Original source · versioned page text
Meeting papers
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
GENERAL COMMITTEE MEETING 19 JANUARY 2026
• Monitoring of rescue box is proposed to be undertaken on a minimum weekly basis.
Table 3 – 10 Year Cost Summary for Rescue Tube Boxes – Single Location
Table 4 identifies the cost of a broader scale roll out and is notionally based on 30 locations out of a
total of 67 formal beach accesses. The figures include the following assumptions:
• 3% CPI annual indexation
• Capital costs include purchases of 10 boxes in Years 1, 2, and 3.
• Equipment in each box includes rescue tube, adjustable set of fins, bleeding kit and resuscitation
mask.
• 3 yearly box replacement schedule (10 per year)
• Maintenance, monitoring, and vandalism costs are indexed annually at 3% CPI.
• Monitoring of rescue boxes is proposed to be undertaken weekly at 30 locations between
Sunshine Beach and Peregian to ensure each unit is serviceable and readily available.
• Monitoring cost includes labour and all-terrain vehicle annual charge
Table 4 – 10 year Cost Summary for Rescue Tube Boxes (30 locations)
Commentary
The capital cost to replace the boxes and equipment over a 10 year period for 30 locations is
projected to be $229,277.59. Council’s net operating cost to establish, maintain and monitor the
equipment over a 10 year period is projected to be $731,425.08.
Risk & Opportunities
This item has been collectively discussed within the report.
Page 105 of 141
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.