Council archive · source document
sdap-response-template-v1-6-10-1 · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd
Performance outcomes Acceptable outcomes Response Comment
Editor’s note: For occupation permits or allocations of State land,
refer to the Land Act 1994.
PO12 Further development of artificial AO12.1 The design, construction and operation of artificial N/A
N/A
waterways avoids or minimises adverse tidal waterways maintains the tidal prism volume of the
impacts on coastal resources and their natural waterway to which it is connected.
values, and does not contribute to: AND
(1) an increase in the risk of flooding or
erosion AO12.2 The design, construction and operation of artificial N/A
N/A
(2) degradation of water quality tidal waterways does not increase risk from flooding.
(3) degradation and loss of matters of AND
state environmental significance
AO12.3 The design, construction and operation of an N/A
(including, but not limited to, coastal N/A
wetlands, fish habitat areas and artificial waterway in connection with the reconfiguration of
migratory species habitat). a lot ensures:
(1) water inlet and outlets structures are of sufficient
capacity to maintain the water quality within the
waterway
(2) water discharged from the artificial waterway protects
the environmental values and water quality objectives
of the receiving waters
(3) dredged material is not disposed of to tidal water
beyond the artificial waterway unless there is a
beneficial reuse, e.g. beach nourishment.
Editor’s note: For more information on environmental values and
water quality objectives see Schedule 1 of the Environment
Protection (Water) Policy 2009.
AND
AO12.4 The location of the artificial waterways avoids N/A
N/A
matters of state environmental significance, or does not
result in any significant adverse impact on matters of state
environmental significance.
PO13 Development does not involve N/A
No acceptable outcome is prescribed. N/A
reclamation of land below tidal water,
other than for the purposes of:
(1) coastal-dependent development,
public marine development or
community infrastructure
(2) strategic ports, boat harbours or
strategic airports and aviation
facilities, in accordance with a
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6 Page 11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sdap-response-template-v1-6-10-1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 271 KB (small file)
- File type
No other editions are linked here.