Original source · versioned page text
220623 Church Rehab 'B'
Attached to the e-mail EMAIL 3 OF 3 - MCU22/0031 and OPW22/0062 - INFORMATION REQUEST RESPONSE.
11c Church St, Pomona Re abilitation Plan For Operational orks evelopment Application NE 2022 F2 F2 F2 LP3 F3 F1 The following landscape operational works plan package consists of the following schedule of drawings; LD1 eneral Notes S eet ayout Site ocation LD2 Project Specifications LD3 Finis es Sc edule Planting Sc edule F3 LD4 Typical etails LP1-3 andscape Re abilitation Plan F1 This package has been developed to comply with; W 0020 C OP V 040322 Tel Pow ate r Noosa Plan 2020 er Sources; · Engineering Ba Engineering · Planners Pace Planning · LP2 Building esign All esign rafting Tel Power · Ecology Pace Planning Water · Bus fire EBA 225PVC Certifications; · Furnis A it follo ing certifications prior to on maintenance inspection; Telstra Power AS 2303:2015 F1 AS4419 Soil Certification C eed free Pest Free Power MH Soil ept certification it p otograp ic evidence Telstra Sample Approvals; F1 · Furnis A it follo ing samples for A approval prior to construction; oop Pine ulc Sugar Cane ulc 94 LP1 Telstra .3 WM WM Power WM Water NBN 0 Water Telstra H HHY HHY Mat CHURCH ST 11 CHURCH ST, POMONA SHEET KEY LAYOUT N.T.S SITE LOCATION N.T.S Client Project NORT TITLE: JOB No.: S22061152a anembo consultants FILE: 220623 Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LD1 Landscape Architects Environmental Project Management This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH GENERAL NOTES, SHEET 1 OF 7 anembo consultants pty.ltd. Sunshine Coast: PO Box 24 A.B.N. 75 089 473 156 Moffat Beach QLD 4551 not be copied without written approval, nor shall it be used A 17.06.22 COUNCIL SUBMISSION CK TH SHEET LAYOUT & SITE NTS Ph: 07 5437 0000 except for the development and the site specified. Scale can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LOCATION NTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 6 pages
Page 2
T ice eekly during prolonged rain
REHABILITATION WORKS SPECIFICATIONS · All stockpiles are to be protected it suitable erosion control devices graded to TREE PROTECTION MEASURES OPERATIONS - DISTURBED AREAS
This plan has been developed to comply with the Noosa Shire Council ensure control of runoff · T e follo ing tree protection measures must at all times be ad ered to during any · Identify eeds If unsure consult A All ot er vegetation to be protected and
Planning Scheme as applicable where practical · Coordinate installation of sediment erosion control devices it civil contractor to on site orks generally in accordance it AS49 0 2009 protection of trees on retained
ABBREVIATIONS ensure compatibility consistency in control measures development sites A ill advise ere measures are required at Pre start but is · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
AS Australian Standard ot dipped · All e posed surfaces once completed s all be immediately stabili ed to prevent generally to standard s of e isting trees t at are s o n as re abilitation areas · ecompact ground and cultivate to 5mm deep
EP Establis ment Period A andscape Arc itect erosion · Prior to commencement of orks t e contractor to organise a pre construction · rade ground surface to create smoot falls a ay from pat s ere necessary
N A Not applicable OC On centre meeting to identify trees for protection removal and or pruning · Remove all ant ropogenic rubbis
P aintenace Period m2 Square metres EDGING · Protective fencing is to be installed around t e tree protection one generally in · Obtain a report by a qualified person identifying at tree maintenance measures
m3 Cubic etres T P Typical Spade Edge accordance it AS49 0 2009 prior to site establis ment and remain intact and are required and utili e a qualified person to conduct t e orks
NATA National Association of Testing Aut orities S PER Superintendent · Install Spade Cut edge as located on plans as per detail monitored and certified by t e project arborist until completion of orks · op dead dying or dangerous limbs or trees as required to remove risk of injury to
uPVC nplasticised polyvinyl C loride Pipe NSC Noosa S ire Council · Refer to etail for protective fencing specifications users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
B ater by esign AO andscape Assessment Officer REHABILITATION AREAS · Any orks it in t e tree protection one to be supervised by t e project arborist ground surface it in regeneration ones at least 5 meters from pat s and ot er
Soil · Activities it in t e tree protection one are to be aut orised and supervised by t e infrastructure
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils project arborist No compaction from ve icles pedestrian movement stockpiling of · All felled vegetation is to be retained on site resultant mulc is to be used in
· Apart from declared eeds all e isting vegetation s all be retained as been andscape contractor to coordinate it civil contractor to ensure topsoil is top soil e cavation no dumping of aste or cutting it in t e root one s is to revegetation landscaping or soil stabilisation activities
identified it retention protection measures for suc are nominated erein re installed per t e follo ing specifications in respective landscape areas occur · Add 100mm ulc to all disturbed areas
