NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 12
35.3. A fire service (fully testable single detector check with metered bypass), where applicable, for flows
to fire hydrants and fire sprinkler systems (excluding fire hose reels).
Earthworks
36. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses.
37. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or
structures and/or lands that border the development site.
Site Stability
38. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
best suited for the proposed development. The recommendations of this report shall be incorporated into
the design and construction of the proposed development.
Erosion and Sediment Control
39. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
40. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $3,002
PSP16 – Sewerage Headworks Contributions $2,163
PSP17 – Water Supply Headworks Contributions $3,844
PSP20 – Pathway Trunk Network Contributions $1,350
TOTAL Contribution Amount = $10,359
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from September 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council’s Land Development Commercial
& Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the trading bank guarantee will be returned.
General
41. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work:-
41.1. Access and/or Carparking.
41.2. Stormwater Drainage.
41.3. Landscaping.
41.4. Erosion & Sediment Control
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4036265\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001446.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.