Original source · versioned page text
Swmp
Very large file (11.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Nutrient Runoff:
Nutrients such as Nitrogen and Phosphorus can be mobilised and transported in Stormwater runoff from
the site. This can compromise Water Quality Objectives.
Potential Causes
• Runoff from hard surfaces within the site.
• Detergents used in car washing and similar activities.
• Fertilisers used in propagation of landscaped areas.
• Embodied nutrients contained in silt (topsoil) runoff.
• Embodied nutrients contained in runoff.
Mitigating Measures
• Fall vehicles pavement areas towards landscaping areas and the bioretention bed.
• Implement management plan for landscaping propagation. Use stable organically bound
fertilizers cultivated immediately prior to turf placement. Mulch over areas of exposed
topsoil.
• Construction of silt fences during construction and maintained beyond completion of
landscaping.
• Drain stormwater runoff through the Bio Basin.
• Capture roof runoff and store for re-use.
5.3.3 Proposed Treatment Measures
Following the water quality objectives for the site mentioned above, to ensure that on-site stormwater
management facilities can be economically maintained, it was deemed the most appropriate method for
treatment is the use of a small grass swale and an on-site bio-retention basin. Roof and surface runoff
will be collected by an internal drainage network and directed to the on on-site bio retention basin prior
to the lawful point of discharge.
5.3.4 Pollutant Modelling
The impact of the stormwater quality management strategy of runoff discharged from the site has been
assessed using the Pollutant Export Model, Model for Urban Stormwater Improvement
Conceptualisation (MUSIC).
For our model the proposed treatment train has been modelled: -
1. Roof water from buildings containing units 601-602, 201-204 and the rear portion of the
roofs for units 701-704 and 101-105 will be collected by a 14kL rainwater re-use tank
with overflow to the onsite Bio retention basin located in the north-eastern corner of the
SCG Consulting Engineers Page 11 SCG Ref: 33132(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.