                                                                               SDAP Responses
                                                                               Rising Main, Noosa

                                                                                                                                                          Response column key:
                                                                                                                                                               Achieved
10.1     Tidal works, or development in the coastal management district state code                                                                            P/S Performance solution
                                                                                                                                                              N/A Not applicable
Table 10.1.1: All development
Performance outcomes                        Acceptable outcomes                                              Response       Comment
PO1 Development in a coastal hazard         AO1.1 Development is located outside a high coastal                            Rising main is essential community infrastructure.
area is compatible with the level of        hazard area unless it is:
severity of the coastal hazard.             (1) coastal-dependent development, or
                                            (2) compatible with inundation due to its nature or
                                                function, or
                                            (3) temporary, readily relocatable, or able to be
                                                abandoned, or
                                            (4) essential community service infrastructure, or
                                            (5) small- to medium-scale tourist development, or
                                            (6) redevelopment within an existing built-up urban area,
                                                or is redevelopment of built structures that cannot be
                                                relocated or abandoned.
                                            AND

                                            AO1.2 Development referred to in AO1.1(6) avoids being                         Rising main generally located outside hazard area and is
                                            located within a high coastal hazard area, or where this is                     directionally drilled under Weyba Creek to reduce hazards
                                            not practicable, minimises the exposure of people and                           during construction.
                                            permanent structures to coastal hazard impacts.
PO2 Development siting, layout and          AO2.1 Development within a coastal hazard area is                              The new rising main will reduce the risk of further sewage
access in a coastal hazard area             located, designed, constructed and operated to maintain                         releases from the old rising main. The old rising main will be
responds to potential inundation due to a   or enhance the community’s resilience to defined storm                          decommissioned following completion of the new main.
defined storm tide event and minimises      tide events by limiting the exposure of people and
associated risks to personal safety and     structures to associated impacts.
property.                                   AND

                                            AO2.2 Development mitigates any residual impacts from            N/A            N/A
                                            storm tide inundation in a coastal hazard area including by
                                            ensuring:
                                            (1) habitable rooms of built structures are located above
                                                the defined storm tide event level and any additional


State development assessment provisions                                     Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                     Page 1 of 16
Full text of the other 15 pages

Page 2

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                      Acceptable outcomes                                               Response       Comment
                                              freeboard level that would ordinarily apply in a flood
                                              prone area under a relevant planning scheme
                                              standard, or
                                          (2) a safe refuge is available for people within the
                                              premises during a defined storm tide event, or
                                          (3) at least one evacuation route remains passable for
                                              emergency evacuations during a defined storm tide
                                              event, including consideration of the capacity of the
                                              route to support the evacuation of the entire local
                                              population within a reasonably short timeframe (for
                                              example, 12 hours).
                                          AND

                                          AO2.3 Development within a coastal hazard area is                 N/A            The development is the construction of a pipeline (sewer
                                          located, designed and constructed to ensure exposed                              rising main) which is not affected by flooding.
                                          structures can sustain flooding from a defined storm tide
                                          event.
                                          AND

                                          AO2.4 Essential community service infrastructure is:                            The rising main does not contain any valves etc that could
                                          (1) located so that it is not inundated by a recommended                         be inundated by storm tides.
                                              storm tide event specified for that infrastructure, or
                                          (2) located and designed to ensure any components of
                                              the infrastructure that are likely to fail to function or
                                              may result in contamination when inundated by a
                                              storm tide (for example, electrical switch gear and
                                              motors, water supply pipeline air valves) are:
                                              (a) located above the peak water level for a
                                                   recommended storm tide event, or
                                              (b) designed and constructed to exclude storm tide
                                                   intrusions or infiltration (including by being
                                                   located in the ground), or
                                              (c) able to temporarily stop functioning during a
                                                   recommended storm tide event without causing
                                                   significant adverse impacts to the infrastructure
                                                   or the community.
                                          AND
                                          AO2.5 Emergency services infrastructure and emergency             N/A            N/A
                                          shelters, police facilities, and hospitals and associated
                                          facilities have an emergency rescue area above the peak
                                          water level for a recommended storm tide event.