· Identified areas are confined to areas of eed management t ose nominated on · Clear remove all non organic deleterious and large organic matter suc as rocks · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
t ese plans it associated orks described erein greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to project arborist to ensure t at t e correct arboreal tec niques are utilised OPERATIONS - UNDISTURBED AREAS
Plant sc edules derived from NSC To n Plan Table SC 3 4 3 Closed Forest be landscaped · Identify eeds If unsure consult A All ot er vegetation to be protected and
· E cavate and remove off site any remaining fill to turf and garden areas to ensure VEGETATION MANAGEMENT PROTECTION PROGRAM retained
Rainforest Areas Species and EBA Bus fire itigation Report Appendi E Plant
Species ist correct dept s for topsoils Issue Vegetation management - clearing & protection
· Treat all eeds and pasture grasses Refer to eed Removal Sc edule
· andscape contractor to conduct soils analyses tests to stockpiled topsoils and · Remove all ant ropogenic rubbis
ameliorate per recommendations prior to re spreading Furnis la it results · op dead dying or dangerous limbs or trees as required to remove risk of injury to
andscape contractor to allo for for p balancing nutrient ameliorations all soil Objective Identify areas of vegetation individual trees to be users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
protected retained it in t e development areas t ose
testing to be conducted by a lab accredited by NATA ground surface it in regeneration ones at least 5 meters from pat s and ot er
to be cleared
infrastructure
Ensure t at orkers understand t e requirements of
Cultivate · All felled vegetation is to be retained on site mulc is to be used in revegetation
PROJECT DESCRIPTION protection retention install protective devices to
· Cultivate ground in all disturbed areas to a dept ere possible to 5mm dept for ensure no accidental damage occurs landscaping or soil stabilisation activities
THIS WORK COMPRISES OF;
inspection before installation of soil re ab Ensure t at clearing met ods are appropriate for areas · Identify location for supplement planting for canopy integrity
· Avoiding any root systems being cleared especially in t e vicinity of areas to be
1) CONSTRUCTION WORKS: WEED REMOVAL SCHEDULE
a Retaining associated drainage protected
Mulch Ensure t at t e ork program is suc as to minimise t e Task Operation Frequency
b Installation of slope drainage stabilisation products
· Organic and inorganic mulc es are required to be installed over all garden areas time bet een en clearing occurs t e cleared ground Remove entire plant by and Alternatively kill Follo ing
c Tree protection fencing Herbaceous plant it erbicide application using ick iper identification of
ere s o n on t e dra ings is stabilised to reduce t e c ances of silt movement
· All mulc es supplied must be clean free from live eeds eed seeds specifically Ensure t at cleared material is mulc ed or ood c ipped and small or ooded spray no le For erbaceous eeds eeds As
REHABILITATION OF EXISTING VEGETATION WORKS; as appropriate or disposed of in an approved manner weed control cut or scrape stem and paint it 1:1 mi of required to kill
nutsedge pests soil borne viruses and diseases Furt er S PER it certifications
a Installation of supplementary trees s rubs to improve canopy e tent glyp osate and ater eeds
respectively for approval prior to installations
bio diversity Ensure vegetation to be retained is correctly identified
ulc types include: Tasks rill and fill or frilling erbicide is delivered into Follo ing
· Forest Blend ulc 100mm dept to all revegetation areas clearly marked protective devices are installed Large and sap ood via drilled oles or frill cut pockets identification of
REVEGETATION OF DEGRADED LAND; maintained in functional condition immediately after ound is made If
· Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept woody weed eeds As
a Installation of supplementary trees s rubs to create ne canopy and Vegetation to be retained protected s all be as accessibility permits cut stump met od Cut required to kill
control
increase bio diversity nominated per plan field adjusted on site by la tree 30mm above ground and paint stump it eeds
TUBESTOCK PLANTING, SETOUT & TREE GUARD
Protection fence s all be used to protect vegetation undiluted glyp osate
· Bamboo stake setout of trees and s rubs for approval by S PER nominated for retention Fence to be as per detail
2) VEGETATION MANAGEMENT & PROTECTION;
· Setout to be staggered and random to account for terrain variation and replicate Remove aste material containing flo ers or Follo ing
Remove or seeds or eed species from site t at can s oot
natural c aracter Integrity of protection devices identification of
3) WEED MANAGEMENT - CONSTRUCTION PHASE Performance manage from pieces of plant ispose of at approved
· Install tubes per re abilitation sc edules densities specifications details Retained vegetation trees retained in good ealt it vegetative
eeds As
a eed management under e isting canopy of all oody oods and indicators facility aste material to be covered en
