Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

sdap-response-template-v1-6-10-1 · OPW15/0240

Attached to the e-mail OPW15/0240 - Operational Works Application.

of 16

Text shows just the words. Original shows the document exactly as it was published.

_______________________________________________________________________________________________________________________________________________Callaghan & Toth Pty Ltd

Performance outcomes                        Acceptable outcomes                                                  Response       Comment
                                            (3) use the material for beach nourishment or another
                                                beneficial purpose.
                                            AND
                                            AO4.4 For at-sea disposal of dredged material where the              N/A            N/A
                                            marine spoil disposal site is a retentive (i.e. non-
                                            dispersive) site, the disposal site identified in the dredge
                                            management plan has the capacity to hold and retain the
                                            material within its boundaries during construction and
                                            operation of the development.
                                            Editor’s note: The use of dredged material for a beneficial
                                            purpose could include development of port or other marine
                                            facilities, use for construction or industrial purposes, or use to
                                            create or modify land or waters for an approved environmental
                                            outcome (such as creation of a bird roosting site). Further
                                            information about beneficial uses is contained in the National
                                            assessment guidelines for dredging, Australian Government
                                            Department of Environment, Water, Heritage and the Arts, 2009

Within a strategic environmental area: riparian and wildlife corridor functions
PO5 Where clearing of native marine         AO5.1 Clearing of marine plants is minimised and an                  N/A            No clearing of marine plants is required for the emergency
plants cannot be avoided and the extent     environmental offset is for any significant residual impact                         works or the construction of the new rising main.
of clearing has been minimised, an          from the clearing
environmental offsets is provided for any
significant residual impact from the        AND
clearing.
                                            AO5.2 Any clearing of marine plants is limited to the                N/A            N/A
                                            minimum area required for the works and to allow for
                                            maintenance.

                                            Editor’s note: Applications for development should identify
                                            whether there is likely to be a significant residual impact and a
                                            need for an environmental offset having regard to Section 3.9
                                            (Marine plants) of the Significant Residual Impact Guideline and
                                            the relevant Queensland Environmental Offsets Policy.
PO6 Natural regeneration of any cleared     AO6.1 There is no impediments to the natural                                       Mossman Court will be stabilised with grass and any
or work area is facilitated wherever        regeneration of native plant species in the area of clearing                        impacts to existing vegetation will be mitigated. On Lot 606
possible.                                   and works following completion of works.                                            the disturbed areas will be replanted with Lomandra species
                                                                                                                                and native ginger species to stabilise the area and
                                                                                                                                accommodate natural regeneration.
PO7 Development avoids or minimises         AO7.1 Development avoids, or minimises adverse                                     The construction works for the new rising main are
adverse impacts on fish passage.            impacts on fish passage during works and the carrying out                           directionally drilled. The emergency works were limited to a
                                            of the activity.                                                                    3x3m area within the creek and fish passage was



State development assessment provisions                                         Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6                                                                                                                                                                         Page 14 of 16

Used in these records

About this file

File size
271 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

sdap-response-template-v1-6-10-1.pdf · 271 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.