Noosa Shire Council
Charges Resolution (No.3) 2018
AC, is the adopted charge rate for each defined use for a material change of
use or building work for non-residential development stated in section
8.3 (Adopted charge rate) for the transport, public parks and land for
community facilities, water supply and sewerage networks.
ACsw _ is the adopted charge rate for a material change of use or building work
for non-residential development stated in section 8.3 (Adopted charge
rate) for the stormwater network.
Qa is the non-residential quantity for each defined use.
Qsw is the impervious area of the development.
C4 is the credit stated in section 8.4 (Credit) for the transport, public parks
and land for community facilities, water supply and sewerage networks.
Cow is the credit stated in section 8.4 (Credit) for the stormwater network.
(4) An infrastructure charge is only levied if the calculation in sub-sections (1), (2)
and (3) results in an amount greater than $zero (i.e. no refund applies should the
calculated charge result in a negative amount).
8.3 Adopted charge rate
The adopted charge rate for:
(a) reconfiguring a lot, is the amount stated for Residential (3 or more
bedroom dwelling unit) in Table 10.3 (Schedule of adopted charges);
(b) a material change of use or building work for:
(i) residential development, is stated in Table 10.3 (Schedule of
adopted charges);
(ii) non-residential development other than special uses, is stated in
Table 10.3 (Schedule of adopted charges), which comprises the
following:
(A) the adopted charge rate for the transport, public parks
and land for community facilities, water and sewerage
networks; and
(B) the adopted charge rate for the stormwater network;
(ili) non-residential development being special uses or other
development not otherwise identified in paragraphs (i) or (ii):
(A) the adopted charge rate for the transport, public parks
and land for community facilities, water supply and
sewerage networks, is the charge for the charge
category that the local government determines should
apply for the use at the time of assessment; and
(B) the adopted charge rate for the stormwater network
Council Resolution effective 24 September 2018
Page 20 of 48See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.