Council archive · source document
sdap-response-template-v1-6-10-1 · OPW15/0240
Attached to the e-mail OPW15/0240 - Operational Works Application.
_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd
Performance outcomes Acceptable outcomes Response Comment
statutory land use plan, where there
is a demonstrated net benefit for the
state or region and no feasible
alternative exists
(3) coastal protection work or work
necessary to protect coastal
resources or physical coastal
processes.
Table 10.1.2: Operational work
Performance outcomes Acceptable outcomes Response Comment
PO1 Tidal works that is private marine AO1.1 The location and design of tidal works that is N/A
N/A
development does not result in adverse private marine development:
impacts to tidal land. (1) is on private land abutting tidal water and used for
Editor’s note: In addressing this performance property access purposes
outcome, the applicant should comply with the (2) occupies the minimum area reasonably required for
performance criteria and acceptable standards
its designed purpose
set out in the Operational Policy Building and
engineering standards for tidal works, (3) is not to be roofed or otherwise covered
Department of Environment and Heritage (4) does not require the construction of coastal protection
Protection, 2013. works, shoreline or riverbank hardening or dredging
for marine access
Editor’s note: Applications should be
(5) does not adversely impact on public safety or public
supported by a report certified by an RPEQ to
demonstrate compliance with this performance access and use of the foreshore.
outcome.
PO2 Development does not result in the N/A
No acceptable outcome is prescribed. N/A
disposal of material dredged from an
artificial waterway into coastal waters,
with the exception of:
(1) reclamation works, or
(2) coastal protection works, or
(3) the maintenance of an existing
artificial waterway and the at-sea
disposal of material that has
previously been approved for the
waterway.
PO3 The design and construction of an AO3.1 The design and construction of the artificial N/A
N/A
artificial waterway maintains coastal waterway provides for sand bypassing where this is
landforms. necessary to prevent erosion of adjacent coasts and
minimise sedimentation of the waterway.
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sdap-response-template-v1-6-10-1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 271 KB (small file)
- File type
No other editions are linked here.