220623 Church Rehab 'B'

Attached to the e-mail EMAIL 3 OF 3 - MCU22/0031 and OPW22/0062 - INFORMATION REQUEST RESPONSE.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                                                                                                                                                                            11c Church St, Pomona
                                                                                                                                                                                                                                                                                                                                                                                                         Re abilitation Plan
                                                                                                                                                                                                                                                                                                                                                            For Operational                    orks evelopment Application
                                                                                                                                                                                                                                                                                                                                                                                                                   NE 2022



                                                                                                                                                                       F2    F2    F2




                                                                                                                                                                 LP3



                                                                                                                                                                                        F3
                                                                                                                                                                  F1
                                                                                                                                                                                                                                                                                  The following landscape operational works plan package consists of the following schedule of
                                                                                                                                                                                                                                                                                  drawings;

                                                                                                                                                                                                                                                                                             LD1               eneral Notes S eet ayout Site ocation
                                                                                                                                                                                                                                                                                             LD2             Project Specifications
                                                                                                                                                                                                                                                                                             LD3             Finis es Sc edule Planting Sc edule
                                                                                                                                                                                  F3                                                                                                         LD4             Typical etails

                                                                                                                                                                                                                                                                                             LP1-3              andscape Re abilitation Plan


                                                                                                                                                                             F1                                                                                                   This package has been developed to comply with;
                                                        W
                                                                                                                                                                                                                                                                                  0020 C OP V 040322
                                                                      Tel Pow




                                                            ate
                                                                  r



                                                                                                                                                                                                                                                                                  Noosa Plan 2020
                                                                        er




                                                                                                                                                                                                                                                                                  Sources;
                                                                                                                                                                                                                                                                                  ·    Engineering Ba Engineering
                                                                                                                                                                                                                                                                                  ·    Planners Pace Planning
                                                                                                                                                                                                                                                                                  ·

                                                                                                                                                                       LP2
                                                                                                                                                                                                                                                                                       Building esign All esign   rafting
                                                                                                    Tel
                                                                                                        Power




                                                                                                                                                                                                                                                                                  ·    Ecology Pace Planning
                                                                                                            Water




                                                                                                                                                                                                                                                                                  ·    Bus fire EBA
                                                                                          225PVC




                                                                                                                                                                                                                                                                                  Certifications;
                                                                                                                                                                                                                                                                                  ·      Furnis A it follo ing certifications prior to on maintenance inspection;
                                                                                Telstra

                                                                                            Power




                                                                                                                                                                                                                                                                                         AS 2303:2015
                                                                                                                                                                                   F1




                                                                                                                                                                                                                                                                                         AS4419 Soil Certification
                                                                                                                                                                                                                                                                                             C     eed free Pest Free
                                                                                                                    Power
                                 MH




                                                                                                                                                                                                                                                                                         Soil ept certification it p otograp ic evidence
                                                                                                                             Telstra




                                                                                                                                                                                                                                                                                  Sample Approvals;
                                                                                                                                                                                   F1




                                                                                                                                                                                                                                                                                  ·   Furnis A it follo ing samples for A approval prior to construction;
                                                                                                                                                                                                                                                                                        oop Pine ulc
                                                                                                                                                                                                                                                                                       Sugar Cane ulc




                                            94




                                                                                                                                                                            LP1
                                                                                                                                             Telstra




                                               .3
                                                                                                                            WM
                                                                                                                            WM




                                                                                                                                              Power
                                                                                                                            WM

                                                                                                                            Water
                                      NBN




                                                    0
                                                                                                                             Water




                                                                                                                                                       Telstra




                                                                                                                                                                                                                                 H
                                HHY




                                                                                                                                       HHY




                   Mat




                                                                                                                                                                                             CHURCH ST




                                                                                                                                                                                                                                                                                                                                   11 CHURCH ST, POMONA




              SHEET KEY LAYOUT                                                                                                                                                                                                                           N.T.S              SITE LOCATION                                                                                                                N.T.S




Client                                                                                                                                       Project                                                                                                                                                                       NORT                                  TITLE:                JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                                                                 anembo consultants
                                                                                                                                                                                                                                                                                                                                                                                       FILE:    220623
Alba Projects Pty Ltd                                                                                                                        11c Church St, Pomona                                                                                                                                                                                                                     DWG. No. LD1
                                                                                                                                                                                                                                                                                                                                                                                                                 Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                 Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                     Project Management


This document is the copyright of anembo consultants & shall                                                                                 Rehabilitation Plan                                                                                                            B     23.06.22     AMENDMENTS        CK   TH
                                                                                                                                                                                                                                                                                                                                                                 GENERAL NOTES,        SHEET 1 OF 7              anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                 Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                   A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                               Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                                                            A     17.06.22 COUNCIL SUBMISSION    CK   TH                                         SHEET LAYOUT & SITE     NTS                     Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                              email: [email protected]                www.anembo.com
                                                                                                                                                                                              ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE    DATE        DESCRIPTION      DRWN CKD   APPROVED:   T Hindley ALIA 713        LOCATION                NTS
Log in to download the original file

220623 Church Rehab 'B'.pdf · 3.3 MB (large file)

The download may take up to a minute.

