Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2018-09-17 General Committee Agenda

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 SEPTEMBER 2018




                                         Page 19 of 48

GENERAL COMMITTEE MEETING AGENDA                                                             17 SEPTEMBER 2018

                                                            11
                                                    Noosa Shire Council
                                               Charges Resolution (No.3) 2018

                             ACro._  is the adopted charge rate for reconfiguring a lot stated in section 8.3
                                     (Adopted charge rate).
                             Qro. _ is the total no of lots.
                            Cc       is the credit stated in section 8.4 (Credit).
                             Note:

                                     (a)  for residential lot reconfiguration, the adopted infrastructure charge
                                          is apportioned across all networks;
                                     (b)  for non-residential lot reconfiguration, the adopted infrastructure
                                          charge apportionment excludes the stormwater charge component.
                                          The stormwater charge will      be calculated   and   issued  on  a
                                          subsequent material change of use or building work approval when
                                          the impervious area is able to be determined.
                    (2)      An_  infrastructure charge that may be levied for a material change of use or
                             building work for residential development is generally calculated as follows:
                             LCr = (Sum(ACr x Qr) for each defined use) - C
                             Where:
                             LCr     is the infrastructure charge that may be levied for a material change of
                                     use or building work for residential development.
                             ACr     is the adopted charge rate for each defined use for a material change of
                                     use or building work for residential development stated in section 8.3
                                     (Adopted charge rate).
                            Qr       is the residential quantity for each defined use.
                            Cc       is the credit stated in section 8.4 (Credit).
                    (3)      An infrastructure charge that may be levied for a material change of use or
                             building work for non-residential development is generally calculated as follows:
                             LC = LCynr+ LCsw
                             Where:

                             Lc      is the infrastructure charge that may be levied for the total development
                             LCnr = (Sum of (AC x Qa) for each defined use) - C4
                             LCsw= (ACsw X Qsw) - Csw
                             LCynr   is the infrastructure charge that may be levied for a material change of
                                     use or building work for non-residential development for the transport,
                                     public parks and land for community facilities, water supply and
                                     sewerage networks.
                             LCsw _ is the levied charge for a material change of use or building work for
                                     non-residential development for the stormwater network.

                                         Council Resolution effective 24 September 2018

                                                                                                       Page 19 of 48
Log in to download the original file

2018-09-17 General Committee Agenda(PDF, 20MB).pdf · 20.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.