dee in accordance with Clause 3 of Part II of Council's By-laws,
Chapter XLIV (Town Planning), Council's approval is valid for a
period of two (2) years at the expiration of which period the
Council may take action to revoke its approval if in the opinion
of the Council, substantial progress has not been made in erecting
the building or other structure the subject of the consent permit;
or the land, the subject of the consent permit, is not being used
substantially in accordance with the purposes for which consent
was granted.
Ra een eet f— tn, Jest oe — ete ete dete tod t
13. Ar rodeneri reaction survey-of—the-subject-site—is—te—be CaLELEG-OU
-
14, To—ensure—compliance_with any and all conditions.of this approval,
Council will x paix ~ that—you-enter—into a~Bank-Bond_to-guarantee .
“perfermanee-—-The-value—ef—such-bond—would-be—determined—and_would
BR a+: by lod
re tedged—prier—to—issu £—a, building—permit—and—any—eests
ineidential—therete-will—be—the-applicant's_responsibility.
15. TR mditier £this—pexrmit are—to—be.completed_prior to
iiding—and-ifthis—is net—done,-Council reserves
the-right—te—eall—en—bend. moneys—lLedgea—to carry-—out—the-works—involved.
16. Provisien—shall_be-made—for the—storage—and—removal..of_—refuse—in
aceordance_with—the-Council's_policies and—to—the-requirements—of
of
the—Council's Health Surveyor.
eceupaney—of—th
17. Filling, other development works or the erection of any buildings or
other structures shall be carried out so as not to cause any ponding
of water on adjoining land or any blockage or interference with any
natural water course or in any other way unduly affect adjoining property.
In any case where it is unavoidable that the proposed development
May cause any of the above disabilities, such remedial drainage or other
works shall be carried out to the requirements of the Shire Engineer. Se
The design of such works shall be approved by the Shire Engineer prior *
to the issue of a Building Permit.
18. The approval given herein is tor the venaing of tane-away” sea foods and
does not permit the provision and serving of meals and refreshments for
consumption on the land and/or premises,
19. Bitumen sealed pavement widening (from the edge or the existing pitumen to
the existing kerb and channel) acceleration aanes, deceleration lanes,
passing lanes and associated tapers etc, shall be provided to the Main
Roads Department and Shire Engineer's requirements,
20. The stormwater runoff from all paved and roofed ares shall be collected on site
and disposed of to the existing kerb and channel to the requirements of the
Shire Engineer.
21. The site shall be filled in accordance with Council's Master Drainage Plan,
the minimum floor level of the proposed building shall comply with Counc?l's
requirements,
22. Health Surveyors requirements
a ees requirements
The applicant is to submit two (2) copies of detatled plans showing the interior
fitting, fixtures and finish details to the proposed food premises, Such plans
to be approved by Council's Senior Health Surveyor prior to construction,
The premises to be constructed to comply with the requirements of Council's Food
Code and the Food Hygene Regulations 1976,