Original source · versioned page text
Meeting papers
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Section 7.7
7.7 Activation Levels
Table 7: Noosa LDMG Activation Levels
Triggers Actions Communications
ALERT A heightened level of Monitor situation closely – Chair and LDC
vigilance due to the watching brief. communicating remotely.
possibility of an event.
Initial advice to
s takeholders.
Refer LDC checklist.
LEAN FORWARD Operational state prior toEnsure relevant facilities Chair, LDC and LDMG
stand up. are set up and rosters members on mobile
developed as required and monitoring email
Heightened level of (e.g. LDCC and remotely.
situational awareness and evacuation centres)
a state of operational Ad-hoc reporting.
readiness. Formal briefing of LDMG.
Public information and
warnings initiated.
Refer LDC checklist.
STAND UP Threat is imminent. Activate staff and facilities Formal SITREP
Community has been or as needed (e.g. LDCC and reporting.
will be impacted. evacuation centres).
Resources are mobilised, Manage disaster operations.
personnel are activated,
and operational activities
commence.
STAND DOWN Transition from Implement plan to transition Final response
responding to an to recovery. SITREP to DDC.
event to normal core
business and/or recovery Debriefing and identification
operations. of lessons.
Noosa Council 2025 | Local Disaster Management Plan Page 56 of 73
Page 74 of 141
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.