Full text of the other 6 pages

Page 2

                                                                                                                                               T ice eekly during prolonged rain
REHABILITATION WORKS SPECIFICATIONS                                                     · All stockpiles are to be protected it suitable erosion control devices     graded to                       TREE PROTECTION MEASURES                                                                                 OPERATIONS - DISTURBED AREAS
This plan has been developed to comply with the Noosa Shire Council                       ensure control of runoff                                                                                   · T e follo ing tree protection measures must at all times be ad ered to during any                      · Identify eeds If unsure consult A All ot er vegetation to be protected and
Planning Scheme as applicable where practical                                           · Coordinate installation of sediment erosion control devices it civil contractor to                           on site orks generally in accordance it AS49 0 2009 protection of trees on                                 retained
ABBREVIATIONS                                                                             ensure compatibility consistency in control measures                                                         development sites A ill advise ere measures are required at Pre start but is                           · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
AS Australian Standard                                ot dipped                         · All e posed surfaces once completed s all be immediately stabili ed to prevent                               generally to standard s of e isting trees t at are s o n as re abilitation areas                       · ecompact ground and cultivate to 5mm deep
EP Establis ment Period                           A andscape Arc itect                    erosion                                                                                                    · Prior to commencement of orks t e contractor to organise a pre construction                            · rade ground surface to create smoot falls a ay from pat s ere necessary
N A Not applicable                               OC On centre                                                                                                                                          meeting to identify trees for protection removal and or pruning                                        · Remove all ant ropogenic rubbis
  P   aintenace Period                           m2 Square metres                       EDGING                                                                                                       · Protective fencing is to be installed around t e tree protection one generally in                      · Obtain a report by a qualified person identifying at tree maintenance measures
m3 Cubic etres                                   T P Typical                            Spade Edge                                                                                                     accordance it AS49 0 2009 prior to site establis ment and remain intact and                                are required and utili e a qualified person to conduct t e orks
NATA National Association of Testing Aut orities S PER Superintendent                   · Install Spade Cut edge as located on plans        as per detail                                              monitored and certified by t e project arborist until completion of orks                               · op dead dying or dangerous limbs or trees as required to remove risk of injury to
uPVC    nplasticised polyvinyl C loride Pipe     NSC Noosa S ire Council                                                                                                                             · Refer to etail for protective fencing specifications                                                     users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
  B     ater by esign                             AO andscape Assessment Officer        REHABILITATION AREAS                                                                                         · Any orks it in t e tree protection one to be supervised by t e project arborist                          ground surface it in regeneration ones at least 5 meters from pat s and ot er
                                                                                        Soil                                                                                                         · Activities it in t e tree protection one are to be aut orised and supervised by t e                      infrastructure
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE                               · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils                              project arborist No compaction from ve icles pedestrian movement stockpiling of                        · All felled vegetation is to be retained on site resultant mulc is to be used in
· Apart from declared eeds all e isting vegetation s all be retained as been               andscape contractor to coordinate it civil contractor to ensure topsoil is                                  top soil e cavation no dumping of aste or cutting it in t e root one s is to                             revegetation landscaping or soil stabilisation activities
  identified it retention protection measures for suc are nominated erein                 re installed per t e follo ing specifications in respective landscape areas                                  occur                                                                                                  · Add 100mm ulc to all disturbed areas
· Identified areas are confined to areas of eed management t ose nominated on           · Clear remove all non organic deleterious and large organic matter suc as rocks                             · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
  t ese plans it associated orks described erein                                          greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to                              project arborist to ensure t at t e correct arboreal tec niques are utilised                           OPERATIONS - UNDISTURBED AREAS
Plant sc edules derived from NSC To n Plan Table SC 3 4 3 Closed Forest                   be landscaped                                                                                                                                                                                                       · Identify eeds If unsure consult A All ot er vegetation to be protected and
                                                                                        · E cavate and remove off site any remaining fill to turf and garden areas to ensure                         VEGETATION MANAGEMENT PROTECTION PROGRAM                                                                     retained
Rainforest Areas Species and EBA Bus fire itigation Report Appendi E Plant
Species ist                                                                               correct dept s for topsoils                                                                                 Issue                         Vegetation management - clearing & protection
                                                                                                                                                                                                                                                                                                              · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
                                                                                        · andscape contractor to conduct soils analyses tests to stockpiled topsoils and                                                                                                                                      · Remove all ant ropogenic rubbis
                                                                                          ameliorate per recommendations prior to re spreading Furnis la it results                                                                                                                                           · op dead dying or dangerous limbs or trees as required to remove risk of injury to
                                                                                           andscape contractor to allo for for p balancing nutrient ameliorations all soil                            Objective                       Identify areas of vegetation individual trees to be                       users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
                                                                                                                                                                                                                                      protected retained it in t e development areas t ose
                                                                                          testing to be conducted by a lab accredited by NATA                                                                                                                                                                   ground surface it in regeneration ones at least 5 meters from pat s and ot er
                                                                                                                                                                                                                                      to be cleared
                                                                                                                                                                                                                                                                                                                infrastructure
                                                                                                                                                                                                                                      Ensure t at orkers understand t e requirements of
                                                                                        Cultivate                                                                                                                                                                                                             · All felled vegetation is to be retained on site mulc is to be used in revegetation
PROJECT DESCRIPTION                                                                                                                                                                                                                   protection retention install protective devices to
                                                                                        · Cultivate ground in all disturbed areas to a dept         ere possible to 5mm dept for                                                      ensure no accidental damage occurs                                        landscaping or soil stabilisation activities
 THIS WORK COMPRISES OF;
                                                                                          inspection before installation of soil re ab                                                                                                Ensure t at clearing met ods are appropriate for areas                  · Identify location for supplement planting for canopy integrity
                                                                                        · Avoiding any root systems                                                                                                                   being cleared especially in t e vicinity of areas to be
    1)        CONSTRUCTION WORKS:                                                                                                                                                                                                                                                                             WEED REMOVAL SCHEDULE
              a Retaining associated drainage                                                                                                                                                                                         protected
                                                                                        Mulch                                                                                                                                         Ensure t at t e ork program is suc as to minimise t e                       Task                  Operation                                     Frequency
              b Installation of slope drainage stabilisation products
                                                                                        · Organic and inorganic mulc es are required to be installed over all garden areas                                                            time bet een en clearing occurs t e cleared ground                                                Remove entire plant by and Alternatively kill Follo ing
              c Tree protection fencing                                                                                                                                                                                                                                                                           Herbaceous            plant it erbicide application using ick iper identification of
                                                                                              ere s o n on t e dra ings                                                                                                               is stabilised to reduce t e c ances of silt movement
                                                                                        · All mulc es supplied must be clean free from live eeds eed seeds specifically                                                               Ensure t at cleared material is mulc ed or ood c ipped                      and small             or ooded spray no le For erbaceous eeds eeds As
              REHABILITATION OF EXISTING VEGETATION WORKS;                                                                                                                                                                            as appropriate or disposed of in an approved manner                         weed control          cut or scrape stem and paint it 1:1 mi of     required to kill
                                                                                          nutsedge pests soil borne viruses and diseases Furt er S PER it certifications
              a Installation of supplementary trees s rubs to improve canopy e tent                                                                                                                                                                                                                                                     glyp osate and ater                             eeds
                                                                                          respectively for approval prior to installations
                bio diversity                                                                                                                                                                                                          Ensure vegetation to be retained is correctly identified
                                                                                          ulc types include:                                                                                          Tasks                                                                                                                               rill and fill or frilling erbicide is delivered into Follo ing
                                                                                        · Forest Blend ulc 100mm dept to all revegetation areas                                                                                        clearly marked protective devices are installed                            Large and             sap ood via drilled oles or frill cut pockets          identification of
              REVEGETATION OF DEGRADED LAND;                                                                                                                                                                                           maintained in functional condition                                                               immediately after ound is made If
                                                                                        · Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept                                                                                                                                           woody weed                                                                     eeds As
              a Installation of supplementary trees s rubs to create ne canopy and                                                                                                                                                     Vegetation to be retained protected s all be as                                                  accessibility permits cut stump met od Cut             required to kill
                                                                                                                                                                                                                                                                                                                  control
              increase bio diversity                                                                                                                                                                                                   nominated per plan field adjusted on site by la                                                  tree 30mm above ground and paint stump it                eeds
                                                                                        TUBESTOCK PLANTING, SETOUT & TREE GUARD
                                                                                                                                                                                                                                       Protection fence s all be used to protect vegetation                                             undiluted glyp osate
                                                                                        · Bamboo stake setout of trees and s rubs for approval by S PER                                                                                nominated for retention Fence to be as per detail
    2)        VEGETATION MANAGEMENT & PROTECTION;
                                                                                        · Setout to be staggered and random to account for terrain variation and replicate                                                                                                                                                              Remove aste material containing flo ers or                 Follo ing
                                                                                                                                                                                                                                                                                                                  Remove or             seeds or eed species from site t at can s oot
                                                                                          natural c aracter                                                                                                                            Integrity of protection devices                                                                                                                             identification of
    3)        WEED MANAGEMENT - CONSTRUCTION PHASE                                                                                                                                                     Performance                                                                                                manage                from pieces of plant ispose of at approved
                                                                                        · Install tubes per re abilitation sc edules densities specifications         details                                                          Retained vegetation trees retained in good ealt                  it        vegetative
                                                                                                                                                                                                                                                                                                                                                                                                     eeds As
              a eed management under e isting canopy of all oody oods and                                                                                                                              indicators                                                                                                                       facility aste material to be covered en
                                                                                        · Install tree guard in nominated location as per detail                                                                                       no scars from eart orks mac inery                                          waste
                                                                                                                                                                                                                                                                                                                                                                                                   required to kill
              reduction of erbaceous grassy eeds                                                                                                                                                                                                                                                                                        removing from site                                           eeds
                                                                                        · aintain as per sc edule
                                                                                         andscape contractor to ater plantings during construction period                                                                             eekly inspection             log by responsible person
    4)        WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE                                                                                                                                          Frequency
                                                                                        VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting                                                                                                                                            ·      ere furt er detail is required follo industry standards and met odologies or
                                                                                                                                                                                                                                                                                                                  contact S PER
1. CONSTRUCTION WORKS                                                                    Trees:                 At end of 12 month At end of 2 yr                       3 Yr Off                                                    Responsible person for contractor reporting to super
                                                                                                                                                                                                       Responsible
PRELIMINARIES                                                                            Criteria               establishment      establishment                        maintenance                                                                                                                           WEED MANAGEMENT - MAINTENANCE PHASE
                                                                                                                                                                                                       person
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an                            and maintenance    and maintenance                      Objective                                                                                                                             · T is plan as been developed to specify regeneration operations for t e e isting
  t ose indicated on t ese plans       boundaries All services related infrastructure                           period             period                                                                                            ont ly for eac separable portion of contract to site
                                                                                                                                                                                                       Reporting                                                                                                  riparian one
  including street lig ting s o n on t ese plans are indicative only                                                                                                                                                                construction manager
                                                                                         Percentage of          85%                         90%                         95%                                                                                                                                   · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· Call dial before you dig 11 00 prior to any excavation.                                                                                                                                                                                                                                                         landscaping decision notice and site environmental management plan
· Plan dimensions take precedence over scaled dimensions                                 plants alive                                                                                                                                 ake good or replace any damage to trees or vegetation
                                                                                                                                                                                                       Corrective
· Prior to commencing construction orks verify in t e field dimensions levels            and healthy                                                                                                                                t at are marked for protection and retention; reinstate
                                                                                                                                                                                                       action                                                                                                 OBJECTIVES
                                                                                                                                                                                                                                    protective devices
  location of site services refer engineer s dra ings generally                          Average height         1000mm                      2000mm                      3000mm                                                                                                                                1 To en ance t e ecological value of t e locality
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans                                                                                                                                                                                                                         2 To remove eeds and minimise future incursion
                                                                                         Shrubs:                At end of 12 month At end of 12 month                   Off
      ere discrepancies occur it in landscape documentation refer to A prior to
                                                                                         Criteria               establishment      establishment
                                                                                                                                                                                                     WEED MANAGEMENT - CONSTRUCTION PHASE                                                                     3 Encourage natural recruitment and regeneration
                                                                                                                                                                        maintenance
  provision of tender pricing or construction
                                                                                                                and maintenance    and maintenance                                                   · T is plan as been developed to specify regeneration operations for t e e isting                        4 Re abilitate degraded areas
                                                                                                                                                                        Objective
· All proposed fence alignments e cept vegetation protection fencing are to be                                                                                                                         riparian one                                                                                           5 Satisfy t e recreational requirements of residents as ell as t e ecological
                                                                                                                period             period
  pegged by a licensed surveyor in coordination it project surveyor                                                                                                                                  · NOTE: T e regeneration plan must be read in conjunction it t e operational orks                           requirements of a flora and fauna reserve
                                                                                         Percentage of          85%                         90%                         95%                            landscaping decision notice and site environmental management plan
SEDIMENT & EROSION CONTROL                                                               plants alive                                                                                                                                                                                                         · From practical completion all maintenance activities as per follo ing sc edule need
·     ere applicable T e landscape contractor to implement maintain for t e              and healthy                                                                                                 OBJECTIVES                                                                                                   to be conducted until project completion
  contract duration best practice erosion sediment control measures in accordance                                                                                                                    1 To en ance t e ecological value of t e locality
    it t e manual for erosion sediment control maroon manual good                        Average height                                                                                              2 To remove eeds and minimise future incursion
                                                                                                                400mm                       1000mm                      1200mm
  environmental practice t e consulting civil engineers specification for erosion        or width                                                                                                    3 Encourage natural recruitment and regeneration
  sediment control Penalties fines for non compliance ill apply                                                                                                                                      4 Re abilitate degraded areas
                                                                                        2. VEGETATION MANAGEMENT & PROTECTION
· Install silt control fencing in accordance it site environmental management plan                                                                                                                   5 Satisfy t e recreational requirements of residents as ell as t e ecological
                                                                                        · Native vegetation e ists on site In order to ma imise t e retained ecological values
  local aut ority regulations                                                                                                                                                                           requirements of a flora and fauna reserve
                                                                                          for t e site nominated e isting vegetation requires protection         management
· Sediment erosion control devices to be installed ere necessary as directed on
                                                                                        · Natural vegetation regeneration needs to be encouraged
  site by super                                                                                                                                                                                      PRELIMINARIES
                                                                                        · Site eed removal is important to allo regeneration
· All sediment erosion control devices are to be installed in accordance it                                                                                                                          · Before ork commences t e S PER is to organise a pre start meeting it t e
                                                                                        · Vegetation to be protected is plan nominated predominately native species in a
  manufacturer s specifications                                                                                                                                                                        landscape arc itect and NSC environment landscape officer to establis scope of
                                                                                           ealt y safe condition t at are not located so as to interfere it required
· T e contractor is responsible for ensuring sediment erosion control devices are                                                                                                                        orks management procedures and clarify any issues
                                                                                          approved site orks
  inspected maintained
                                                                                        · T e follo ing table summari es t e vegetation management program elements;                                 ·    ere any discrepancies occur refer to A