· Install tree guard in nominated location as per detail no scars from eart orks mac inery waste
required to kill
reduction of erbaceous grassy eeds removing from site eeds
· aintain as per sc edule
andscape contractor to ater plantings during construction period eekly inspection log by responsible person
4) WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE Frequency
VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting · ere furt er detail is required follo industry standards and met odologies or
contact S PER
1. CONSTRUCTION WORKS Trees: At end of 12 month At end of 2 yr 3 Yr Off Responsible person for contractor reporting to super
Responsible
PRELIMINARIES Criteria establishment establishment maintenance WEED MANAGEMENT - MAINTENANCE PHASE
person
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an and maintenance and maintenance Objective · T is plan as been developed to specify regeneration operations for t e e isting
t ose indicated on t ese plans boundaries All services related infrastructure period period ont ly for eac separable portion of contract to site
Reporting riparian one
including street lig ting s o n on t ese plans are indicative only construction manager
Percentage of 85% 90% 95% · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· Call dial before you dig 11 00 prior to any excavation. landscaping decision notice and site environmental management plan
· Plan dimensions take precedence over scaled dimensions plants alive ake good or replace any damage to trees or vegetation
Corrective
· Prior to commencing construction orks verify in t e field dimensions levels and healthy t at are marked for protection and retention; reinstate
action OBJECTIVES
protective devices
location of site services refer engineer s dra ings generally Average height 1000mm 2000mm 3000mm 1 To en ance t e ecological value of t e locality
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans 2 To remove eeds and minimise future incursion
Shrubs: At end of 12 month At end of 12 month Off
ere discrepancies occur it in landscape documentation refer to A prior to
Criteria establishment establishment
WEED MANAGEMENT - CONSTRUCTION PHASE 3 Encourage natural recruitment and regeneration
maintenance
provision of tender pricing or construction
and maintenance and maintenance · T is plan as been developed to specify regeneration operations for t e e isting 4 Re abilitate degraded areas
Objective
· All proposed fence alignments e cept vegetation protection fencing are to be riparian one 5 Satisfy t e recreational requirements of residents as ell as t e ecological
period period
pegged by a licensed surveyor in coordination it project surveyor · NOTE: T e regeneration plan must be read in conjunction it t e operational orks requirements of a flora and fauna reserve
Percentage of 85% 90% 95% landscaping decision notice and site environmental management plan
SEDIMENT & EROSION CONTROL plants alive · From practical completion all maintenance activities as per follo ing sc edule need
· ere applicable T e landscape contractor to implement maintain for t e and healthy OBJECTIVES to be conducted until project completion
contract duration best practice erosion sediment control measures in accordance 1 To en ance t e ecological value of t e locality
it t e manual for erosion sediment control maroon manual good Average height 2 To remove eeds and minimise future incursion
400mm 1000mm 1200mm
environmental practice t e consulting civil engineers specification for erosion or width 3 Encourage natural recruitment and regeneration
sediment control Penalties fines for non compliance ill apply 4 Re abilitate degraded areas
2. VEGETATION MANAGEMENT & PROTECTION
· Install silt control fencing in accordance it site environmental management plan 5 Satisfy t e recreational requirements of residents as ell as t e ecological
· Native vegetation e ists on site In order to ma imise t e retained ecological values
local aut ority regulations requirements of a flora and fauna reserve
for t e site nominated e isting vegetation requires protection management
· Sediment erosion control devices to be installed ere necessary as directed on
· Natural vegetation regeneration needs to be encouraged
site by super PRELIMINARIES
· Site eed removal is important to allo regeneration
· All sediment erosion control devices are to be installed in accordance it · Before ork commences t e S PER is to organise a pre start meeting it t e
· Vegetation to be protected is plan nominated predominately native species in a
manufacturer s specifications landscape arc itect and NSC environment landscape officer to establis scope of
ealt y safe condition t at are not located so as to interfere it required
· T e contractor is responsible for ensuring sediment erosion control devices are orks management procedures and clarify any issues
approved site orks
inspected maintained
· T e follo ing table summari es t e vegetation management program elements; · ere any discrepancies occur refer to A
OPERATIONS - DISTURBED AREAS
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LD2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH
DRAINAGE RESERVE SHEET 2 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH REHABILITATION NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SPECIFICATION NOTES NTS
