Performance outcomes Acceptable outcomes Response Comment
AND
AO7.5 Measures are to be incorporated as part of siting The directional drilling of the rising main means there are no
and design of the development to protect and retain impacts to mangroves, and very limited impacts to the
identified ecological values and underlying ecosystem coastal ecosystems. The impact areas are the launch pit,
processes within or adjacent to the development site to connection pits and exit pits which will be rehabilitated with
the greatest extent practicable. This includes: vegetation.
(1) maintaining or restoring vegetated buffers between
development and coastal waters to the extent
practicable, unless the development is within ports or
airports, or is marine development
(2) maintaining or enhancing the connectivity of
ecosystems in consideration of the cumulative effect
of the development in addition to existing developed
areas
(3) retaining coastal wetlands, seagrass beds and other
locally important feeding, nesting or breeding sites for
native wildlife.
AND
AO7.6 Measures are incorporated as part of siting and The directional drilling of the new rising main means there is
design of the development to maintain or enhance water minimal potential impacts to the water quality of Weyba
quality to achieve the environmental values and water Creek. Works will be conducted under a Construction EMP
quality objectives outlined in the Environmental Protection which will detail measures for equipment and E&SC to
(Water) Policy 2009. minimise impacts to water quality, in the areas adjacent to
AND the creek.
The emergency works were such to limit impacts to the
coastal ecosystems. The rising main was isolated quickly
and sewage flows redirected away from the broken rising
main. Contaminated soil in Weyba Creek was removed and
taken offsite.
Water quality testing has demonstrated that there has been
no long term impact to water quality objectives of the EPP
2009.
AO7.7 Development avoids the disturbance of acid Works will be conducted under a CEMP and Unitywater
sulphate soils, or where it is demonstrated that this is not construction standards. ASS will be managed to comply
possible, the disturbance of acid sulphate soils is carefully with current standards and any PASS material will be
managed to minimise and mitigate the adverse effects of treated accordingly.
the disturbance on coastal resources.
PO8 Coastal protection work is AO8.1 Coastal protection work is only undertaken to N/A N/A
undertaken only as a last resort where protect existing permanent structures from imminent
State development assessment provisions Module 10 — Coastal protection 10.1 Tidal works, or development in the coastal management district state code
6 July 2015 V1.6 Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
sdap-response-template-v1-6-10-1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 271 KB (small file)
- File type
No other editions are linked here.