                                                                                                                                                                                                     OPERATIONS - DISTURBED AREAS

Client                                                                  Project                                                                                                                                                                             NORT                               TITLE:                    JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                    anembo consultants
                                                                                                                                                                                                                                                                                                                         FILE:   220623
Alba Projects Pty Ltd                                                   11c Church St, Pomona                                                                                                                                                                                                                            DWG. No. LD2
                                                                                                                                                                                                                                                                                                                                                                    Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                    Environmental
                                                                                                                                                                                                                                                                                                                                                                                                        Project Management


This document is the copyright of anembo consultants & shall            Rehabilitation Plan                                                                                                                   B    23.06.22   AMENDMENTS          CK   TH
                                                                                                                                                                                                                                                                                               DRAINAGE RESERVE    SHEET 2 OF 7                                     anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                    Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                      A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                  Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                              A    17.06.22 COUNCIL SUBMISSION    CK   TH                                      REHABILITATION        NTS                                            Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                 email: [email protected]                www.anembo.com
                                                                                                                             ISSUE   DATE    DESCRIPTION    DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE    DATE      DESCRIPTION        DRWN CKD   APPROVED:   T Hindley ALIA 713     SPECIFICATION NOTES   NTS

Page 3

                             Rehabilitation Species Schedule Rationale
                             T e plants in t e follo ing table are a list of species t at c aracterise closed forest rainforest in t e Pomona area and ave been generally derived from NSC To n Plan Table
                             SC6.3.4.3 Closed Forest/Rainforest Areas Species and are confirmed as appropriate for t is re abilitation program in t e Ecological Assessment Report by Pace Planning
                             T e species in t e table are also c aracterised in accordance it         ld State government bus fire vegetation mapping guidelines of providing a potential fuel load of less t an 8 t a
                             as required by t e Bus fire itigation Report F 5 01 by Eldon Bottc er Arc itect



                                                 PLANT SCHEDULE 1                                                                                                                                                     PLANT SCHEDULE 4
                                                 New & Existing Banks To Be Rehabilitated Supplementary Canopy Trees                                                                                                  General Landscape Revegetation
                                                  BOTANICAL NAME                            POT SIZE        SUGGESTED Zone 1A           Zone 1B     Zone 1C      Zone 1D      Zone 1E                                 BOTANICAL NAME                                     POT SIZE            SUGGESTED Zone A
                                                                                                            SPACING    (95m²)            (115m²)     (458m²)      (105m²)     (365m²)                                                                                                        SPACING    (95m²)



                                                  TREES                                                                                                                                                               TREES
                                                  ACMENA smithii                              200mm            1/20m2           1             1           2            -         2                                    ACMENA smithii                                       200mm               1/16m2                1
                                                  AGATHIS robusta                             200mm            1/20m2           1             1           2            -         2                                    AGATHIS robusta                                      200mm               1/16m2                1
                                                  BACKHOUSIA citriodora                       200mm            1/20m2           1             1           2            -         1                                    BACKHOUSIA citriodora                                200mm               1/16m2                1
                                                  CASTANOSPERMUM australe                     200mm            1/20m2           1             -           2            -         1                                    CASTANOSPERMUM australe                              200mm               1/16m2                1
                                                  ELAEOCARPUs obovatus                        200mm            1/20m2           1             -           2            1         2                                    ELAEOCARPUs obovatus                                 200mm               1/16m2                1
                                                  FICUS macrophylla                           200mm            1/20m2           -             -           2            1         2                                    FICUS macrophylla                                    200mm               1/16m2                -
                                                  FICUS obliqua                               200mm            1/20m2           -             -           2            1         1                                    FICUS obliqua                                        200mm               1/16m2                -
                                                  FLINDERSIA australis                        200mm            1/20m2           -             -           2            1         2                                    FLINDERSIA australis                                 200mm               1/16m2                -
                                                  GLOCHIDION ferdinandi                       200mm            1/20m2           -             -           2            1         1                                    GLOCHIDION ferdinandi                                200mm               1/16m2                -
                                                  MACARANGA tanarius                          200mm            1/20m2           -             1           2            1         2                                    MACARANGA tanarius                                   200mm               1/16m2                -
                                                  SYZIGIUM australe                           200mm            1/20m2           -             1           2            -         2                                    SYZIGIUM australe                                    200mm               1/16m2                -
                                                  TRISTANIOPSIS laurina                       200mm            1/20m2           -             1           2            -         2                                    TRISTANIOPSIS laurina                                200mm               1/16m2                -
                                                  WATERHOUSIA floribunda                      200mm            1/20m2           -             1           2            -         1                                    WATERHOUSIA floribunda                               200mm               1/16m2                -
                                                  TOTAL                                                                         5             7           26           6         21                                   TOTAL                                                                                          5