State development assessment provisions                                    Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                    Page 2 of 16

Page 3

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                             Acceptable outcomes                                              Response       Comment
PO3 Development directly, indirectly and         AO3.1 Development avoids increasing the number of                N/A            N/A
cumulatively avoids an unacceptable              premises from which people would need to be evacuated
increase in the severity of the coastal          to prevent death or injury from a defined storm tide event.
hazard, and does not significantly
increase the potential for damage on the
premises or to other premises.
PO4 Development avoids the release of            AO4.1 Development that involves the manufacture or               N/A            N/A
hazardous materials as a result of a             storage of hazardous materials in bulk are designed to:
natural hazard event.                            (1) prevent the intrusion of waters from a defined storm
Editor’s note: Applications should:                   tide event into structures or facilities containing the
                                                      hazardous materials, or
(1)   assess the risk of storm tide inundation
                                                 (2) ensure hazardous materials remain secured despite
      releasing or otherwise exposing
      hazardous materials, including                  inundation, including secure from the effects of
      appropriate emergency planning and              hydrodynamic forcing associated with wave action or
      contingency measures.                           flowing water.
(2)   applications are to be supported by a
      report certified by a Registered
      Professional Engineer of Queensland
      (RPEQ) that demonstrates this
      performance outcome will be achieved.
PO5 Natural processes and the                    AO5.1 Development in an erosion prone area within the                          The construction of the new rising main will be via
protective function of landforms and             coastal management district:                                                    directional drilling across Weyba Creek. Connections will
vegetation are maintained in coastal             (1) maintains vegetation on coastal landforms where its                         occur on both sides of the creek and the connection pits and
hazard areas.                                        removal or damage may:                                                      directional drill launch pit and exit pit will be stabilised with
                                                     (a) destablise the area and increase the potential                          vegetation to reduce erosion risk.
                                                          for erosion, or
                                                     (b) interrupt natural sediment trapping processes or
                                                          dune or land building processes
                                                 (2) maintains sediment volumes of dunes and near-shore
                                                     coastal landforms, or where a reduction in sediment
                                                     volumes cannot be avoided, increased risks to
                                                     development from coastal erosion are mitigated by
                                                     location, design, construction and operating
                                                     standards
                                                 (3) minimises the need for erosion control structures or
                                                     riverbank hardening through location, design and
                                                     construction standards
                                                 (4) maintains physical coastal processes outside the
                                                     development footprint for the development, including
                                                     longshore transport of sediment along the coast
                                                 (5) reduces the risk of shoreline erosion for areas
                                                     adjacent to the development footprint unless the



State development assessment provisions                                          Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                          Page 3 of 16

Page 4

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                      Acceptable outcomes                                                  Response       Comment
                                              development is an erosion control structure
                                          (6) reduces the risk of shoreline erosion for areas
                                              adjacent to the development footprint to the
                                              maximum extent feasible in the case of erosion
                                              control structures.
                                          AND

                                          AO5.2 Development in a storm tide inundation area is                               The directional drilling of the rising main means there are no
                                          located, designed, constructed and operated to:                                     impacts to mangroves, and very limited impacts to the
                                          (1) maintain dune crest heights, or where a reduction in                            coastal ecosystems. The impact areas are the launch pit,
                                               crest heights cannot be avoided, mitigate risks to                             connection pits and exit pits which will be rehabilitated with
                                               development from wave overtopping and storm tide                               vegetation.
                                               inundation                                                                     The emergency works were such to limit impacts to the
                                          (2) maintain or enhance coastal ecosystems and natural                              coastal ecosystems. The rising main was isolated quickly
                                               features, such as mangroves and coastal wetlands,                              and sewage flows redirected away from the broken rising
                                               between the development and tidal waters, where the                            main. Contaminated soil in Weyba Creek was removed and
                                               coastal ecosystems and natural features protect or                             taken offsite.
                                               buffer communities and infrastructure from sea-level
                                               rise and impacts from storm tide inundation.
                                          AND

                                          AO5.3 Redevelopment of built structures in the erosion               N/A            N/A
                                          prone area within a coastal management district:
                                          (1) avoids intensifying the use of the premises, or
                                          (2) demonstrates that any intensification of use will not
                                              result in an increase in the need for erosion control
                                              structures or riverbank hardening.
                                          AND

                                          AO5.4 Development that is coastal protection work                    N/A            N/A
                                          involves:
                                          (1) beach nourishment undertaken in accordance with a
                                               program of beach nourishment works that source
                                               sediment of a suitable quality and type from outside
                                               the active beach system, or
                                          (2) the construction of an erosion control structure,
                                               where it is demonstrated that installing an erosion
                                               control structure is the only feasible option for
                                               protecting permanent structures from coastal erosion
                                               and those structures cannot be abandoned or
                                               relocated in the event of coastal erosion occurring.
                                          Editor’s note: Applications for coastal protection work should be
                                          supported by a report certified by a Registered Professional


State development assessment provisions                                       Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                       Page 4 of 16

Page 5

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                       Acceptable outcomes                                                 Response       Comment
                                           Engineer of Queensland (RPEQ) that demonstrates how the
                                           engineering solution sought by the work will be achieved.

