Original source · versioned page text
Appendix D - Bushfire Hazard Assessment and Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn6.4 WATER SUPPLY
The proposed development will not be connected to a reticulated water supply. As per Acceptable
Outcome 3.2 of the Noosa Plan Bushfire Hazard Overlay Code, where there is no available reticulated
water supply, the premises has:
a) an accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water
volume of not less than 5,000 litres; and
b) a water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting
connected to the water supply (other than where the water supply is in a swimming pool or dam).
A permanent dam with volume far in excess of 5,000 litres is located approximately 60m to the east of
the proposed Lot 2 building envelope. The existing formed access track traverses immediately adjacent to
the dam and a concrete culvert crossing provides a solid access point for water extraction for fire-fighting
purposes.
Plate 8: Water supply point
DECEMBER 2021 BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN Page: 20
21 JIRRIMA CRESCENT, COOROIBAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.