23. and any drainage required to drain these areas shall also be shown on the plans.
Frontage Works
24. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Grant frontage
of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass
shall be couch, free of weeds.
25. A contribution of $2,970 towards the construction of footpaths in the Grant Street local area shall be paid
to Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from September 2007 until the date of
payment.
26. All paths, driveways and turning areas shall be designed and constructed to ensure pedestrian safety
using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the
Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility.
27. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
28. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 3000 litres per attached dwelling/unit) that is installed to ensure water from the tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All
rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
(QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
for Building Works / Operational Works approval and any overflow shall be directed to the stormwater
drainage system.
29. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
drainage permitted to drain from the site shall be discharged to Council’s existing drainage structures at
the rear of the site. Plans of the drainage design shall be prepared by a Registered Professional Civil
Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works.
30. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
31. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
32. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
33. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
34. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
35. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
served by:
35.1. A single Body Corporate water meter to measure the total water consumption (including fire hose
reels, but excluding fire hydrants and fire sprinkler systems), and
35.2. Individual water meters to each tenement capable of being separately rated, and
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@d4036265\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001446.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.