Page 3
Rehabilitation Species Schedule Rationale
T e plants in t e follo ing table are a list of species t at c aracterise closed forest rainforest in t e Pomona area and ave been generally derived from NSC To n Plan Table
SC6.3.4.3 Closed Forest/Rainforest Areas Species and are confirmed as appropriate for t is re abilitation program in t e Ecological Assessment Report by Pace Planning
T e species in t e table are also c aracterised in accordance it ld State government bus fire vegetation mapping guidelines of providing a potential fuel load of less t an 8 t a
as required by t e Bus fire itigation Report F 5 01 by Eldon Bottc er Arc itect
PLANT SCHEDULE 1 PLANT SCHEDULE 4
New & Existing Banks To Be Rehabilitated Supplementary Canopy Trees General Landscape Revegetation
BOTANICAL NAME POT SIZE SUGGESTED Zone 1A Zone 1B Zone 1C Zone 1D Zone 1E BOTANICAL NAME POT SIZE SUGGESTED Zone A
SPACING (95m²) (115m²) (458m²) (105m²) (365m²) SPACING (95m²)
TREES TREES
ACMENA smithii 200mm 1/20m2 1 1 2 - 2 ACMENA smithii 200mm 1/16m2 1
AGATHIS robusta 200mm 1/20m2 1 1 2 - 2 AGATHIS robusta 200mm 1/16m2 1
BACKHOUSIA citriodora 200mm 1/20m2 1 1 2 - 1 BACKHOUSIA citriodora 200mm 1/16m2 1
CASTANOSPERMUM australe 200mm 1/20m2 1 - 2 - 1 CASTANOSPERMUM australe 200mm 1/16m2 1
ELAEOCARPUs obovatus 200mm 1/20m2 1 - 2 1 2 ELAEOCARPUs obovatus 200mm 1/16m2 1
FICUS macrophylla 200mm 1/20m2 - - 2 1 2 FICUS macrophylla 200mm 1/16m2 -
FICUS obliqua 200mm 1/20m2 - - 2 1 1 FICUS obliqua 200mm 1/16m2 -
FLINDERSIA australis 200mm 1/20m2 - - 2 1 2 FLINDERSIA australis 200mm 1/16m2 -
GLOCHIDION ferdinandi 200mm 1/20m2 - - 2 1 1 GLOCHIDION ferdinandi 200mm 1/16m2 -
MACARANGA tanarius 200mm 1/20m2 - 1 2 1 2 MACARANGA tanarius 200mm 1/16m2 -
SYZIGIUM australe 200mm 1/20m2 - 1 2 - 2 SYZIGIUM australe 200mm 1/16m2 -
TRISTANIOPSIS laurina 200mm 1/20m2 - 1 2 - 2 TRISTANIOPSIS laurina 200mm 1/16m2 -
WATERHOUSIA floribunda 200mm 1/20m2 - 1 2 - 1 WATERHOUSIA floribunda 200mm 1/16m2 -
TOTAL 5 7 26 6 21 TOTAL 5
NOTES: All plant quantities are shown for reference only, contractor to verify all quantities LARGE SHRUBS @ 40%
2
if a discrepancy exists between plans and schedules, plans to take presedence. Plant ACMENA hemilampra Tubestock 1/m 5
2
shrubs from 140mm pots and Macrophytes & Groundcovers from Tubestock in drifts of ATRACTOCARPAS chartacea Tubestock 1/m 5
7-13. 2
CRYPTOCARYA laevigata Tubestock 1/m 5
2
CYATHEA Cooperi Tubestock 1/m 5
2
HIBISCUS heterophyllus Tubestock 1/m 5
2
HIBISCUS splendens Tubestock 1/m 5
2
PLANT SCHEDULE 2 PITTOSPORUM revolutum Tubestock 1/m 5
2
Disturbed Channel Vegetation SYZIGIUM luehmannii Tubestock 1/m 5
TOTAL 40
BOTANICAL NAME POT SIZE SUGGESTED Zone 2A Zone 2B Zone 2C
SPACING (47m²) (11m²) (20m²)
SMALL SHRUBS, VINES & GROUNDCOVERS @ 60%
2
ALPINIA caerulea Tubestock 4/m 20
2
AUSTROMYRTUS dulcis Tubestock 4/m 20
LARGE SHRUBS @ 30% 2
BAECKEA virgata Tubestock 4/m 20
BANKSIA robor Tubestock 1m 2 14 3 6 2
CISSUS antarctica Tubestock 4/m 20
TOTAL 14 3 6 2
CORDYLINE rubra Tubestock 2/m 10
2
DIANELLA caerulea Tubestock 4/m 20
SMALL SHRUBS, VINES & GROUNDCOVERS @70% 2
BLECHNUM spp. Tubestock 4/m
2
22 5 10 LOMANDRA histrix Tubestock 1/m 5
2
BAUMEA juncea * Tubestock 4/m
2
22 5 10 PANDOREA jasminoides Tubestock 4/m 20
2
FICINIA nodosa* Tubestock 4/m
2
22 5 10 PANDOREA pandorana Tubestock 4/m 20
2
GAHNIA aspera Tubestock 4/m
2
22 5 10 PILIDIOSTIGMA glabrum Tubestock 4/m 20
2
HOVEA acutifolia Tubestock 4/m
2
22 5 10 TABERNAEMONTANA pandacaqui Tubestock 4/m 20
LOMANDRA longifolia Tubestock 1/m
2
5 2 2 TOTAL 195
TOTAL 115 27 52
FINISHES SCHEDULE
CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
PLANT SCHEDULE 3 Smoot uniform eed free
E isting site topsoil refer to Top Soil Soil preparation As
Existing Channel & Vegetation To Remain With Top soil per Specification per plan topsoil mulc surfaces it no As supplied
specification
deleterious materials
Supplementary Canopy Trees nominated areas
BOTANICAL NAME POT SIZE SUGGESTED Area
niform finis 100mm deep free of deleterious
(821m²) FB Organic ulc Street Tree garden pt and gardens 25mm composted materials Install pinned coir mes over bio retention As supplied
SPACING
Forest itter basic mulc areas project entry batter and
storm ater overland flo pat lo flo s ales
niform finis free of deleterious materials eed
TREES SC Organic ulc Bio Retention Basin edia Area s As supplied seed i e Nut sedge 100mm deep Install pinned coir As supplied
ARAUCARIA cunninghamii 200mm 1/20m2 10 Sugar Cane ulc
mes over mulc
ARCHONTOPHOENIX cunninghamiana 200mm 1/20m2 10 Cynodon dactylon Top Soil as per general notes Brig t green
LIVISTONA australis 200mm 1/20m2 10 Turf Couc Bermudagrass Smoot flo ing even positively
150mm deep
LIVISTONA dicipiens 200mm 1/20m2 10 A rade free of pests and eeds draining grades
Turf Rolls Sod
TOTAL 40
Coir ES Coir es Coir Net 400gsm Coir ES pinned do n over ulc as As supplied
per manufactures specification
NOTES: All plant quantities are shown for reference only, contractor to verify all quantities
if a discrepancy exists between plans and schedules, plans to take presedence. Plant
shrubs from 140mm pots and Macrophytes & Groundcovers from Tubestock in drifts of Timber Edge As Per etail As Per etail As Per etail As Per etail
7-13.
