Performance outcomes Acceptable outcomes Response Comment
(3) use the material for beach nourishment or another
beneficial purpose.
AND
AO4.4 For at-sea disposal of dredged material where the N/A N/A
marine spoil disposal site is a retentive (i.e. non-
dispersive) site, the disposal site identified in the dredge
management plan has the capacity to hold and retain the
material within its boundaries during construction and
operation of the development.
Editor’s note: The use of dredged material for a beneficial
purpose could include development of port or other marine
facilities, use for construction or industrial purposes, or use to
create or modify land or waters for an approved environmental
outcome (such as creation of a bird roosting site). Further
information about beneficial uses is contained in the National
assessment guidelines for dredging, Australian Government
Department of Environment, Water, Heritage and the Arts, 2009
Within a strategic environmental area: riparian and wildlife corridor functions
PO5 Where clearing of native marine AO5.1 Clearing of marine plants is minimised and an N/A No clearing of marine plants is required for the emergency
plants cannot be avoided and the extent environmental offset is for any significant residual impact works or the construction of the new rising main.
of clearing has been minimised, an from the clearing
environmental offsets is provided for any
significant residual impact from the AND
clearing.
AO5.2 Any clearing of marine plants is limited to the N/A N/A
minimum area required for the works and to allow for
maintenance.
Editor’s note: Applications for development should identify
whether there is likely to be a significant residual impact and a
need for an environmental offset having regard to Section 3.9
(Marine plants) of the Significant Residual Impact Guideline and
the relevant Queensland Environmental Offsets Policy.
PO6 Natural regeneration of any cleared AO6.1 There is no impediments to the natural Mossman Court will be stabilised with grass and any
or work area is facilitated wherever regeneration of native plant species in the area of clearing impacts to existing vegetation will be mitigated. On Lot 606
possible. and works following completion of works. the disturbed areas will be replanted with Lomandra species
and native ginger species to stabilise the area and
accommodate natural regeneration.
PO7 Development avoids or minimises AO7.1 Development avoids, or minimises adverse The construction works for the new rising main are
adverse impacts on fish passage. impacts on fish passage during works and the carrying out directionally drilled. The emergency works were limited to a
of the activity. 3x3m area within the creek and fish passage was
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6 Page 14 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sdap-response-template-v1-6-10-1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 271 KB (small file)
- File type
No other editions are linked here.