site, we have labelled this Bio-retention Bed C. The rainwater tank will be re-used for
landscaping irrigation only, to all common areas.
2. Roof water from buildings containing units 401-404, 501-504 and the rear of units 601-
602 will be collected by a 14kL rainwater re-use tank with overflow to the onsite Bio
retention basin located in the South-eastern corner of the site. The rainwater tank will be
re-used for landscaping irrigation only, to all common areas, we have labelled this Bio-
retention Bed B
3. Roof water from the front of units 701-704 and 101-102 of the proposed development
will be collected by the internal roof drainage network to discharge to Eumundi Rd Kerb
& Channel
4. Surface runoff from hardstand and landscaping areas will be collected by various pits and
pipes. The internal drainage network will then discharge into the onsite bio retention
basins for treatment.
The Music Model was set up in accordance with the Water By Design Music Modelling Guidelines for
South East Queensland.
Figure 5.1 displays a print screen of the MUSIC Model Schematic for the proposed development and
Figure 5.2 displays the annual pollutant loads that will be discharged from the proposed development.
SCG Consulting Engineers Page 12 SCG Ref: 33132(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.