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH SHEET 3 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH FINISHES & NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 PLANTING SCHEDULES NTS
Page 4
3x Tube dia.
TUBESTOCK PLANT, REFER TO PLANT
SCHEDULE FOR SPECIES
FORM SHALLOW SAUCER SHAPED
DEPRESSION AROUND PLANT BASE
PLANT PIT 2X WIDTH OF 2x POT Ø SHRUB / GROUNDCOVER / TUFTY
100mm DEEP ORGANIC MULCH PER AS RESEPCTIVE POT. SCARIFY ALL GRASS PLANT SPECIES PER PLAN
SPECIFIED. KEEP MINIMUM 50mm PIT WALLS & BOTTOM, TYP. POT Ø
CLEAR OF PLANT STEM. DO NOT
MULCH BIO-AREA MEDIA SAND. BACKFILL PLANT PIT WITH 100mm ORGANIC MULCH AS
TOPSOIL AS PER SPECIFICATIONS, NOMINATED, KEEP MINIMUM 50mm
AVOID COMPACTION, TYP. FROM PLANT STEM. FORM SHALLOW
CULTIVATED SUBGRADE TO 150mm DISH DRAIN TO BASE OF PLANT, TYP.
GARDEN BED TOPSOIL
PER SPECIFICATIONS, AVOID 'AGRIFORM' SLOW RELEASE
COMPACTION, TYP. FERTILISER. TYPE, SIZE & FORMULA
TOPSOIL AS SPECIFIED
STREET TREE PLANTING DETAIL PLAN 100mm, TYP.
PER SPECIFICATIONS. USE FOR
PHOSPHORUS FREE TABLETS FOR
BANKSIA, CALLISTEMON OR
NOTES:
5 gram 'AGRIFORM' TABLET - USE GREVILLEA SPECIES, TYP.
EXTENT OF PIT EXCAVATION TO BE 1800mm x 1800mm IN AREA, MINIMUM
PHOSPHORUS FREE TABLETS FOR 2x ROOTBALL
(SUBJECT TO FOOTPATH LOCATION). REMOVE ALL EXCAVATED FILL OFF-SITE.
CALLISTEMONS & GREVILLEAS DEPTH, TYP.
SPADE CUT EDGE
SUBGRADE 150mm, TYP. 150mm DEEP CULTIVATED
HARDWOOD
SUBGRADE AS PER
STAKES (2), EXISTING SUBGRADE, TYP. SPECIFICATIONS, TYP.
SEE SECTION
STREET TREE,
REFER DETAIL
BELOW. 4 POTTED SHRUB, GROUNDCOVER OR TUFTY GRASS PLANTING
3 TUBESTOCK PLANTING
ROOTBALL LD4 Typical Section Detail N.T.S.
LP4 Typical Section N.T.S.
KERB INVERT
1800mm
ROAD
TOPSOIL WITH
MULCH ABOVE
EDGE, REFER TO DETAIL WASHED GRAVEL
AS SPECIFIED
TURF AS SPECIFIED
150
TOPSOIL AS
'FIGURE 8' HESSIAN TREE TIE, TYPICAL. SPECIFIED, FINISH 25mm
1000mm 1000mm BELOW TOP OF EDGE TO
ALLOW FOR TURF
CENTRE TREE, 900mm FROM BACK OF KERB, OR
SUBGRADE
BETWEEN KERB & FOOTPATH AS APPLICABLE
7 GRAVEL PLACEMENT N.T.S.
LD4 Typical Section
TIMBER SPECIFICATION:
UNSEASONED HARDWOOD, CLASS 1 SELECT GRADE F17, ACQ OR TANALITH E MIN. H4
NOTES: TREATMENT, WITH ONE COAT OF TIMBER COATING.
ENSURE CROWN OF ROOTBALL LEVEL IS
SET HIGHER THAN ADJACENT FINISHED GALVANISED TIMBER
GROUND LEVELS TO PREVENT EXCESSIVE FIXING SCREWS, TYP.
PONDING AROUND ROOTBALL.
FULL & EVEN CROWN, TYP.
FULL & EVEN CROWN, TYP.
50mm WIDE HESSIAN TREE TIES WRAPPED
LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
SECURED TO STAKE. 50mm WIDE HESSIAN TREE TIES WRAPPED ELEVATION
LOOSELY AROUND TRUNK, THEN A FIGURE 8 &
SECURED TO STAKE WITH GALVANISED NAILS
OR STAPLES. POSITION TREE TIE BETWEEN
2 - 50mm x 50mm x 2400mm F14 HARDWOOD 1/3 TO 1/2 OVERALL HEIGHT OF TREE. 1200mm, MAXIMUM
CENTRALLY POINTED NON-TREATED STAKES
(SHOWN PERPENDICULAR TO KERB FOR 2 - 50 x 50 x 2400mm F14 HARDWOOD PLAN
GRAPHIC CLARITY ONLY). STAKES TO BE CENTRALLY POINTED NON-TREATED STAKES.
