220623 Church Rehab 'B'
Attached to the e-mail EMAIL 3 OF 3 - MCU22/0031 and OPW22/0062 - INFORMATION REQUEST RESPONSE.
T ice eekly during prolonged rain
REHABILITATION WORKS SPECIFICATIONS · All stockpiles are to be protected it suitable erosion control devices graded to TREE PROTECTION MEASURES OPERATIONS - DISTURBED AREAS
This plan has been developed to comply with the Noosa Shire Council ensure control of runoff · T e follo ing tree protection measures must at all times be ad ered to during any · Identify eeds If unsure consult A All ot er vegetation to be protected and
Planning Scheme as applicable where practical · Coordinate installation of sediment erosion control devices it civil contractor to on site orks generally in accordance it AS49 0 2009 protection of trees on retained
ABBREVIATIONS ensure compatibility consistency in control measures development sites A ill advise ere measures are required at Pre start but is · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
AS Australian Standard ot dipped · All e posed surfaces once completed s all be immediately stabili ed to prevent generally to standard s of e isting trees t at are s o n as re abilitation areas · ecompact ground and cultivate to 5mm deep
EP Establis ment Period A andscape Arc itect erosion · Prior to commencement of orks t e contractor to organise a pre construction · rade ground surface to create smoot falls a ay from pat s ere necessary
N A Not applicable OC On centre meeting to identify trees for protection removal and or pruning · Remove all ant ropogenic rubbis
P aintenace Period m2 Square metres EDGING · Protective fencing is to be installed around t e tree protection one generally in · Obtain a report by a qualified person identifying at tree maintenance measures
m3 Cubic etres T P Typical Spade Edge accordance it AS49 0 2009 prior to site establis ment and remain intact and are required and utili e a qualified person to conduct t e orks
NATA National Association of Testing Aut orities S PER Superintendent · Install Spade Cut edge as located on plans as per detail monitored and certified by t e project arborist until completion of orks · op dead dying or dangerous limbs or trees as required to remove risk of injury to
uPVC nplasticised polyvinyl C loride Pipe NSC Noosa S ire Council · Refer to etail for protective fencing specifications users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
B ater by esign AO andscape Assessment Officer REHABILITATION AREAS · Any orks it in t e tree protection one to be supervised by t e project arborist ground surface it in regeneration ones at least 5 meters from pat s and ot er
Soil · Activities it in t e tree protection one are to be aut orised and supervised by t e infrastructure
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils project arborist No compaction from ve icles pedestrian movement stockpiling of · All felled vegetation is to be retained on site resultant mulc is to be used in
· Apart from declared eeds all e isting vegetation s all be retained as been andscape contractor to coordinate it civil contractor to ensure topsoil is top soil e cavation no dumping of aste or cutting it in t e root one s is to revegetation landscaping or soil stabilisation activities
identified it retention protection measures for suc are nominated erein re installed per t e follo ing specifications in respective landscape areas occur · Add 100mm ulc to all disturbed areas
· Identified areas are confined to areas of eed management t ose nominated on · Clear remove all non organic deleterious and large organic matter suc as rocks · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
t ese plans it associated orks described erein greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to project arborist to ensure t at t e correct arboreal tec niques are utilised OPERATIONS - UNDISTURBED AREAS
Plant sc edules derived from NSC To n Plan Table SC 3 4 3 Closed Forest be landscaped · Identify eeds If unsure consult A All ot er vegetation to be protected and
· E cavate and remove off site any remaining fill to turf and garden areas to ensure VEGETATION MANAGEMENT PROTECTION PROGRAM retained
Rainforest Areas Species and EBA Bus fire itigation Report Appendi E Plant
Species ist correct dept s for topsoils Issue Vegetation management - clearing & protection
· Treat all eeds and pasture grasses Refer to eed Removal Sc edule
· andscape contractor to conduct soils analyses tests to stockpiled topsoils and · Remove all ant ropogenic rubbis
ameliorate per recommendations prior to re spreading Furnis la it results · op dead dying or dangerous limbs or trees as required to remove risk of injury to
andscape contractor to allo for for p balancing nutrient ameliorations all soil Objective Identify areas of vegetation individual trees to be users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
protected retained it in t e development areas t ose
testing to be conducted by a lab accredited by NATA ground surface it in regeneration ones at least 5 meters from pat s and ot er
to be cleared
infrastructure
Ensure t at orkers understand t e requirements of
Cultivate · All felled vegetation is to be retained on site mulc is to be used in revegetation
PROJECT DESCRIPTION protection retention install protective devices to
· Cultivate ground in all disturbed areas to a dept ere possible to 5mm dept for ensure no accidental damage occurs landscaping or soil stabilisation activities
THIS WORK COMPRISES OF;
inspection before installation of soil re ab Ensure t at clearing met ods are appropriate for areas · Identify location for supplement planting for canopy integrity
· Avoiding any root systems being cleared especially in t e vicinity of areas to be
1) CONSTRUCTION WORKS: WEED REMOVAL SCHEDULE
a Retaining associated drainage protected
Mulch Ensure t at t e ork program is suc as to minimise t e Task Operation Frequency
b Installation of slope drainage stabilisation products
· Organic and inorganic mulc es are required to be installed over all garden areas time bet een en clearing occurs t e cleared ground Remove entire plant by and Alternatively kill Follo ing
c Tree protection fencing Herbaceous plant it erbicide application using ick iper identification of
ere s o n on t e dra ings is stabilised to reduce t e c ances of silt movement