                                                  NOTES: All plant quantities are shown for reference only, contractor to verify all quantities                                                                       LARGE SHRUBS @ 40%
                                                                                                                                                                                                                                                                                                       2
                                                  if a discrepancy exists between plans and schedules, plans to take presedence. Plant                                                                                ACMENA hemilampra                                   Tubestock                1/m               5
                                                                                                                                                                                                                                                                                                       2
                                                  shrubs from 140mm pots and Macrophytes & Groundcovers from Tubestock in drifts of                                                                                   ATRACTOCARPAS chartacea                             Tubestock                1/m               5
                                                  7-13.                                                                                                                                                                                                                                                2
                                                                                                                                                                                                                      CRYPTOCARYA laevigata                               Tubestock                1/m               5
                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                      CYATHEA Cooperi                                     Tubestock                1/m               5
                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                      HIBISCUS heterophyllus                              Tubestock                1/m               5
                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                      HIBISCUS splendens                                  Tubestock                1/m               5
                                                                                                                                                                                                                                                                                                       2
                                               PLANT SCHEDULE 2                                                                                                                                                       PITTOSPORUM revolutum                               Tubestock                1/m               5
                                                                                                                                                                                                                                                                                                       2
                                               Disturbed Channel Vegetation                                                                                                                                           SYZIGIUM luehmannii                                 Tubestock                1/m               5
                                                                                                                                                                                                                      TOTAL                                                                                         40
                                                BOTANICAL NAME                             POT SIZE        SUGGESTED Zone 2A           Zone 2B     Zone 2C
                                                                                                           SPACING    (47m²)            (11m²)      (20m²)
                                                                                                                                                                                                                      SMALL SHRUBS, VINES & GROUNDCOVERS @ 60%
                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                      ALPINIA caerulea              Tubestock                                      4/m              20
                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                      AUSTROMYRTUS dulcis           Tubestock                                      4/m              20
                                                LARGE SHRUBS @ 30%                                                                                                                                                                                                                                     2
                                                                                                                                                                                                                      BAECKEA virgata               Tubestock                                      4/m              20
                                                BANKSIA robor                              Tubestock            1m 2           14         3           6                                                                                                                                                2
                                                                                                                                                                                                                      CISSUS antarctica             Tubestock                                      4/m              20
                                                TOTAL                                                                          14         3           6                                                                                                                                                2
                                                                                                                                                                                                                      CORDYLINE rubra               Tubestock                                      2/m              10
                                                                                                                                                                                                                                                                                                       2
                                                                                                                                                                                                                      DIANELLA caerulea             Tubestock                                      4/m              20
                                                SMALL SHRUBS, VINES & GROUNDCOVERS @70%                                                                                                                                                                                                                2
                                                BLECHNUM spp.                 Tubestock                         4/m
                                                                                                                    2
                                                                                                                               22         5         10                                                                LOMANDRA histrix              Tubestock                                      1/m               5
                                                                                                                                                                                                                                                                                                       2
                                                BAUMEA juncea *               Tubestock                         4/m
                                                                                                                    2
                                                                                                                               22         5         10                                                                PANDOREA jasminoides          Tubestock                                      4/m              20
                                                                                                                                                                                                                                                                                                       2
                                                FICINIA nodosa*               Tubestock                         4/m
                                                                                                                    2
                                                                                                                               22         5         10                                                                PANDOREA pandorana            Tubestock                                      4/m              20
                                                                                                                                                                                                                                                                                                       2
                                                GAHNIA aspera                 Tubestock                         4/m
                                                                                                                    2
                                                                                                                               22         5         10                                                                PILIDIOSTIGMA glabrum         Tubestock                                      4/m              20
                                                                                                                                                                                                                                                                                                       2
                                                HOVEA acutifolia              Tubestock                         4/m
                                                                                                                    2
                                                                                                                               22         5         10                                                                TABERNAEMONTANA pandacaqui    Tubestock                                      4/m              20
                                                LOMANDRA longifolia           Tubestock                         1/m
                                                                                                                    2
                                                                                                                               5          2         2                                                                 TOTAL                                                                                         195

                                                TOTAL                                                                          115        27        52


                                                                                                                                                                                                      FINISHES SCHEDULE
                                                                                                                                                                                                       CODE ITEM                                        PRODUCT / DESCRIPTION                                   SIZE / PATTERN                            FINISH                                                 COLOUR
                                               PLANT SCHEDULE 3                                                                                                                                                                                                                                                                                           Smoot uniform         eed free
                                                                                                                                                                                                                                                        E isting site topsoil refer to                          Top Soil Soil preparation As
                                               Existing Channel & Vegetation To Remain With                                                                                                                       Top soil                                                                                      per Specification per plan                topsoil mulc surfaces it no                            As supplied
                                                                                                                                                                                                                                                        specification
                                                                                                                                                                                                                                                                                                                                                          deleterious materials
                                               Supplementary Canopy Trees                                                                                                                                                                                                                                       nominated areas

                                                 BOTANICAL NAME                            POT SIZE        SUGGESTED          Area
                                                                                                                                                                                                                                                                                                                                                            niform finis 100mm deep free of deleterious
                                                                                                                             (821m²)                                                                     FB       Organic     ulc                       Street Tree garden pt and gardens                       25mm                 composted            materials Install pinned coir mes over bio retention   As supplied
                                                                                                           SPACING
                                                                                                                                                                                                                                                         Forest itter                                                                                     basic mulc areas project entry batter and
                                                                                                                                                                                                                                                                                                                                                          storm ater overland flo pat lo flo s ales
                                                                                                                                                                                                                                                                                                                                                           niform finis free of deleterious materials eed
                                                TREES                                                                                                                                                   SC        Organic     ulc                       Bio Retention Basin           edia Area s               As supplied                               seed i e Nut sedge 100mm deep Install pinned coir As supplied
                                                ARAUCARIA cunninghamii                       200mm            1/20m2           10                                                                                                                       Sugar Cane ulc
                                                                                                                                                                                                                                                                                                                                                          mes over mulc
                                                ARCHONTOPHOENIX cunninghamiana               200mm            1/20m2           10                                                                                                                       Cynodon dactylon                                        Top Soil as per general notes                                                                    Brig t green
                                                LIVISTONA australis                          200mm            1/20m2           10                                                                                 Turf                                  Couc Bermudagrass                                                                                 Smoot flo ing even      positively
                                                                                                                                                                                                                                                                                                                150mm deep
                                                LIVISTONA dicipiens                          200mm            1/20m2           10                                                                                                                       A rade free of pests and eeds                                                                     draining grades
                                                                                                                                                                                                                                                                                                                Turf Rolls Sod
                                                TOTAL                                                                          40
                                                                                                                                                                                                                  Coir   ES                             Coir       es     Coir Net                              400gsm                                    Coir ES pinned do n over ulc as                        As supplied
                                                                                                                                                                                                                                                                                                                                                          per manufactures specification
                                                 NOTES: All plant quantities are shown for reference only, contractor to verify all quantities
                                                 if a discrepancy exists between plans and schedules, plans to take presedence. Plant
                                                 shrubs from 140mm pots and Macrophytes & Groundcovers from Tubestock in drifts of                                                                                Timber Edge                           As Per etail                                            As Per etail                              As Per etail                                           As Per etail
                                                 7-13.




Client                                                                                  Project                                                                                                                                                                                                    NORT                                          TITLE:                  JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                                                                  anembo consultants
                                                                                                                                                                                                                                                                                                                                                                         FILE:   220623
Alba Projects Pty Ltd                                                                   11c Church St, Pomona                                                                                                                                                                                                                                                            DWG. No. LD3
                                                                                                                                                                                                                                                                                                                                                                                                                  Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                  Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                      Project Management


This document is the copyright of anembo consultants & shall                            Rehabilitation Plan                                                                                                                                       B     23.06.22        AMENDMENTS      CK    TH                                                                         SHEET 3 OF 7                             anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                  Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                    A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                                Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                                  A     17.06.22 COUNCIL SUBMISSION     CK    TH                                                 FINISHES &                NTS                                    Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                               email: [email protected]                www.anembo.com
                                                                                                                                                               ISSUE   DATE     DESCRIPTION   DRWN CKD ISSUE   DATE      DESCRIPTION   DRWN CKD ISSUE    DATE           DESCRIPTION    DRWN CKD     APPROVED:   T Hindley ALIA 713               PLANTING SCHEDULES        NTS

Page 4

                                                                                                                                                                           3x Tube dia.




                                                                                                                                                                                                                                            TUBESTOCK PLANT, REFER TO PLANT
                                                                                                                                                                                                                                            SCHEDULE FOR SPECIES

                                                                                                                                                                                                                                            FORM SHALLOW SAUCER SHAPED
                                                                                                                                                                                                                                            DEPRESSION AROUND PLANT BASE
                                                                                                                                                                                                                                                                                                             PLANT PIT 2X WIDTH OF                         2x POT Ø                    SHRUB / GROUNDCOVER / TUFTY
                                                                                                                                                                                                                                            100mm DEEP ORGANIC MULCH PER AS                                  RESEPCTIVE POT. SCARIFY ALL                                               GRASS PLANT SPECIES PER PLAN
                                                                                                                                                                                                                                            SPECIFIED. KEEP MINIMUM 50mm                                     PIT WALLS & BOTTOM, TYP.                       POT Ø
                                                                                                                                                                                                                                            CLEAR OF PLANT STEM. DO NOT
                                                                                                                                                                                                                                            MULCH BIO-AREA MEDIA SAND.                                       BACKFILL PLANT PIT WITH                                                   100mm ORGANIC MULCH AS
                                                                                                                                                                                                                                                                                                             TOPSOIL AS PER SPECIFICATIONS,                                            NOMINATED, KEEP MINIMUM 50mm
                                                                                                                                                                                                                                                                                                             AVOID COMPACTION, TYP.                                                    FROM PLANT STEM. FORM SHALLOW
                                                                                                                                                                                                                                            CULTIVATED SUBGRADE TO 150mm                                                                                                               DISH DRAIN TO BASE OF PLANT, TYP.
                                                                                                                                                                                                                                                                                                             GARDEN BED TOPSOIL
                                                                                                                                                                                                                                                                                                             PER SPECIFICATIONS, AVOID                                                 'AGRIFORM' SLOW RELEASE
                                                                                                                                                                                                                                                                                                             COMPACTION, TYP.                                                          FERTILISER. TYPE, SIZE & FORMULA
                                                                                                                                                                                                                                            TOPSOIL AS SPECIFIED
         STREET TREE PLANTING DETAIL PLAN                                                                                                                                                                                                                                                                    100mm, TYP.
                                                                                                                                                                                                                                                                                                                                                                                       PER SPECIFICATIONS. USE FOR
                                                                                                                                                                                                                                                                                                                                                                                       PHOSPHORUS FREE TABLETS FOR
                                                                                                                                                                                                                                                                                                                                                                                       BANKSIA, CALLISTEMON OR
         NOTES:
                                                                                                                                                                                                                                            5 gram 'AGRIFORM' TABLET - USE                                                                                                             GREVILLEA SPECIES, TYP.
         EXTENT OF PIT EXCAVATION TO BE 1800mm x 1800mm IN AREA, MINIMUM
                                                                                                                                                                                                                                            PHOSPHORUS FREE TABLETS FOR                                      2x ROOTBALL
         (SUBJECT TO FOOTPATH LOCATION). REMOVE ALL EXCAVATED FILL OFF-SITE.
                                                                                                                                                                                                                                            CALLISTEMONS & GREVILLEAS                                        DEPTH, TYP.
                                                                                                                                                   SPADE CUT EDGE
                                                                                                                                                                                                                                            SUBGRADE                                                         150mm, TYP.                                                               150mm DEEP CULTIVATED
         HARDWOOD
                                                                                                                                                                                                                                                                                                                                                                                       SUBGRADE AS PER
         STAKES (2),                                                                                                                                                                                                                                                                                         EXISTING SUBGRADE, TYP.                                                   SPECIFICATIONS, TYP.
         SEE SECTION