DRIVEN VERTICALLY INTO GROUND OUTSIDE STAKES TO BE DRIVEN VERTICALLY INTO
OF THE ROOTBALL. GROUND OUTSIDE OF THE ROOTBALL & 100 x 50 mm TIMBER EDGING 50 x 25 x 450mm HARDWOOD PEG
SHALL HAVE A FINISHED HEIGHT LOWER @1200mm CENTRES
THAN THE TREES LOWER LATERAL LIMBS. 20mm
TURF AS SPECIFIED
FORM SHALLOW SAUCER SHAPED FORM SHALLOW SAUCER SHAPED MULCH AS SPECIFIED
1000mm
DEPRESSION AROUND BASE OF PLANT. KEEP DEPRESSION AROUND BASE OF PLANT. 2x HOT DIPPED
min. 1000mm MULCH NOM. 50mm FROM TRUNK BASE. KEEP MULCH NOM. 50mm FROM TRUNK GALVANISED TRIPLE GRIP
CROWN OF TREE 50mm ABOVE KERB HEIGHT 900mm 900mm BASE. SCREW TO FIX MITRED
TIMBER EDGING
100mm DEEP ORGANIC MULCH AS
100mm DEEP ORGANIC MULCH AS TOGETHER, TYPICAL. SECTION
NOMINATED.
NOMINATED. MOUND MULCH AT EDGE OF
2 x POT Ø PLANT PIT TO COLLECT WATER TO FALL
TURF AS SPECIFIED.
DOWN EDGES OF PLANT PIT. DO NOT MULCH
POT Ø WITHIN 50mm OF PLANT STEM.
8 HARDWOOD TREATED GARDEN EDGE N.T.S.
LD4 Typical Detail
TURF OR GARDEN, REFER TO PLAN.
SPADE EDGE
COMPACTED SOIL UNDER TREE
SPADE EDGE, REFER TO DETAIL.
600mm
TOPSOIL PROFILE AS PER GENERAL NOTES
TREE PIT TO BE EXCAVATED TO NOMINAL PROJECT SPECIFICATIONS.
DEPTH VARIES
DEPTH OF 600mm. BACKFILL HOLE WITH
TOPSOIL PER SPECIFICATIONS FIRMING TREE PIT TO BE EXCAVATED TO NOMINAL SPADE CUT EDGE TO TURF & GARDEN TOP SOIL PER
200mm 150mm 300mm
PROGRESSIVELY. EXCESS EXCAVATED SOIL DEPTH OF 600mm. BACKFILL HOLE WITH INTERFACES WHERE NO HARD EDGE IS SPECIFICATIONS
TO BE REMOVED OFF SITE. 100% TOPSOIL PER SPECIFICATIONS FIRMING SPECIFIED, 150mm DEEP.
PROGRESSIVELY. EXCESS EXCAVATED SOIL TURF AS SPECIFIED.
TO BE REMOVED OFF SITE. 100mm THICK ORGANIC MULCH
SCARIFY PIT WALLS & CULTIVATE PIT AS SPECIFIED.
BOTTOM 150mm, TYP. 150mm
150mm CULTIVATED SUBGRADE & PIT WALLS. SLOW RELEASE FERTILIZER AS PER SUBGRADE, FORM TO SUIT
SLOW RELEASE FERTILIZER AS PER MANUFACTURER & SPECIFICATIONS. FINISH LEVEL & CONTOURS.
MANUFACTURER & SPECIFICATIONS.
COMPACTED SOIL UNDER TREE
9 SPADE CUT EDGE AT TURF / TREE GARDEN INTERFACES
1 STREET TREE PLANTING - SPADE EDGES N.T.S. 2 TREE PLANTING - in GARDEN or TURF N.T.S.
NTS
LP4 Typical Section
LP4 Typical Section Detail LD4 Typical Section
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LD4
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH SHEET 4 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 TYPICAL DETAILS NTS
Page 5
LEGEND UNIT 9 UNIT 3
Power
Surveyed C annel Alignment
F1
TURF. one 1d Refer To
Refer to Plans, General Notes, & Finishes Schedule one 1c Refer To Plant Sc edule 1
Plant Sc edule1
Telstra BioBasin Refer To UNIT 2
dary
MULCHED MAINTENANCE ACCESS PATH. one 2b Refer To
Occasional Boulders To Suit Conditions As Per andscape Concept Plan
Plant Sc edule 2
Boun
F1
Topo's Stormwater Recommendations
isturbed C annel Vegetation To Be Fence On Retaining all By Arc itect
erty
Re abilitated it Sedges rasses Only
LOW PLANTING. Refer to Plant Sc edule 2
Prop
Refer to Landscape Concept Plan
Retaining all By Civil
Surveyed C annel Alignment
F1
BIO BASIN. Additional non mapped E isting C annel Vegetation To Remain it
Refer To Landscape Concept Plan Riparian Buffer 353m2 Supplementary Canopy Trees Spaced To 0 0
Area To Be Protected As Ne anning s n Roug ness Coefficient As Per NS one 1b Refer To
F1
Riparian Buffer apping Topo s ydraulic esign Plant Sc edule 1
ENERA AN SCAPE REVE ETATION Refer To Plant Sc edule 3
Refer To Plans eneral Notes Finis es Sc edule
E isting Native Trees To Be Retained And UNIT 8
UNIT 1
E tent Of Canopy Refer: Pace Planning Site
F1
BANKS TO BE REHABILITATED Ecological Assessment Plan 2022 0 01 Reva
Refer To Plans eneral Notes Finis es Sc edule
eave ap In Flo one To Site Conditions
2
ROCK SCOURING
SP301620
F1
Refer to Plans, General Notes, & Finishes Schedule 800 Silt Control Fence To Property Boundary rive ay
DISTURBED CHANNEL VEGETATION ulc ed aintenance Access Pat
Refer to Plans, General Notes, & Finishes Schedule Occasional Boulders To Suit Conditions As
Per Topo s ydraulic esign
