried out by
                         an authorised surveyor at the ti_ of the foundation inspection. To
                         ensure compliancewith any and all conditions of this approval, the
                         Council will require that a bank bond to be lodged to guaranteee
                         performance.    Thevalue of such bond will be $15,000and shall be
                         lodged prior to the issue of a building pend t and any COBtsincidential
                         thereto, will beCOlll8
                                              the responsibility of, the applicant.

         (n)             '!'heconditions of this consent are to be completedprior to occupancy
                         of the building and if this i. not done, the Council reserveB the
                        right to call on bondmoneyslodged to c rry out the works involved.

                                                                        Yours fa! thfully ,




                                                                       A.W.Dan.
                                                                       Shire Clerk.




Document Set ID: 20346164
Version: 1, Version Date: 28/06/2017
Log in to download the original file

Att 3_Existing Approvals (compiled).pdf · 63.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.