         STREET TREE,
         REFER DETAIL
         BELOW.                                                                                                                                                                                                                                                                                                 4          POTTED SHRUB, GROUNDCOVER OR TUFTY GRASS PLANTING
                                                                                                                                                                    3          TUBESTOCK PLANTING
         ROOTBALL                                                                                                                                                                                                                                                                                              LD4         Typical Section Detail                                                                      N.T.S.
                                                                                                                                                                LP4            Typical Section                                                                           N.T.S.
                                            KERB INVERT




                                                                                                 1800mm
                                     ROAD




         TOPSOIL WITH
         MULCH ABOVE
                                                                                                                                                                                                                                                                                                                                                                                 EDGE, REFER TO DETAIL                                                          WASHED GRAVEL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                AS SPECIFIED

                                                                                                                                                                                                                                                                                                                                                                                  TURF AS SPECIFIED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                150
                                                                                                                                                                                                                                                                                                                                                                                 TOPSOIL AS
                                                                                                          'FIGURE 8' HESSIAN TREE TIE, TYPICAL.                                                                                                                                                                                                                                  SPECIFIED, FINISH 25mm
                                                               1000mm             1000mm                                                                                                                                                                                                                                                                                         BELOW TOP OF EDGE TO
                                                                                                                                                                                                                                                                                                                                                                                 ALLOW FOR TURF
                                                          CENTRE TREE, 900mm FROM BACK OF KERB, OR
                                                                                                                                                                                                                                                                                                                                                                                 SUBGRADE
                                                          BETWEEN KERB & FOOTPATH AS APPLICABLE



                                                                                                                                                                                                                                                                                                                                                                                       7             GRAVEL PLACEMENT                                                       N.T.S.
                                                                                                                                                                                                                                                                                                                                                                                    LD4              Typical Section


                                                                                                                                                                                                                                                                                                                                                                                 TIMBER SPECIFICATION:
                                                                                                                                                                                                                                                                                                                                                                                 UNSEASONED HARDWOOD, CLASS 1 SELECT GRADE F17, ACQ OR TANALITH E MIN. H4
                                                                                                                                                                                                                                                                                          NOTES:                                                                                 TREATMENT, WITH ONE COAT OF TIMBER COATING.
                                                                                                                                                                                                                                                                                          ENSURE CROWN OF ROOTBALL LEVEL IS
                                                                                                                                                                                                                                                                                          SET HIGHER THAN ADJACENT FINISHED                                                                                GALVANISED TIMBER
                                                                                                                                                                                                                                                                                          GROUND LEVELS TO PREVENT EXCESSIVE                                                                               FIXING SCREWS, TYP.
                                                                                                                                                                                                                                                                                          PONDING AROUND ROOTBALL.
                                                                                                          FULL & EVEN CROWN, TYP.

                                                                                                                                                                                                                                                                                          FULL & EVEN CROWN, TYP.

                                                                                                          50mm WIDE HESSIAN TREE TIES WRAPPED
                                                                                                          LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
                                                                                                          SECURED TO STAKE.                                                                                                                                                               50mm WIDE HESSIAN TREE TIES WRAPPED                                                    ELEVATION
                                                                                                                                                                                                                                                                                          LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
                                                                                                                                                                                                                                                                                          SECURED TO STAKE WITH GALVANISED NAILS
                                                                                                                                                                                                                                                                                          OR STAPLES. POSITION TREE TIE BETWEEN
                                                                                                          2 - 50mm x 50mm x 2400mm F14 HARDWOOD                                                                                                                                           1/3 TO 1/2 OVERALL HEIGHT OF TREE.                                                                               1200mm, MAXIMUM
                                                                                                          CENTRALLY POINTED NON-TREATED STAKES
                                                                                                          (SHOWN PERPENDICULAR TO KERB FOR                                                                                                                                                2 - 50 x 50 x 2400mm F14 HARDWOOD                                                      PLAN
                                                                                                          GRAPHIC CLARITY ONLY). STAKES TO BE                                                                                                                                             CENTRALLY POINTED NON-TREATED STAKES.
                                                                                                          DRIVEN VERTICALLY INTO GROUND OUTSIDE                                                                                                                                           STAKES TO BE DRIVEN VERTICALLY INTO
                                                                                                          OF THE ROOTBALL.                                                                                                                                                                GROUND OUTSIDE OF THE ROOTBALL &                                                       100 x 50 mm TIMBER EDGING                                      50 x 25 x 450mm HARDWOOD PEG
                                                                                                                                                                                                                                                                                          SHALL HAVE A FINISHED HEIGHT LOWER                                                                                                                    @1200mm CENTRES
                                                                                                                                                                                                                                                                                          THAN THE TREES LOWER LATERAL LIMBS.                                                                                                        20mm
                                                                                                                                                                                                                                                                                                                                                                                 TURF AS SPECIFIED
                                                                                                          FORM SHALLOW SAUCER SHAPED                                                                                                                                                      FORM SHALLOW SAUCER SHAPED                                                                                                                                      MULCH AS SPECIFIED
                                                           1000mm
                                                                                                          DEPRESSION AROUND BASE OF PLANT. KEEP                                                                                                                                           DEPRESSION AROUND BASE OF PLANT.                                                       2x HOT DIPPED
                                                             min.            1000mm                       MULCH NOM. 50mm FROM TRUNK BASE.                                                                                                                                                KEEP MULCH NOM. 50mm FROM TRUNK                                                        GALVANISED TRIPLE GRIP
                                                                                                          CROWN OF TREE 50mm ABOVE KERB HEIGHT                                                                     900mm               900mm                                              BASE.                                                                                  SCREW TO FIX MITRED
                                                                                                                                                                                                                                                                                                                                                                                 TIMBER EDGING
                                                                                                          100mm DEEP ORGANIC MULCH AS
                                                                                                                                                                                                                                                                                          100mm DEEP ORGANIC MULCH AS                                                            TOGETHER, TYPICAL.                        SECTION
                                                                                                          NOMINATED.
                                                                                                                                                                                                                                                                                          NOMINATED. MOUND MULCH AT EDGE OF
                                                                                                                                                                                                               2 x POT Ø                                                                  PLANT PIT TO COLLECT WATER TO FALL
                                                                                                          TURF AS SPECIFIED.
                                                                                                                                                                                                                                                                                          DOWN EDGES OF PLANT PIT. DO NOT MULCH
                                                                                                                                                                                                               POT Ø                                                                      WITHIN 50mm OF PLANT STEM.
                                                                                                                                                                                                                                                                                                                                                                                    8               HARDWOOD TREATED GARDEN EDGE                                      N.T.S.
                                                                                                                                                                                                                                                                                                                                                                                   LD4              Typical Detail
                                                                                                                                                                                                                                                                                          TURF OR GARDEN, REFER TO PLAN.
                                                                                                          SPADE EDGE

                                                                                                          COMPACTED SOIL UNDER TREE
                                                                                                                                                                                                                                                                                          SPADE EDGE, REFER TO DETAIL.
         600mm




                                                                                                                                                                                                                                                                                          TOPSOIL PROFILE AS PER GENERAL NOTES
                                                                                                          TREE PIT TO BE EXCAVATED TO NOMINAL                                                                                                                                             PROJECT SPECIFICATIONS.
                     DEPTH VARIES




                                                                                                          DEPTH OF 600mm. BACKFILL HOLE WITH
                                                                                                          TOPSOIL PER SPECIFICATIONS FIRMING                                                                                                                                              TREE PIT TO BE EXCAVATED TO NOMINAL                                                   SPADE CUT EDGE TO TURF & GARDEN                                                TOP SOIL PER
                                                                                                                                                                                200mm 150mm 300mm