ADDITIONAL NON MAPPED RIPARIAN BUFFER
Area To Be Protected As New Riparian Buffer Ne E isting Banks To Be Re abilitated F1 F1
it Supplementary Canopy Trees To 0 0
annins n Roug ness Coefficient As Per o Planting
CONCRETE BY CIVIL NS apping Topo s ydraulic esign Refer To andscape Concept Plan
Refer to Plans, General Notes Refer To Plant Sc edule 1
F1 F1
Bins Sign By
E ISTIN NATIVE TREES TO BE RETAINE Arc itect
Refer to Pace Planning Site Ecology Report
Property Boundary
Telstra
Nesting Bo ocation TBC On Site
WM
Power
WM
WM
Water
SURVEYD TOP OF BANK
Water
Telstra
Refer to Plans & General Notes o Planting
HHY
one 2a Refer To Refer To andscape Concept Plan
SURVEYD BOTTOM OF BANK Surveyed Bottom Of Batter it Civil esign Amendments Plant Sc edule 2
Refer to Plans & General Notes
one 1a Refer To
Plant Sc edule 1
RETAINING WALL BY CIVIL
Refer to Plans & General Notes
F1 F2 F3: FENCE B ARC ITECTS
Surveyed Top Of Batter it Civil esign Amendments
F o Planting
Refer to Plans eneral andscape Revegetation Planting Refer To andscape Concept Plan
Areas Refer To Plant Sc edule 4
800 Silt Control Fence To Property Boundary
Refer to Plans eneral Notes
STREET TREES
Refer to Plans, Notes, Finishes & Planting Schedule
PROPERT BO N AR
Refer to Plans Street Trees Alignment C anged Entry erb By Civil
To Allo Clear Sig t ines
Clean Sig t ines NTP Fig 9 4 5 5 Street Trees At 8m Intervals Ne Concrete Pat By Civil CHURCH STREET
Refer To andscape Concept
Plan For Plant Sc edule
2 1 206 205
RP4344 RP4344 P5011 P5011
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LP1
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH 0 1 2 3 4 5 SHEET 1 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH SCALE 1:200 @ A3 REHABILITATION SCA E 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCA E 1:200 A3
Page 6
gs n
annin
F1
F3
g
T o 0 1 il appin
Ca n Be Counc Carparks
g To
pacin efer
ab S ficient R
Re o ef
ss C
g ne one 1e Refer To
F3
Rou Plant Sc edule 1
2
F1
SP301620
Retaining all By Civil
UNIT 12
F3
F1
F1
Additional non mapped Riparian Buffer 10 5m2
Area To Be Protected As Ne Riparian Buffer F3
Nesting Bo ocation TBC On Site
Pr
op
F1
er
LEGEND ty
Bo
un
da
TURF. ry
F1
Refer to Plans, General Notes, & Finishes Schedule UNIT 11
MULCHED MAINTENANCE ACCESS PATH.
F3
Occasional Boulders To Suit Conditions As Per
F1
Topo's Stormwater Recommendations
UNIT 10
LOW PLANTING. one 1c Refer To
Refer to Landscape Concept Plan Plant Sc edule 1
Nesting Bo ocation TBC On Site
F1
BIO BASIN. 800 Silt Control Fence To Property Boundary
Refer To Landscape Concept Plan
E isting Native Trees To Be Retained And
F1
ENERA AN SCAPE REVE ETATION E tent Of Canopy Refer: Pace Planning Site
Refer To Plans eneral Notes Finis es Sc edule Ecological Assessment Plan 2022 0 01 Rev A
F1 F1 F1
BANKS TO BE REHABILITATED o Planting
Tel
Refer To Plans eneral Notes Finis es Sc edule Refer To andscape Concept Plan
isturbed C annel Vegetation To Be one 2c Refer To
Plant Sc edule 2
Power
Re abilitated it Sedges rasses Only
ROCK SCOURING Refer to Plant Sc edule 2
Refer to Plans, General Notes, & Finishes Schedule
Water
Surveyed C annel Alignment
DISTURBED CHANNEL VEGETATION
F1
Refer to Plans, General Notes, & Finishes Schedule
E isting C annel Vegetation To Remain it Supplimentary
Canopy Trees Spaced To 0 0 anning s n Roug ness
ADDITIONAL NON MAPPED RIPARIAN BUFFER Coefficient As Per NS apping Topo s ydraulic esign
Area To Be Protected As New Riparian Buffer Refer To Plant Sc edule 3
F1
UNIT 9
one 1d Refer To
Plant Sc edule 1
CONCRETE BY CIVIL
Refer to Plans, General Notes Ne E isting Banks To Be Re abilitated it
225PVC
Supplementary Canopy Trees To 0 0 annins n Roug ness
F1
Coefficient As Per NS apping Topo s ydraulic esign
E ISTIN NATIVE TREES TO BE RETAINE Refer to Plant Sc edule 1
Refer to Pace Planning Site Ecology Report
BioBasin Refer To
F1
SURVEYD TOP OF BANK andscape Concept Plan
Telstra
Refer to Plans & General Notes ulc ed aintenance Access Pat
Power