                                           Editor’s note: Applications for erosion control structures should
                                           demonstrate the consideration of beach nourishment techniques,
                                           and include a statement of why nourishment (in whole or part)
                                           has not been adopted as the preferred means of controlling the
                                           erosion risk.

                                           AND

                                           AO5.5 Development involving reclamation:                            N/A            N/A
                                           (1) does not alter, or otherwise minimises impacts on,
                                               the physical characteristics of a waterway or the
                                               seabed near the reclamation, including flow regimes,
                                               hydrodynamic forces, tidal water and riverbank
                                               stability
                                           (2) is located outside the active sediment transport area,
                                               or otherwise maintains sediment transport processes
                                               as close as possible to their natural state
                                           (3) ensures activities associated with the operation of the
                                               development maintain the structure and condition of
                                               vegetation communities and avoid wind and water
                                               run-off erosion.
                                           Editor’s note: Applications for reclamation should be supported
                                           by a report certified by an RPEQ that demonstrates how the
                                           engineering solutions sought by the work will be achieved

PO6 Erosion prone areas in a coastal       AO6.1 Development locates built structures outside the                            The works are essential community infrastructure.
management district are maintained as      part of the coastal management district that is the erosion
development free buffers, or where         prone area unless the development is listed under AO1.1
permanent buildings or structures exist,   (1) – (5).
coastal erosion risks are avoided or       AND
mitigated.

                                           AO6.2 Development is located outside the erosion prone                            The works are essential community infrastructure.
                                           area unless it is redevelopment.
                                           AND

                                           AO6.3 Coastal-dependent development:                                              The rising main is designed to withstand coastal erosion
                                           (1) locates, designs and constructs relevant buildings or                          impacts.
                                               structures to withstand coastal erosion impacts,
                                               including by use of appropriate foundations, or
                                           (2) installs and maintains coastal protection works to


State development assessment provisions                                       Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                       Page 5 of 16

Page 6

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                      Acceptable outcomes                                              Response       Comment
                                             mitigate adverse impacts to people and permanent
                                             structures from coastal erosion at the location.
                                          AND

                                          AO6.4 Development that is temporary, readily relocatable                       The rising main is located within an existing easement for
                                          or able to be abandoned, or essential community service                         sewage infrastructure and the design minimises the footprint
                                          infrastructure:                                                                 of the development.
                                          (1) locates built structures landward of an applicable
                                               coastal building line, or
                                          (2) where there is no coastal building line, locates
                                               habitable built structures landward of the alignment of
                                               adjacent habitable buildings, or
                                          (3) locates lifesaver towers or beach access
                                               infrastructure to minimise its impacts on physical
                                               coastal processes, or
                                          (4) where it is demonstrated that (1) or (2) is not
                                               reasonable and (3) does not apply:
                                                (a) locates built structures as far landward as
                                                     practicable
                                                (b) uses layout design to minimise the footprint of
                                                     the development that remains within the erosion
                                                     prone area.
                                          AND

                                          AO6.5 Redevelopment of existing built structures not             N/A            N/A
                                          referred to in AO6.4, and excluding marine development:
                                          (1) relocates built structures outside that part of the
                                               erosion prone area that is within the coastal
                                               management district, or
                                          (2) relocates built structures as far landward as
                                               practicable, and landward of an applicable coastal
                                               building line, or
                                          (3) where there is no coastal building line:
                                               (a) relocates built structures landward of the
                                                    alignment of adjacent habitable buildings, or
                                               (b) uses layout design to minimise the footprint of
                                                    the development that remains within the erosion
                                                    prone area, or
                                               (c) provides sufficient space seaward of the
                                                    development within the premises to allow for the
                                                    construction of erosion control structures.




