Table 6.3 – Existing Site Peak Flow Rates (L/s)
Storm Event Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.5EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Existing PFR 111 160 216 251 295 352 391
(PFR – Peak Flow Rate)
6.1.2 Proposed Site
The development consists of the construction of residential townhouse/ unit development along with a
shared access driveway and ground level landscaping/ courtyards & a community pool area. The total
pervious area for the site was calculated to be approximately 1330m2 which equates to a fraction
impervious of 0.79.
The Developed site catchment is as follows.
- Area – 0.6326 Ha
- Tc – 6 mins
- Fraction Impervious (Fi) – 0.79
Peak flow rates for the median design storms for the developed site are given in Table 6.4
Table 6.4 – Developed Site Peak Flow Rates (L/s)
Storm Event Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Developed 184 232 286 347 399 468 523
PFR
(PFR – Peak Flow Rate)
6.1.3 Peak Flow Comparison
Table 6.5 indicates the increased peak flow rates for the developed cases.
Table 6.5 – Comparison of Existing Vs Developed Peak Flows (L/s)
AEP Q1 Q2 Q5 Q10 Q20 Q50 Q100
Storm (1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Increase 73 72 70 96 104 116 132
PF
(PF – Peak Flow )
SCG Consulting Engineers Page 16 SCG Ref: 33132(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.