Occasional Boulders To Suit Conditions As Fence On Retaining all By Arc itect
Per Topo s ydraulic esign
SURVEYD BOTTOM OF BANK
Refer to Plans & General Notes
F1
Retaining all By Civil
rive ay
RETAINING WALL BY CIVIL Surveyed Bottom Of Batter it Civil esign Amendments
Refer to Plans & General Notes
F1
F1 F2 F3: FENCE B ARC ITECTS
F
Refer to Plans
Power
800 Silt Control Fence To Property Boundary
F1
Refer to Plans eneral Notes
Additional non mapped Riparian Buffer 353m2
Telstra
Area To Be Protected As Ne Riparian Buffer
STREET TREES
Refer to Plans, Notes, Finishes & Planting Schedule
F1
one 2b Refer To UNIT 8
Plant Sc edule
PROPERT BO N AR
Refer to Plans
F1
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LP2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH 0 1 2 3 4 5 SHEET 2 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH SCALE 1:200 @ A3 REHABILITATION SCA E 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCA E 1:200 A3
Page 7
LEGEND
TURF. ENERA AN SCAPE REVE ETATION CONCRETE BY CIVIL RETAINING WALL BY CIVIL STREET TREES
Refer to Plans, General Notes, & Finishes Schedule Refer To Plans eneral Notes Finis es Sc edule Refer to Plans, General Notes Refer to Plans & General Notes Refer to Plans, Notes, Finishes & Planting Schedule
MULCHED MAINTENANCE ACCESS PATH.
BANKS TO BE REHABILITATED E ISTIN NATIVE TREES TO BE RETAINE F1 F2 F3: FENCE B ARC ITECTS PROPERT BO N AR
Occasional Boulders To Suit Conditions As Per F
Topo's Stormwater Recommendations
Refer To Plans eneral Notes Finis es Sc edule Refer to Pace Planning Site Ecology Report Refer to Plans Refer to Plans
LOW PLANTING. ROCK SCOURING SURVEYD TOP OF BANK ADDITIONAL NON MAPPED RIPARIAN BUFFER
Refer to Landscape Concept Plan Refer to Plans, General Notes, & Finishes Schedule Refer to Plans & General Notes Area To Be Protected As New Riparian Buffer
BIO BASIN. DISTURBED CHANNEL VEGETATION SURVEYD BOTTOM OF BANK 800 Silt Control Fence To Property Boundary
Refer To Landscape Concept Plan Refer to Plans, General Notes, & Finishes Schedule Refer to Plans & General Notes Refer to Plans eneral Notes
Additional non mapped eave ap In Flo 800 Silt Control Fence
Riparian Buffer 0m2 one To Site Conditions To Property Boundary
Area To Be Protected As
Ne Riparian Buffer andscape Terrace Refer To andscape Concept Plan
Property Boundary
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2
Nesting Bo ocation TBC On Site
F3
F1
Surveyed Top Of Batter it Civil esign Amendments
F3
F3
F3
Surveyed Bottom Of Batter it Civil esign Amendments one 1e Refer To
Plant Sc edule 1
F3
F1
F3
F1
F3
F1
F3
F1
3
one 1c Refer To
SP301620 Plant Sc edule 1
Pro
pe
rty
F3
F1
Bo
un
da
ry
UNIT 13 UNIT 14 UNIT 15 UNIT 16 UNIT 17
F3
F1
E isting Native Trees To Be Retained And
E tent Of Canopy Refer: Pace Planning Site
F1
Ecological Assessment Plan 2022 0 01 Rev A
ulc ed aintenance Access Pat
Occasional Boulders To Suit Conditions As
F1
Surveyed C annel Alignment Per Topo s ydraulic esign
rive ay
E isting C annel Vegetation To Remain it Supplementary Retaining all By Civil
Canopy Trees Spaced To 0 0 anning s Roug ness
F1
Coefficient As Per NS apping Topo s ydraulic esign
Prop
Fence On Retaining all By Civil
Refer To Plant Sc edule 3 Nesting Bo ocation TBC On Site
erty B
F1 F1 F1
F3 F3 F3 F3
gs n
ound
1 annin ping
0 p
To il a
n Be ounc
ary
ing Ca fer To C
F1
a c
F3
p e
Ne E isting Banks To Be Re abilitated ab S ficient R Carparks
Re f
it Supplementary Canopy Trees To 0 0 s s Coe
g ne
annins n Roug ness Coefficient As Per Rou
NS apping Topo s ydraulic esign
F3
UNIT 12
2 Communal Space
F1
SP301620 Refer To andscape
Concept Plan
F3
Client Project anembo consultants
F1
NORT TITLE: JOB No.: S22061152a
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LP3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH 0 1 2 3 4 5 SHEET 3 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH SCALE 1:200 @ A3 REHABILITATION SCA E 1:100 A1 Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCA E 1:200 A3