                                                                                                          PROGRESSIVELY. EXCESS EXCAVATED SOIL                                                                                                                                            DEPTH OF 600mm. BACKFILL HOLE WITH                                                    INTERFACES WHERE NO HARD EDGE IS                                               SPECIFICATIONS
                                                                                                          TO BE REMOVED OFF SITE.                                                                                                                                                         100% TOPSOIL PER SPECIFICATIONS FIRMING                                               SPECIFIED, 150mm DEEP.
                                                                                                                                                                                                                                                                                          PROGRESSIVELY. EXCESS EXCAVATED SOIL                                                                                                                                 TURF AS SPECIFIED.
                                                                                                                                                                                                                                                                                          TO BE REMOVED OFF SITE.                                                               100mm THICK ORGANIC MULCH
                                                                                                                                                                                                                                                                                          SCARIFY PIT WALLS & CULTIVATE PIT                                                     AS SPECIFIED.
                                                                                                                                                                                                                                                                                          BOTTOM 150mm, TYP.                                                                                         150mm
                                                                                                          150mm CULTIVATED SUBGRADE & PIT WALLS.                                                                                                                                          SLOW RELEASE FERTILIZER AS PER                                                                                                                                       SUBGRADE, FORM TO SUIT
                                                                                                          SLOW RELEASE FERTILIZER AS PER                                                                                                                                                  MANUFACTURER & SPECIFICATIONS.                                                                                                                                       FINISH LEVEL & CONTOURS.
                                                                                                          MANUFACTURER & SPECIFICATIONS.
                                                                                                                                                                                                                                                                                       COMPACTED SOIL UNDER TREE

                                                                                                                                                                                                                                                                                                                                                                                   9               SPADE CUT EDGE AT TURF / TREE GARDEN INTERFACES
                 1                  STREET TREE PLANTING - SPADE EDGES                                                                    N.T.S.                                                    2         TREE PLANTING - in GARDEN or TURF                                                                                  N.T.S.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      NTS
                                                                                                                                                                                                                                                                                                                                                                                  LP4              Typical Section
             LP4                    Typical Section Detail                                                                                                                                          LD4       Typical Section



Client                                                                                        Project                                                                                                                                                                                                                     NORT                                TITLE:                       JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                                                                                            anembo consultants
                                                                                                                                                                                                                                                                                                                                                                                           FILE:      220623
Alba Projects Pty Ltd                                                                         11c Church St, Pomona                                                                                                                                                                                                                                                                        DWG. No. LD4
                                                                                                                                                                                                                                                                                                                                                                                                                                            Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                                            Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Project Management


This document is the copyright of anembo consultants & shall                                  Rehabilitation Plan                                                                                                                                                        B     23.06.22      AMENDMENTS       CK     TH                                                                    SHEET 4 OF 7                                     anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                                            Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                                                         A     17.06.22 COUNCIL SUBMISSION    CK     TH                                                                      NTS                                            Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                                                         email: [email protected]                www.anembo.com
                                                                                                                                                                ISSUE   DATE                         DESCRIPTION    DRWN CKD ISSUE   DATE       DESCRIPTION   DRWN CKD ISSUE    DATE          DESCRIPTION    DRWN CKD     APPROVED:   T Hindley ALIA 713      TYPICAL DETAILS                NTS

Page 5

LEGEND                                                                                                                                                                                                                                                                                                                                             UNIT 9                                                                      UNIT 3
     Power
                                                                                                                                                                               Surveyed C annel Alignment




                                                                                                                                                                                                                                                                                                                       F1
                      TURF.                                                                                                                                                                                                                                      one 1d Refer To
                      Refer to Plans, General Notes, & Finishes Schedule                                                                                one 1c Refer To                                                                                          Plant Sc edule 1
                                                                                                                                                        Plant Sc edule1
                 Telstra                                                                                                                                                                                                                                                                                                             BioBasin Refer To                                                                         UNIT 2




                                                                                                                                          dary
                      MULCHED MAINTENANCE ACCESS PATH.                                                                                                                                                                  one 2b Refer To
                      Occasional Boulders To Suit Conditions As Per                                                                                                                                                                                                                                                                   andscape Concept Plan
                                                                                                                                                                                                                        Plant Sc edule 2




                                                                                                                                      Boun




                                                                                                                                                                                                                                                                                                                       F1
                      Topo's Stormwater Recommendations
                                                                                                                                                                          isturbed C annel Vegetation To Be                                                                                                                          Fence On Retaining               all By Arc itect




                                                                                                                                    erty
                                                                                                                                                                 Re abilitated it Sedges        rasses Only
                      LOW PLANTING.                                                                                                                                                Refer to Plant Sc edule 2




                                                                                                                                   Prop
                      Refer to Landscape Concept Plan
                                                                                                                                                                                                                                                                                                                                     Retaining         all By Civil
                                                                                                                                                                               Surveyed C annel Alignment




                                                                                                                                                                                                                                                                                                                       F1
                      BIO BASIN.                                                               Additional non mapped                                     E isting C annel Vegetation To Remain it
                      Refer To Landscape Concept Plan                                          Riparian Buffer 353m2                                     Supplementary Canopy Trees Spaced To 0 0
                                                                                         Area To Be Protected As Ne                                       anning s n Roug ness Coefficient As Per NS                                                             one 1b Refer To




                                                                                                                                                                                                                                                                                                                       F1
                                                                                                        Riparian Buffer                                              apping Topo s ydraulic esign                                                                Plant Sc edule 1
                       ENERA AN SCAPE REVE ETATION                                                                                                                          Refer To Plant Sc edule 3
                      Refer To Plans eneral Notes Finis es Sc edule
                                                                                                                                                               E isting Native Trees To Be Retained And                                                                                                                                            UNIT 8
                                                                                                                                                                                                                                                                                                                                                                                                                               UNIT 1
                                                                                                                                                            E tent Of Canopy Refer: Pace Planning Site




                                                                                                                                                                                                                                                                                                                       F1
                       BANKS TO BE REHABILITATED                                                                                                           Ecological Assessment Plan 2022 0 01 Reva
                       Refer To Plans          eneral Notes    Finis es Sc edule

                                                                                                                                                                  eave   ap In Flo      one To Site Conditions
                                                                                                2
                       ROCK SCOURING
                                                                                             SP301620




                                                                                                                                                                                                                                                                                                                       F1
                       Refer to Plans, General Notes, & Finishes Schedule                                                                                 800 Silt Control Fence To Property Boundary                                                                                                                                                                                              rive ay


                       DISTURBED CHANNEL VEGETATION                                                                                                                    ulc ed aintenance Access Pat
                       Refer to Plans, General Notes, & Finishes Schedule                                                                                        Occasional Boulders To Suit Conditions As
                                                                                                                                                                              Per Topo s ydraulic esign

                       ADDITIONAL NON MAPPED RIPARIAN BUFFER
                       Area To Be Protected As New Riparian Buffer                                                                                                Ne     E isting Banks To Be Re abilitated                                                                                                                                       F1                  F1
                                                                                                                                                                   it Supplementary Canopy Trees To 0 0
                                                                                                                                                                     annins n Roug ness Coefficient As Per                                                                                                                                                                                    o Planting
                       CONCRETE BY CIVIL                                                                                                                          NS     apping Topo s ydraulic esign                                                                                                                                                                                        Refer To andscape Concept Plan
                       Refer to Plans, General Notes                                                                                                                               Refer To Plant Sc edule 1
                                                                                                                                                                                                                                                                                                                                                                                                                                             F1               F1
                                                                                                                                                                                                                                                                                                                                                                                             Bins Sign By
                       E ISTIN NATIVE TREES TO BE RETAINE                                                                                                                                                                                                                                                                                                                                    Arc itect
                       Refer to Pace Planning Site Ecology Report
                                                                                                                                                                                                                                                                                                          Property Boundary
                                                               Telstra




                                                                                                                      Nesting Bo     ocation TBC On Site
             WM




                                                                Power
             WM
             WM

             Water




                       SURVEYD TOP OF BANK
              Water




                                                                         Telstra




                       Refer to Plans & General Notes                                                                                                                                                                                                                                                                                                                                         o Planting
                                                  HHY




                                                                                                                                                                                                                                     one 2a Refer To                                                                                                                                         Refer To andscape Concept Plan
                       SURVEYD BOTTOM OF BANK                                                                    Surveyed Bottom Of Batter             it Civil esign Amendments                                                     Plant Sc edule 2
                       Refer to Plans & General Notes
                                                                                                                                                                                                   one 1a Refer To
                                                                                                                                                                                                   Plant Sc edule 1
                       RETAINING WALL BY CIVIL
                       Refer to Plans & General Notes


                       F1 F2 F3: FENCE B ARC ITECTS
                                                                                                                      Surveyed Top Of Batter           it Civil esign Amendments
         F                                                                                                                                                                                                                                                                                                                                                                                                                                 o Planting
                       Refer to Plans                                                                                                                                                   eneral andscape Revegetation Planting                                                                                                                                                                                           Refer To andscape Concept Plan
                                                                                                                                                                                               Areas Refer To Plant Sc edule 4
                       800 Silt Control Fence To Property Boundary
                       Refer to Plans    eneral Notes


                       STREET TREES
                       Refer to Plans, Notes, Finishes & Planting Schedule