State development assessment provisions                                   Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                   Page 6 of 16

Page 7

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                      Acceptable outcomes                                               Response       Comment
                                          AND

                                          AO6.6 Redevelopment of built structures in the erosion            N/A            N/A
                                          prone area within a coastal management district, which
                                          results in an intensification of use, mitigates the erosion
                                          threat to the development, having regard to:
                                          (1) design and construction standards
                                          (2) installing and maintaining on-site erosion control
                                              structures within the premises if the development is
                                              not intended to be temporary.
PO7 Development avoids or minimises       AO7.1 Coastal protection work that is in the form of beach        N/A            N/A
adverse impacts on coastal resources      nourishment uses methods of placement suitable for the
and their values, to the maximum extent   location that do not interfere with the long-term use of the
reasonable.                               locality of, or natural values within or neighbouring, the
                                          proposed placement site.
                                          AND

                                          AO7.2 Marine development is located and designed to               N/A            N/A
                                          expand on or redevelop existing marine infrastructure
                                          unless it is demonstrated that it is not practicable to
                                          co-locate the development with existing marine
                                          infrastructure.
                                          AND

                                          AO7.3 Marine development:                                         N/A            N/A
                                          (1) relies on a natural channel of a depth adequate for
                                              the intended vessels, or
                                          (2) where there are no feasible alternative locations for
                                              the facility in the local area that do not require
                                              dredging for navigation channel purposes:
                                              (a) involves capital dredging for new navigation
                                                   channel purposes
                                              (b) is located, designed and operated to minimise
                                                   the need for capital and subsequent
                                                   maintenance dredging for navigation channel
                                                   purposes.
                                          AND

                                          AO7.4 Development minimises dredging or the disposal                            The emergency works did not involve dredging.
                                          of material in coastal waters during key biological events
                                          (such as fish aggregations or spawning) for species found
                                          in the area.


State development assessment provisions                                    Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                    Page 7 of 16

Page 8

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                      Acceptable outcomes                                              Response       Comment
                                          AND

                                          AO7.5 Measures are to be incorporated as part of siting                        The directional drilling of the rising main means there are no
                                          and design of the development to protect and retain                             impacts to mangroves, and very limited impacts to the
                                          identified ecological values and underlying ecosystem                           coastal ecosystems. The impact areas are the launch pit,
                                          processes within or adjacent to the development site to                         connection pits and exit pits which will be rehabilitated with
                                          the greatest extent practicable. This includes:                                 vegetation.
                                          (1) maintaining or restoring vegetated buffers between
                                               development and coastal waters to the extent
                                               practicable, unless the development is within ports or
                                               airports, or is marine development
                                          (2) maintaining or enhancing the connectivity of
                                               ecosystems in consideration of the cumulative effect
                                               of the development in addition to existing developed
                                               areas
                                          (3) retaining coastal wetlands, seagrass beds and other
                                               locally important feeding, nesting or breeding sites for
                                               native wildlife.
                                          AND

                                          AO7.6 Measures are incorporated as part of siting and                          The directional drilling of the new rising main means there is
                                          design of the development to maintain or enhance water                          minimal potential impacts to the water quality of Weyba
                                          quality to achieve the environmental values and water                           Creek. Works will be conducted under a Construction EMP
                                          quality objectives outlined in the Environmental Protection                     which will detail measures for equipment and E&SC to
                                          (Water) Policy 2009.                                                            minimise impacts to water quality, in the areas adjacent to
                                          AND                                                                             the creek.
                                                                                                                          The emergency works were such to limit impacts to the
                                                                                                                          coastal ecosystems. The rising main was isolated quickly
                                                                                                                          and sewage flows redirected away from the broken rising
                                                                                                                          main. Contaminated soil in Weyba Creek was removed and
                                                                                                                          taken offsite.
                                                                                                                          Water quality testing has demonstrated that there has been
                                                                                                                          no long term impact to water quality objectives of the EPP
                                                                                                                          2009.
                                          AO7.7 Development avoids the disturbance of acid                               Works will be conducted under a CEMP and Unitywater
                                          sulphate soils, or where it is demonstrated that this is not                    construction standards. ASS will be managed to comply
                                          possible, the disturbance of acid sulphate soils is carefully                   with current standards and any PASS material will be
                                          managed to minimise and mitigate the adverse effects of                         treated accordingly.
                                          the disturbance on coastal resources.

PO8 Coastal protection work is            AO8.1 Coastal protection work is only undertaken to              N/A            N/A
undertaken only as a last resort where    protect existing permanent structures from imminent


State development assessment provisions                                   Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                   Page 8 of 16

Page 9

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                            Acceptable outcomes                                                  Response       Comment
erosion presents an imminent threat to          adverse coastal erosion impacts, and the structures
public safety or permanent structures.          cannot reasonably be relocated or abandoned.
Editor’s note: Applications for coastal         AND
protection work must be supported by a report
certified by an RPEQ that demonstrates how      AO8.2 Coastal protection work to protect private                     N/A            N/A
the engineering solution sought by the work     structures is undertaken on private land to the maximum
will be achieved.
                                                extent reasonable.
                                                AND

                                                AO8.3 Coastal protection work does not increase the                  N/A            N/A
                                                coastal hazard risk for adjacent areas or properties.

