Performance outcomes                      Acceptable outcomes                                               Response       Comment
                                              freeboard level that would ordinarily apply in a flood
                                              prone area under a relevant planning scheme
                                              standard, or
                                          (2) a safe refuge is available for people within the
                                              premises during a defined storm tide event, or
                                          (3) at least one evacuation route remains passable for
                                              emergency evacuations during a defined storm tide
                                              event, including consideration of the capacity of the
                                              route to support the evacuation of the entire local
                                              population within a reasonably short timeframe (for
                                              example, 12 hours).
                                          AND

                                          AO2.3 Development within a coastal hazard area is                 N/A            The development is the construction of a pipeline (sewer
                                          located, designed and constructed to ensure exposed                              rising main) which is not affected by flooding.
                                          structures can sustain flooding from a defined storm tide
                                          event.
                                          AND

                                          AO2.4 Essential community service infrastructure is:                            The rising main does not contain any valves etc that could
                                          (1) located so that it is not inundated by a recommended                         be inundated by storm tides.
                                              storm tide event specified for that infrastructure, or
                                          (2) located and designed to ensure any components of
                                              the infrastructure that are likely to fail to function or
                                              may result in contamination when inundated by a
                                              storm tide (for example, electrical switch gear and
                                              motors, water supply pipeline air valves) are:
                                              (a) located above the peak water level for a
                                                   recommended storm tide event, or
                                              (b) designed and constructed to exclude storm tide
                                                   intrusions or infiltration (including by being
                                                   located in the ground), or
                                              (c) able to temporarily stop functioning during a
                                                   recommended storm tide event without causing
                                                   significant adverse impacts to the infrastructure
                                                   or the community.
                                          AND
                                          AO2.5 Emergency services infrastructure and emergency             N/A            N/A
                                          shelters, police facilities, and hospitals and associated
                                          facilities have an emergency rescue area above the peak
                                          water level for a recommended storm tide event.



State development assessment provisions                                    Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                    Page 2 of 16

Used in these records

About this file

File size
271 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sdap-response-template-v1-6-10-1.pdf · 271 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.