                       PROPERT BO N AR
                       Refer to Plans                                                                                                                                                                                                                                                                                            Street Trees Alignment C anged                                         Entry                            erb By Civil
                                                                                                                                                                                                                                                                                                                                 To Allo Clear Sig t ines


                                                                                   Clean Sig t ines NTP Fig 9 4 5 5                               Street Trees At 8m Intervals                                                 Ne Concrete Pat By Civil                               CHURCH STREET
                                                                                                                                                 Refer To andscape Concept
                                                                                                                                                      Plan For Plant Sc edule




      2                                                                                   1                                                                                                                                                206                                                                                                                                                                                                            205
    RP4344                                                                              RP4344                                                                                                                                            P5011                                                                                                                                                                                                          P5011




Client                                                                             Project                                                                                                                                                                                                  NORT                                         TITLE:                              JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                                                                    anembo consultants
                                                                                                                                                                                                                                                                                                                                                                             FILE:   220623
Alba Projects Pty Ltd                                                              11c Church St, Pomona                                                                                                                                                                                                                                                                     DWG. No. LP1
                                                                                                                                                                                                                                                                                                                                                                                                                    Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                    Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                        Project Management


This document is the copyright of anembo consultants & shall                       Rehabilitation Plan                                                                                                                                      B     23.06.22   AMENDMENTS          CK    TH          0     1       2       3   4   5                                          SHEET 1 OF 7                            anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                    Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                      A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                                  Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                            A     17.06.22 COUNCIL SUBMISSION    CK    TH          SCALE 1:200 @ A3                      REHABILITATION                        SCA E 1:100   A1                     Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                                 email: [email protected]                www.anembo.com
                                                                                                                                                         ISSUE    DATE    DESCRIPTION    DRWN CKD ISSUE   DATE   DESCRIPTION     DRWN CKD ISSUE    DATE      DESCRIPTION        DRWN CKD    APPROVED:   T Hindley ALIA 713               LANDSCAPE PLAN                        SCA E 1:200   A3

Page 6

                                                                                                                         gs n
                                                                                                                   annin




                                                                                                                                                                                                                                             F1




                                                                                                                                                                                                                                                                                                                    F3
                                                                                                                             g
                                                                                                           T o 0 1 il appin
                                                                                                   Ca n Be Counc                                                                                                                                                        Carparks
                                                                                                 g         To
                                                                                           pacin      efer
                                                                                      ab S ficient R
                                                                                  Re      o ef
                                                                                     ss C
                                                                                g ne                                                                                                                     one 1e Refer To




                                                                                                                                                                                                                                                                                                                    F3
                                                                          Rou                                                                                                                            Plant Sc edule 1
                                2




                                                                                                                                                                                                                                                             F1
                             SP301620
                                                                                                                                                                                                                                                                                           Retaining            all By Civil
                                                                                                                                                                                                                                                                                                                                                                                                    UNIT 12




                                                                                                                                                                                                                                                                                                                    F3
                                                                                                                                                                                                                                                                       F1


                                                                                                                                                                                                                                                                                 F1
        Additional non mapped Riparian Buffer 10 5m2
          Area To Be Protected As Ne Riparian Buffer                                                                                                                                                                                                                                                  F3
                                                                                                                                                                                                                                                                        Nesting Bo             ocation TBC On Site
                                                                                                     Pr
                                                                                                       op




                                                                                                                                                                                                                                                                                               F1
                                                                                                            er
LEGEND                                                                                                        ty
                                                                                                                   Bo
                                                                                                                     un
                                                                                                                        da
                          TURF.                                                                                            ry




                                                                                                                                                                                                                                                                                                           F1
                          Refer to Plans, General Notes, & Finishes Schedule                                                                                                                                                                                                                                                                                                                        UNIT 11

                          MULCHED MAINTENANCE ACCESS PATH.
                                                                                                                                                                                                                                                                                                                              F3
                          Occasional Boulders To Suit Conditions As Per




                                                                                                                                                                                                                                                                                                                         F1
                          Topo's Stormwater Recommendations

                                                                                                                                                                                                                                                                                                                                                                                                    UNIT 10
                          LOW PLANTING.                                                                                                                                                    one 1c Refer To
                          Refer to Landscape Concept Plan                                                                                                                                  Plant Sc edule 1
                                                                                                                                                                                                                                                                                                Nesting Bo               ocation TBC On Site




                                                                                                                                                                                                                                                                                                                                       F1
                          BIO BASIN.                                                                                             800 Silt Control Fence To Property Boundary
                          Refer To Landscape Concept Plan

                                                                                                                                     E isting Native Trees To Be Retained And




                                                                                                                                                                                                                                                                                                                                        F1
                           ENERA AN SCAPE REVE ETATION                                                                            E tent Of Canopy Refer: Pace Planning Site
                          Refer To Plans eneral Notes Finis es Sc edule                                                         Ecological Assessment Plan 2022 0 01 Rev A
                                                                                                                                                                                                                                                                                                                                                 F1            F1         F1


                           BANKS TO BE REHABILITATED                                                                                                                                                                                                                                                                                                                                        o Planting
                                      Tel




                           Refer To Plans      eneral Notes              Finis es Sc edule                                                                                                                                                                                                                                                                                                 Refer To andscape Concept Plan
                                                                                                                                            isturbed C annel Vegetation To Be                                                                                                                          one 2c Refer To
                                                                                                                                                                                                                                                                                                       Plant Sc edule 2
                                  Power




                                                                                                                                   Re abilitated it Sedges        rasses Only
                           ROCK SCOURING                                                                                                             Refer to Plant Sc edule 2
                           Refer to Plans, General Notes, & Finishes Schedule
                                      Water




                                                                                                                                                 Surveyed C annel Alignment

                           DISTURBED CHANNEL VEGETATION
                                                                                                                                                                                                                                                                                                                                                                         F1
                           Refer to Plans, General Notes, & Finishes Schedule
                                                                                                        E isting C annel Vegetation To Remain it Supplimentary
                                                                                                               Canopy Trees Spaced To 0 0   anning s n Roug ness
                           ADDITIONAL NON MAPPED RIPARIAN BUFFER                                         Coefficient As Per NS   apping Topo s ydraulic esign
                           Area To Be Protected As New Riparian Buffer                                                                   Refer To Plant Sc edule 3




                                                                                                                                                                                                                                                                                                                                                                    F1
                                                                                                                                                                                                                                                                                                                                                                                                    UNIT 9
                                                                                                                                                                                                                                                                                                           one 1d Refer To
                                                                                                                                                                                                                                                                                                           Plant Sc edule 1
                           CONCRETE BY CIVIL
                           Refer to Plans, General Notes                                                                   Ne     E isting Banks To Be Re abilitated it
                 225PVC




                                                                                                             Supplementary Canopy Trees To 0 0       annins n Roug ness




                                                                                                                                                                                                                                                                                                                                                                    F1
                                                                                                              Coefficient As Per NS     apping Topo s ydraulic esign
                           E ISTIN NATIVE TREES TO BE RETAINE                                                                                   Refer to Plant Sc edule 1
                           Refer to Pace Planning Site Ecology Report
                                                                                                                                                                                                                                                                                                                                                                         BioBasin Refer To




                                                                                                                                                                                                                                                                                                                                                                    F1
                           SURVEYD TOP OF BANK                                                                                                                                                                                                                                                                                                                            andscape Concept Plan
       Telstra




                           Refer to Plans & General Notes                                                                                 ulc ed aintenance Access Pat
                   Power




                                                                                                                                    Occasional Boulders To Suit Conditions As                                                                                                                                                                                            Fence On Retaining           all By Arc itect
                                                                                                                                                 Per Topo s ydraulic esign
                           SURVEYD BOTTOM OF BANK
                           Refer to Plans & General Notes




                                                                                                                                                                                                                                                                                                                                                                    F1
                                                                                                                                                                                                                                                                                                                                                                         Retaining     all By Civil
                                                                                                                                                                                                                                                                                                                                                                                                                                    rive ay
                           RETAINING WALL BY CIVIL                                                                 Surveyed Bottom Of Batter     it Civil esign Amendments
                           Refer to Plans & General Notes




                                                                                                                                                                                                                                                                                                                                                                    F1
                           F1 F2 F3: FENCE B ARC ITECTS
         F
                           Refer to Plans
                                               Power




                           800 Silt Control Fence To Property Boundary




                                                                                                                                                                                                                                                                                                                                                                    F1
                           Refer to Plans    eneral Notes
                                                                                                                                Additional non mapped Riparian Buffer 353m2
                                                               Telstra




                                                                                                                                  Area To Be Protected As Ne Riparian Buffer
                           STREET TREES
                           Refer to Plans, Notes, Finishes & Planting Schedule




                                                                                                                                                                                                                                                                                                                                                                    F1
                                                                                                                                                                                                                                                                                                                one 2b Refer To                                                                     UNIT 8
                                                                                                                                                                                                                                                                                                                Plant Sc edule
                           PROPERT BO N AR
                           Refer to Plans