PO9 Development avoids adverse                  AO9.1 Development:                                                                 The directional drilling of the rising main means there are no
impacts on matters of state                     (1) is set back from matters of state environmental                                 impacts to mangroves, and very limited impacts to the
environmental significance, or where this           significance                                                                    coastal ecosystems. The impact areas are the launch pit,
is not reasonably possible, impacts are         (2) avoids interrupting, interfering or otherwise adversely                         connection pits and exit pits which will be rehabilitated with
minimised and an environmental offset is            impacting underlying natural ecosystem components                               native vegetation.
provided for any significant residual               or processes and interactions that affect or maintain
impacts to matters of state environmental           the matters of state environmental significance, such
significance that are prescribed                    as water quality, hydrology, geomorphology and
environmental matters.                              biological processes, or
                                                (3) incorporates measures as part of its location and
                                                    design to protect and retain matters of state
                                                    environmental significance and underlying ecosystem
                                                    processes within and adjacent to the development
                                                    site to the greatest extent practicable.
                                                Editor’s note: Applications for development should identify any
                                                threatened species or their habitats, or threatened ecosystems
                                                that may be affected by the proposal. In particular, applications
                                                should identify and describe how the development avoids
                                                adverse impacts on any critical life stage ecological processes
                                                within or adjacent to the development area.
                                                AND
                                                AO9.2 An environmental offset is provided for any                    N/A            N/A
                                                significant residual impact on matters of state
                                                environmental significance that are prescribed
                                                environmental matters caused by the development.
                                                Editor’s note: Applications for development should identify
                                                anticipated losses, and outline what actions are proposed to be
                                                undertaken to offset the loss in accordance with the Significant
                                                Residual Impact Guideline and the relevant Queensland
                                                Environmental Offsets Policy.



State development assessment provisions                                             Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                             Page 9 of 16

Page 10

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                        Acceptable outcomes                                              Response       Comment
PO10 Development maintains or               AO10.1 Development adjacent to state coastal land or             N/A            No restrictions to public access arise from this work.
enhances general public access to or        tidal water:                                                                    During emergency works part of the creek was closed but
along the foreshore, unless this is         (1) demonstrates that restrictions to public access are                         there was adequate space for boats to access Weyba
contrary to the protection of coastal             necessary for:                                                            Creek.
resources or public safety.                       (a) the safe or secure operation of development, or
                                                  (b) the maintenance of coastal landforms and
                                                        coastal habitat
                                            (2) separates residential, tourist and retail development
                                                  from tidal water with public areas or public access
                                                  facilities, or
                                            (3) maintains existing public access (including public
                                                  access infrastructure that is in the public interest)
                                                  through the site to the foreshore for:
                                                  (a) pedestrians, via access points including
                                                        approved walking tracks, boardwalks and
                                                        viewing platforms, or
                                                  (b) vehicles, via access points including approved
                                                        roads or tracks.
                                            AND

                                            AO10.2 Development adjacent to state coastal land,               N/A            No impacts to access along Weyba Creek or within the
                                            including land under tidal water:                                               waterway.
                                            (1) is located and designed to:
                                                 (a) allow safe and unimpeded access to, over,
                                                      under or around built structures located on, over
                                                      or along the foreshore
                                                 (b) ensure emergency vehicles can access the
                                                      area near the development, or
                                            (2) minimises and offsets any loss of access to and
                                                 along the foreshore within two kilometres of the
                                                 existing access points, and the access is located and
                                                 designed to be consistent with (1)(a) and (b).
                                            AND

                                            AO10.3 Any parts of private development that extend over         N/A            N/A
                                            tidal water are to be designed, constructed and used for
                                            marine access purposes only.

PO11 Private marine development             AO11.1 Private marine development and other structures           N/A            N/A
avoids structures attaching to, or          such as decks or boardwalks for private use do not attach
extending across, non-tidal state coastal   to, or extend across state coastal land that is situated
land abutting tidal waters.                 above the high water mark.


State development assessment provisions                                     Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                     Page 10 of 16

Page 11

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                          Acceptable outcomes                                                   Response       Comment
                                              Editor’s note: For occupation permits or allocations of State land,
                                              refer to the Land Act 1994.

