Table 6.1 - Adopted (IL) and (CL) Values
AREAS (IL) (CL)
(mm) (mm/hr)
Impervious 1 0
Pervious 27 2.6
Design ARR 2019 storms for Noosaville have been added into DRAINS using data obtained from the
ARR 2019 Data Hub accompanied with IFD rainfall depths from the Bureau of Meteorology (BOM)
website
Times of concentration (Tc) were calculated as defined in QUDM 2017 using a combination of standard
inlet time & overland sheet flow time. Table 6.2 displays the Adopted time of Concentrations.
Table 6.2 – Tc Values
STATE (Tc) (mins)
Pre Development 15
Post Development 6
6.1.1 Existing Catchments
The existing site consists of 4 Lots containing residential dwelling on each, detached sheds & landscaped
ground areas. The existing surface generally falls in a eastern direction towards the rear boundary. Roof
runoff from existing dwellings appears to be a mixture of discharging directly to ground level & via kerb
adaptors to Headland Drive.
The total impervious area has been estimated using the detailed site survey and was found approximately
19% Impervious Area (Fi = 0.19) which equates to approximately 1200m2.
The existing site catchment is as follows.
- Area – 0.6326 Ha
- Tc – 15 mins
- Fraction Impervious (Fi) – 0.19
Peak flow rates for the median design storm for the existing site are given in Table 6.3
SCG Consulting Engineers Page 15 SCG Ref: 33132(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.