                                                                                                                                                                                                                                                                                                                                                                    F1
Client                                                                                           Project                                                                                                                                                                                              NORT                                            TITLE:                   JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                                                                         anembo consultants
                                                                                                                                                                                                                                                                                                                                                                               FILE:   220623
Alba Projects Pty Ltd                                                                            11c Church St, Pomona                                                                                                                                                                                                                                                         DWG. No. LP2
                                                                                                                                                                                                                                                                                                                                                                                                                         Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                         Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                             Project Management


This document is the copyright of anembo consultants & shall                                     Rehabilitation Plan                                                                                                                                 B     23.06.22   AMENDMENTS          CK     TH             0        1         2    3    4   5                             SHEET 2 OF 7                              anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                         Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                           A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                                       Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                                     A     17.06.22 COUNCIL SUBMISSION    CK     TH             SCALE 1:200 @ A3                      REHABILITATION             SCA E 1:100   A1                        Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                                      email: [email protected]                www.anembo.com
                                                                                                                                                                       ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE   DATE   DESCRIPTION   DRWN CKD ISSUE    DATE      DESCRIPTION        DRWN CKD     APPROVED:      T Hindley ALIA 713               LANDSCAPE PLAN             SCA E 1:200   A3

Page 7

                                                           LEGEND
                                                                      TURF.                                                                     ENERA AN SCAPE REVE ETATION                                                        CONCRETE BY CIVIL                                                                                    RETAINING WALL BY CIVIL                                               STREET TREES
                                                                      Refer to Plans, General Notes, & Finishes Schedule                       Refer To Plans eneral Notes Finis es Sc edule                                       Refer to Plans, General Notes                                                                        Refer to Plans & General Notes                                        Refer to Plans, Notes, Finishes & Planting Schedule


                                                                      MULCHED MAINTENANCE ACCESS PATH.
                                                                                                                                               BANKS TO BE REHABILITATED                                                           E ISTIN NATIVE TREES TO BE RETAINE                                                                   F1 F2 F3: FENCE B ARC ITECTS                                          PROPERT BO N AR
                                                                      Occasional Boulders To Suit Conditions As Per                                                                                                                                                                                                      F
                                                                      Topo's Stormwater Recommendations
                                                                                                                                               Refer To Plans    eneral Notes       Finis es Sc edule                              Refer to Pace Planning Site Ecology Report                                                           Refer to Plans                                                        Refer to Plans


                                                                      LOW PLANTING.                                                            ROCK SCOURING                                                                       SURVEYD TOP OF BANK                                                                                  ADDITIONAL NON MAPPED RIPARIAN BUFFER
                                                                      Refer to Landscape Concept Plan                                          Refer to Plans, General Notes, & Finishes Schedule                                  Refer to Plans & General Notes                                                                       Area To Be Protected As New Riparian Buffer


                                                                      BIO BASIN.                                                               DISTURBED CHANNEL VEGETATION                                                        SURVEYD BOTTOM OF BANK                                                                               800 Silt Control Fence To Property Boundary
                                                                      Refer To Landscape Concept Plan                                          Refer to Plans, General Notes, & Finishes Schedule                                  Refer to Plans & General Notes                                                                       Refer to Plans    eneral Notes




                Additional non mapped                                                                    eave ap In Flo                  800 Silt Control Fence
                 Riparian Buffer 0m2                                                                     one To Site Conditions          To Property Boundary
               Area To Be Protected As
                   Ne Riparian Buffer                                                                                                                                                                                                                                                                                        andscape Terrace Refer To andscape Concept Plan
                                                                                                                                                                                                          Property Boundary
                                                                                                                                                                                                                                            F2                 F2                 F2                   F2                      F2              F2               F2         F2                    F2    F2             F2               F2               F2

                                                                                                                                                                                                 Nesting Bo     ocation TBC On Site




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1
                                                                                  Surveyed Top Of Batter        it Civil esign Amendments




                                                                                                                                                                                                                                                                                                   F3




                                                                                                                                                                                                                                                                                                                                                          F3




                                                                                                                                                                                                                                                                                                                                                                                                  F3
                                                                            Surveyed Bottom Of Batter           it Civil esign Amendments                                                    one 1e Refer To
                                                                                                                                                                                             Plant Sc edule 1




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1
                                 3
                                                                                             one 1c Refer To
                              SP301620                                                       Plant Sc edule 1
                                                                          Pro
                                                                                pe
                                                                                   rty




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1
                                                                                       Bo
                                                                                          un
                                                                                            da
                                                                                              ry

                                                                                                                                                                                                                                                                          UNIT 13                                                         UNIT 14              UNIT 15                                               UNIT 16                      UNIT 17




                                                                                                                                                                                                                                                                                                                                                                                                                                        F3
                                                                                                                                                                                                                             F1
                                   E isting Native Trees To Be Retained And
                                E tent Of Canopy Refer: Pace Planning Site
                                                                                                                                                                                                                                      F1

                              Ecological Assessment Plan 2022 0 01 Rev A
                                                                                                                                                                                                                                                                      ulc ed aintenance Access Pat
                                                                                                                                                                                                                                                                     Occasional Boulders To Suit Conditions As




                                                                                                                                                                                                                                                 F1
                                                        Surveyed C annel Alignment                                                                                                                                                                                   Per Topo s ydraulic esign

                                                                                                                                                                                                                                                                                                                                                                                                                        rive ay
     E isting C annel Vegetation To Remain it Supplementary                                                                                                                                                                                                          Retaining         all By Civil
              Canopy Trees Spaced To 0 0    anning s Roug ness



                                                                                                                                                                                                                                                 F1
       Coefficient As Per NS  apping Topo s ydraulic esign
                                                                                                                            Prop




                                                                                                                                                                                                                                                                     Fence On Retaining                all By Civil
                                      Refer To Plant Sc edule 3                                                                                     Nesting Bo       ocation TBC On Site
                                                                                                                             erty B




                                                                                                                                                                                                                                                               F1                 F1                   F1
                                                                                                                                                                                                                                                                                                                                                                                                  F3    F3             F3               F3

                                                                                                                                                                                                   gs n
                                                                                                                               ound




                                                                                                                                                                                          1  annin ping
                                                                                                                                                                                        0          p
                                                                                                                                                                                     To       il a
                                                                                                                                                                                n Be     ounc
                                                                                                                                   ary




                                                                                                                                                                          ing Ca fer To C




                                                                                                                                                                                                                                                                                                                          F1
                                                                                                                                                                      a c




                                                                                                                                                                                                                                                                                                                                                                                   F3
                                                                                                                                                                    p           e
                                     Ne     E isting Banks To Be Re abilitated                                                                                 ab S ficient R                                                                                                                                                                       Carparks
                                                                                                                                                           Re         f
                                      it Supplementary Canopy Trees To 0 0                                                                                    s s Coe
                                                                                                                                                       g   ne
                                        annins n Roug ness Coefficient As Per                                                                      Rou
                                      NS     apping Topo s ydraulic esign




                                                                                                                                                                                                                                                                                                                                                                                   F3
                                                                                                                                                                                                                                                                                                                                                                                                            UNIT 12
                                                                                                      2                                                                                                                                                                                                                                              Communal Space




                                                                                                                                                                                                                                                                                                                                          F1
                                                                                                   SP301620                                                                                                                                                                                                                                         Refer To andscape
                                                                                                                                                                                                                                                                                                                                                       Concept Plan




                                                                                                                                                                                                                                                                                                                                                                                   F3
Client                                                                                  Project                                                                                                                                                                                                                                                                                                                    anembo consultants




                                                                                                                                                                                                                                                                                                                                                    F1
                                                                                                                                                                                                                                                                                            NORT                                                 TITLE:                    JOB No.: S22061152a
                                                                                                                                                                                                                                                                                                                                                                           FILE:        220623
Alba Projects Pty Ltd                                                                   11c Church St, Pomona                                                                                                                                                                                                                                                              DWG. No. LP3
                                                                                                                                                                                                                                                                                                                                                                                                                   Landscape Architects
                                                                                                                                                                                                                                                                                                                                                                                                                   Environmental
                                                                                                                                                                                                                                                                                                                                                                                                                                                       Project Management


This document is the copyright of anembo consultants & shall                            Rehabilitation Plan                                                                                                                                  B     23.06.22   AMENDMENTS          CK   TH          0         1       2       3      4      5                               SHEET 3 OF 7                            anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                                                                                                   Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                                                                                                     A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                                                                                                 Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
                                                                                                                                                                                                                                             A     17.06.22 COUNCIL SUBMISSION    CK   TH          SCALE 1:200 @ A3                              REHABILITATION              SCA E 1:100     A1                    Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                                                                                                email: [email protected]                www.anembo.com
                                                                                                                                                      ISSUE   DATE    DESCRIPTION      DRWN CKD ISSUE   DATE   DESCRIPTION        DRWN CKD ISSUE    DATE      DESCRIPTION        DRWN CKD   APPROVED:       T Hindley ALIA 713                   LANDSCAPE PLAN              SCA E 1:200     A3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.