PO12 Further development of artificial        AO12.1 The design, construction and operation of artificial                          N/A
                                                                                                                    N/A
waterways avoids or minimises adverse         tidal waterways maintains the tidal prism volume of the
impacts on coastal resources and their        natural waterway to which it is connected.
values, and does not contribute to:           AND
(1) an increase in the risk of flooding or
    erosion                                   AO12.2 The design, construction and operation of artificial                          N/A
                                                                                                                    N/A
(2) degradation of water quality              tidal waterways does not increase risk from flooding.
(3) degradation and loss of matters of        AND
    state environmental significance
                                              AO12.3 The design, construction and operation of an                                  N/A
    (including, but not limited to, coastal                                                                         N/A
    wetlands, fish habitat areas and          artificial waterway in connection with the reconfiguration of
    migratory species habitat).               a lot ensures:
                                              (1) water inlet and outlets structures are of sufficient
                                                    capacity to maintain the water quality within the
                                                    waterway
                                              (2) water discharged from the artificial waterway protects
                                                    the environmental values and water quality objectives
                                                    of the receiving waters
                                              (3) dredged material is not disposed of to tidal water
                                                    beyond the artificial waterway unless there is a
                                                    beneficial reuse, e.g. beach nourishment.
                                              Editor’s note: For more information on environmental values and
                                              water quality objectives see Schedule 1 of the Environment
                                              Protection (Water) Policy 2009.
                                              AND
                                              AO12.4 The location of the artificial waterways avoids                               N/A
                                                                                                                    N/A
                                              matters of state environmental significance, or does not
                                              result in any significant adverse impact on matters of state
                                              environmental significance.

PO13 Development does not involve                                                                                                  N/A
                                              No acceptable outcome is prescribed.                                  N/A
reclamation of land below tidal water,
other than for the purposes of:
(1) coastal-dependent development,
     public marine development or
     community infrastructure
(2) strategic ports, boat harbours or
     strategic airports and aviation
     facilities, in accordance with a


State development assessment provisions                                           Module 10 — Coastal protection          10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                            Page 11 of 16

Page 12

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                             Acceptable outcomes                                             Response       Comment
    statutory land use plan, where there
    is a demonstrated net benefit for the
    state or region and no feasible
    alternative exists
(3) coastal protection work or work
    necessary to protect coastal
    resources or physical coastal
    processes.



Table 10.1.2: Operational work
Performance outcomes                             Acceptable outcomes                                             Response       Comment
PO1 Tidal works that is private marine           AO1.1 The location and design of tidal works that is                           N/A
                                                                                                                 N/A
development does not result in adverse           private marine development:
impacts to tidal land.                           (1) is on private land abutting tidal water and used for
Editor’s note: In addressing this performance         property access purposes
outcome, the applicant should comply with the    (2) occupies the minimum area reasonably required for
performance criteria and acceptable standards
                                                      its designed purpose
set out in the Operational Policy Building and
engineering standards for tidal works,           (3) is not to be roofed or otherwise covered
Department of Environment and Heritage           (4) does not require the construction of coastal protection
Protection, 2013.                                     works, shoreline or riverbank hardening or dredging
                                                      for marine access
Editor’s note: Applications should be
                                                 (5) does not adversely impact on public safety or public
supported by a report certified by an RPEQ to
demonstrate compliance with this performance          access and use of the foreshore.
outcome.
PO2 Development does not result in the                                                                                          N/A
                                                 No acceptable outcome is prescribed.                            N/A
disposal of material dredged from an
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
      artificial waterway and the at-sea
      disposal of material that has
      previously been approved for the
      waterway.
PO3 The design and construction of an            AO3.1 The design and construction of the artificial                            N/A
                                                                                                                 N/A
artificial waterway maintains coastal            waterway provides for sand bypassing where this is
landforms.                                       necessary to prevent erosion of adjacent coasts and
                                                 minimise sedimentation of the waterway.


