2018-09-17 General Committee Agenda

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (20.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 SEPTEMBER 2018




                                         Page 20 of 48

GENERAL COMMITTEE MEETING AGENDA                                                             17 SEPTEMBER 2018

                                                            12
                                                    Noosa Shire Council
                                               Charges Resolution (No.3) 2018

                             AC,     is the adopted charge rate for each defined use for a material change of
                                     use or building work for non-residential development stated in section
                                     8.3 (Adopted charge rate) for the transport, public parks and land for
                                     community facilities, water supply and sewerage networks.
                             ACsw _ is the adopted charge rate for a material change of use or building work
                                     for non-residential development stated in section 8.3 (Adopted charge
                                     rate) for the stormwater network.
                            Qa       is the non-residential quantity for each defined use.
                             Qsw     is the impervious area of the development.
                             C4      is the credit stated in section 8.4 (Credit) for the transport, public parks
                                     and land for community facilities, water supply and sewerage networks.
                             Cow     is the credit stated in section 8.4 (Credit) for the stormwater network.
                    (4)      An infrastructure charge is only levied if the calculation in sub-sections (1), (2)
                             and (3) results in an amount greater than $zero (i.e. no refund applies should the
                             calculated charge result in a negative amount).
           8.3      Adopted charge rate
                    The adopted charge rate for:
                             (a)     reconfiguring a lot, is the amount stated for Residential (3 or more
                                     bedroom dwelling unit) in Table 10.3 (Schedule of adopted charges);
                             (b)     a material change of use or building work for:
                                    (i)       residential development, is stated in Table 10.3 (Schedule of
                                              adopted charges);
                                    (ii)      non-residential development other than special uses, is stated in
                                             Table 10.3 (Schedule of adopted charges), which comprises the
                                             following:
                                              (A)     the adopted charge rate for the transport, public parks
                                                      and land for community facilities, water and sewerage
                                                      networks; and
                                              (B)     the adopted charge rate for the stormwater network;
                                    (ili)     non-residential development    being  special  uses   or  other
                                              development not otherwise identified in paragraphs (i) or (ii):
                                              (A)     the adopted charge rate for the transport, public parks
                                                      and land for community facilities, water supply and
                                                      sewerage networks,     is the charge for the charge
                                                      category that the local government determines should
                                                      apply for the use at the time of assessment; and
                                              (B)     the adopted charge rate for the stormwater network

                                         Council Resolution effective 24 September 2018

                                                                                                       Page 20 of 48
Log in to download the original file

2018-09-17 General Committee Agenda(PDF, 20MB).pdf · 20.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.