Original source · versioned page text
Appendix D - Bushfire Hazard Assessment and Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnOR
Landscaping management maintains a potential available fuel load which is less than eight tonnes/hectare
in aggregate, and fuel structure which is discontinuous.
OR
Development includes a bushfire management plan for the maintenance of any identified asset protection
zone, including landscape design and ongoing vegetation management.
To reduce the potential for bushfire impact to the Lot 2 dwelling as a result of future landscaping,
regrowth and fuel load accumulation within the site, the 21m APZ is to be established and maintained
according to the following criteria:
The APZ is maintained as a low threat zone dominated by a maintained grassy surface cover to a
nominal 100mm height which is regularly mowed to reduce fuel loads and the risk of a grassfire
encroaching toward the building
Any landscaping within the APZ satisfies the low threat vegetation criteria prescribed in section
2.2.3.2 of AS3959:2018 and be planted as discrete isolated clumps of low flammability vegetation
aligned parallel to the building to aid in interception of ember and smoke attack and not
perpendicular and in a manner which could transmit fire toward the building
No trees or large shrubs are to be retained or planted within 10m of the building and no tree limbs
are to extend to within 6m of the roof line
No woody mulch is to be used within 2m of the church building
Landscaping only incorporates locally indigenous, low flammability species and or low density
plantings of suitable open forest /woodland species with low bark shedding characteristics
Surface fuels and woody regrowth be controlled in the APZ to maintain a low fuel load
environment. Roof tops, roof gutters and other areas of the building are to be regularly inspected,
and debris removed to reduce the risk of spot fires developing during a bushfire event
In accordance with Assessment Benchmark 7 of the SPP Bushfire, the APZ is to be designed to
ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in aggregate and
with a fuel structure that remains discontinuous.
6.3 FIREBREAKS
A risk of fire impact has been identified from the west of the site. The proposed new allotment adjoins
the hazardous vegetation to the west; however, approximately 60m of cleared open space is located
between the proposed building envelope and the vegetation to the west. Furthermore, the new Lot 2
dwelling is to be provided with a minimum 21m dedicated APZ consisting of cleared grassed separation
to the west of the new dwelling. The allotment is located on flat land and is generally cleared of
vegetation, hence offers suitable operating conditions for emergency services with excellent exposure to
the forest edge to the west. Therefore, no formal firebreaks are considered necessary. The development
will rely on the other bushfire risk management measures detailed within this management plan to reduce
the bushfire risk to an acceptable level.
DECEMBER 2021 BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN Page: 19
21 JIRRIMA CRESCENT, COOROIBAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.