State development assessment provisions                                         Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                         Page 12 of 16

Page 13

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                        Acceptable outcomes                                               Response       Comment
                                            AND
                                            AO3.2 Clean sand accumulating within an artificial                               N/A
                                                                                                              N/A
                                            waterway is returned to the active beach system, in
                                            preference to disposal on land.
PO4 Development that involves dredging      AO4.1 A management plan for the development:                                    N/A
includes and complies with a                (1) directs the operation of the development
management plan that demonstrates how       (2) identifies disposal methods and disposal sites for the
environmental impacts will be managed           removed material for the construction and operational
and mitigated, and how the requirements         phases of the development
of the National assessment guidelines for   (3) outlines how any adverse effects from extraction
dredging, Australian Government                 activities on sediment transport processes or
Department of the Environment, Water,           adjacent coastal landforms will be mitigated or
Heritage and the Arts, 2009, will be met.       otherwise remediated by suitably planned and
                                                implemented beach nourishment and rehabilitation
                                                works.
                                            Editor’s note: The development should comply with the National
                                            assessment guidelines for dredging, Australian Government
                                            Department of Environment, Water, Heritage and the Arts, 2009.
                                            AND
                                            AO4.2 For land based disposal of dredged material, any                          The emergency works did not involve any dredging.
                                            area used for storing, dewatering, drying or rehandling
                                            dredged material as outlined in the dredge management
                                            plan is:
                                            (1) of sufficient size for the projected volume of dredged
                                                material from relevant capital or maintenance
                                                dredging
                                            (2) protected from future development that would
                                                compromise the use of the area for its intended
                                                purpose of material storage and dewatering.
                                            AND
                                            AO4.3 For at-sea disposal of suitable dredged material,           N/A            N/A
                                            the dredge management plan specifies that material is
                                            placed at a dredged material disposal site only if it is
                                            demonstrated that it is not feasible to:
                                            (1) dispose of the material above the high water mark, if
                                                 the material is from maintenance works for an
                                                 existing artificial waterway for which at-sea disposal
                                                 was previously approved, or
                                            (2) keep the dredged material within the active sediment
                                                 transport system for the locality, or


State development assessment provisions                                      Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                      Page 13 of 16

Page 14

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                        Acceptable outcomes                                                  Response       Comment
                                            (3) use the material for beach nourishment or another
                                                beneficial purpose.
                                            AND
                                            AO4.4 For at-sea disposal of dredged material where the              N/A            N/A
                                            marine spoil disposal site is a retentive (i.e. non-
                                            dispersive) site, the disposal site identified in the dredge
                                            management plan has the capacity to hold and retain the
                                            material within its boundaries during construction and
                                            operation of the development.
                                            Editor’s note: The use of dredged material for a beneficial
                                            purpose could include development of port or other marine
                                            facilities, use for construction or industrial purposes, or use to
                                            create or modify land or waters for an approved environmental
                                            outcome (such as creation of a bird roosting site). Further
                                            information about beneficial uses is contained in the National
                                            assessment guidelines for dredging, Australian Government
                                            Department of Environment, Water, Heritage and the Arts, 2009

Within a strategic environmental area: riparian and wildlife corridor functions
PO5 Where clearing of native marine         AO5.1 Clearing of marine plants is minimised and an                  N/A            No clearing of marine plants is required for the emergency
plants cannot be avoided and the extent     environmental offset is for any significant residual impact                         works or the construction of the new rising main.
of clearing has been minimised, an          from the clearing
environmental offsets is provided for any
significant residual impact from the        AND
clearing.
                                            AO5.2 Any clearing of marine plants is limited to the                N/A            N/A
                                            minimum area required for the works and to allow for
                                            maintenance.

                                            Editor’s note: Applications for development should identify
                                            whether there is likely to be a significant residual impact and a
                                            need for an environmental offset having regard to Section 3.9
                                            (Marine plants) of the Significant Residual Impact Guideline and
                                            the relevant Queensland Environmental Offsets Policy.
PO6 Natural regeneration of any cleared     AO6.1 There is no impediments to the natural                                       Mossman Court will be stabilised with grass and any
or work area is facilitated wherever        regeneration of native plant species in the area of clearing                        impacts to existing vegetation will be mitigated. On Lot 606
possible.                                   and works following completion of works.                                            the disturbed areas will be replanted with Lomandra species
                                                                                                                                and native ginger species to stabilise the area and
                                                                                                                                accommodate natural regeneration.
PO7 Development avoids or minimises         AO7.1 Development avoids, or minimises adverse                                     The construction works for the new rising main are
adverse impacts on fish passage.            impacts on fish passage during works and the carrying out                           directionally drilled. The emergency works were limited to a
                                            of the activity.                                                                    3x3m area within the creek and fish passage was



State development assessment provisions                                         Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                         Page 14 of 16

Page 15

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                       Acceptable outcomes                                               Response       Comment
                                                                                                                            maintained.
PO8 Development avoids or minimises        AO8.1 Works are located, designed, and constructed to                           The directional drill of the rising main and no clearing on the
impacts on fish habitat values.            minimise impacts on fish habitat values and function.                            banks of Weyba Creek ensure there are no impacts to fish
                                                                                                                            habitat values for the new works.
Within a strategic environmental area: hydrological processes
PO9 Development avoids or minimises       No acceptable outcome is prescribed.                                             The construction of the new rising main will not impact
impacts on natural drainage lines or flow                                                                                   natural drainage lines. The drill pits and connection pits will
paths, during both construction and                                                                                         be reinstated to existing surface levels and conditions.
operation.
Within a strategic environmental area: water quality
PO10 Development avoids or minimises       AO10.1 Development demonstrates best practice                                   The emergency works involved removing any contaminated
any adverse impacts on environmental       environmental management to meet relevant                                        soil from the sewer split. The works involved redirecting
values and water quality objectives for    environmental values and water quality objectives of the                         sewage flows and isolating the rising main whilst it has been
receiving waters (surface and              Environmental Protection (Water) Policy or relevant to the                       repaired. The new rising main will replace the faulty rising
groundwater) from pollutants on site or    ERA to be carried out on the site.                                               main to reduce risk of further breakages.
leaving a site located in a strategic
environmental area.                        OR

                                           AO10.2 All stormwater, wastewater, discharges and                               The emergency works involved removing any contaminated
                                           overflows leaving the site are:                                                  soil from the sewer split. The works involved redirecting
                                                                                                                            sewage flows and isolating the rising main whilst it has been
                                           (1) treated to the quality of the receiving waters prior to                      repaired. The new rising main will replace the faulty rising
                                               discharge, OR;                                                               main to reduce risk of further breakages.

                                           (2) reclaimed or re-used such that there is no export of
                                               pollutants to receiving waters.


Table 10.1.3: Reconfiguring a lot
Performance outcomes                       Acceptable outcomes                                               Response       Comment
PO1 Erosion prone areas in a coastal       AO1.1 Where reconfiguring a lot is proposed within the            N/A            N/A
management district are maintained as      coastal management district, the erosion prone area
development free buffers, or where         within the lot, or land within 40 metres of the foreshore
permanent buildings or structures exist,   (whichever is greater), is surrendered to the State for
coastal erosion risks are avoided or       public use unless:
mitigated.                                 (1) the development is in a port or is for coastal-
                                                dependent development, or
                                           (2) the surrender of the land will not enhance coastal
                                                management outcomes, for example, because there
                                                is already substantial development seaward of the lot.



State development assessment provisions                                     Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                     Page 15 of 16

Page 16

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                      Acceptable outcomes                                                   Response       Comment
                                          Editor’s note: Land surrendered to the State for public use under
                                          AO1.1 is to be:
                                          (1)   placed in a State land reserve for beach protection and
                                                coastal management purposes under the Land Act 1994,
                                                with local government as trustee, or
                                          (2)   managed for beach protection and coastal management
                                                purposes under another management regime to the
                                                satisfaction of the chief executive administering the
                                                Sustainable Planning Act 2009 and Land Act 1994, if it is
                                                demonstrated that AO1.1(1) cannot be reasonably
                                                achieved.
                                          (3)   The Land Act 1994 also includes provisions for voluntary
                                                land surrender for freehold land to the satisfaction of the
                                                chief executive administering the Land Act.
PO2 Development maintains or              AO2.1 Reconfiguring a lot that abuts the foreshore or tidal           N/A            N/A
enhances general public access to or      waters is designed to enhance public access if it involves
along the foreshore, unless this is       the creation of 10 or more lots or the opening of a new
contrary to the protection of coastal     road, unless it is for coastal-dependent development.
resources or public safety.
PO3 Development in connection with a      AO3.1 The canal avoids intersecting with land or tidal land           N/A            N/A
canal enhances public access to coastal   where the passage, use or movement of vessels in water
waters.                                   could be restricted by the registered proprietor of the land.
                                          AND

                                          AO3.2 The area of the canal relating to the development               N/A            N/A
                                          is surrendered to the State as a public waterway.
                                          AND

                                          AO3.3 The plans of subdivision for the canal are                      N/A            N/A
                                          consistent with Requirements for plans of subdivision of
                                          an artificial waterway, Department of Environment and
                                          Heritage Protection, 2013.




State development assessment provisions                                        Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                        Page 16 of 16

Used in these records

About this file

File size
271 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sdap-response-template-v1-6-10-1.pdf · 271 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.