· All mulc es supplied must be clean free from live eeds eed seeds specifically Ensure t at cleared material is mulc ed or ood c ipped and small or ooded spray no le For erbaceous eeds eeds As
REHABILITATION OF EXISTING VEGETATION WORKS; as appropriate or disposed of in an approved manner weed control cut or scrape stem and paint it 1:1 mi of required to kill
nutsedge pests soil borne viruses and diseases Furt er S PER it certifications
a Installation of supplementary trees s rubs to improve canopy e tent glyp osate and ater eeds
respectively for approval prior to installations
bio diversity Ensure vegetation to be retained is correctly identified
ulc types include: Tasks rill and fill or frilling erbicide is delivered into Follo ing
· Forest Blend ulc 100mm dept to all revegetation areas clearly marked protective devices are installed Large and sap ood via drilled oles or frill cut pockets identification of
REVEGETATION OF DEGRADED LAND; maintained in functional condition immediately after ound is made If
· Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept woody weed eeds As
a Installation of supplementary trees s rubs to create ne canopy and Vegetation to be retained protected s all be as accessibility permits cut stump met od Cut required to kill
control
increase bio diversity nominated per plan field adjusted on site by la tree 30mm above ground and paint stump it eeds
TUBESTOCK PLANTING, SETOUT & TREE GUARD
Protection fence s all be used to protect vegetation undiluted glyp osate
· Bamboo stake setout of trees and s rubs for approval by S PER nominated for retention Fence to be as per detail
2) VEGETATION MANAGEMENT & PROTECTION;
· Setout to be staggered and random to account for terrain variation and replicate Remove aste material containing flo ers or Follo ing
Remove or seeds or eed species from site t at can s oot
natural c aracter Integrity of protection devices identification of
3) WEED MANAGEMENT - CONSTRUCTION PHASE Performance manage from pieces of plant ispose of at approved
· Install tubes per re abilitation sc edules densities specifications details Retained vegetation trees retained in good ealt it vegetative
eeds As
a eed management under e isting canopy of all oody oods and indicators facility aste material to be covered en
· Install tree guard in nominated location as per detail no scars from eart orks mac inery waste
required to kill
reduction of erbaceous grassy eeds removing from site eeds
· aintain as per sc edule
andscape contractor to ater plantings during construction period eekly inspection log by responsible person
4) WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE Frequency
VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting · ere furt er detail is required follo industry standards and met odologies or
contact S PER
1. CONSTRUCTION WORKS Trees: At end of 12 month At end of 2 yr 3 Yr Off Responsible person for contractor reporting to super
Responsible
PRELIMINARIES Criteria establishment establishment maintenance WEED MANAGEMENT - MAINTENANCE PHASE
person
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an and maintenance and maintenance Objective · T is plan as been developed to specify regeneration operations for t e e isting
t ose indicated on t ese plans boundaries All services related infrastructure period period ont ly for eac separable portion of contract to site
Reporting riparian one
including street lig ting s o n on t ese plans are indicative only construction manager
Percentage of 85% 90% 95% · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· Call dial before you dig 11 00 prior to any excavation. landscaping decision notice and site environmental management plan
· Plan dimensions take precedence over scaled dimensions plants alive ake good or replace any damage to trees or vegetation
Corrective
· Prior to commencing construction orks verify in t e field dimensions levels and healthy t at are marked for protection and retention; reinstate
action OBJECTIVES
protective devices
location of site services refer engineer s dra ings generally Average height 1000mm 2000mm 3000mm 1 To en ance t e ecological value of t e locality
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans 2 To remove eeds and minimise future incursion
Shrubs: At end of 12 month At end of 12 month Off
ere discrepancies occur it in landscape documentation refer to A prior to
Criteria establishment establishment
WEED MANAGEMENT - CONSTRUCTION PHASE 3 Encourage natural recruitment and regeneration
maintenance
provision of tender pricing or construction
and maintenance and maintenance · T is plan as been developed to specify regeneration operations for t e e isting 4 Re abilitate degraded areas
Objective
· All proposed fence alignments e cept vegetation protection fencing are to be riparian one 5 Satisfy t e recreational requirements of residents as ell as t e ecological
period period
pegged by a licensed surveyor in coordination it project surveyor · NOTE: T e regeneration plan must be read in conjunction it t e operational orks requirements of a flora and fauna reserve
Percentage of 85% 90% 95% landscaping decision notice and site environmental management plan
SEDIMENT & EROSION CONTROL plants alive · From practical completion all maintenance activities as per follo ing sc edule need
· ere applicable T e landscape contractor to implement maintain for t e and healthy OBJECTIVES to be conducted until project completion
contract duration best practice erosion sediment control measures in accordance 1 To en ance t e ecological value of t e locality
it t e manual for erosion sediment control maroon manual good Average height 2 To remove eeds and minimise future incursion
400mm 1000mm 1200mm
environmental practice t e consulting civil engineers specification for erosion or width 3 Encourage natural recruitment and regeneration
sediment control Penalties fines for non compliance ill apply 4 Re abilitate degraded areas
2. VEGETATION MANAGEMENT & PROTECTION
· Install silt control fencing in accordance it site environmental management plan 5 Satisfy t e recreational requirements of residents as ell as t e ecological
· Native vegetation e ists on site In order to ma imise t e retained ecological values
local aut ority regulations requirements of a flora and fauna reserve
for t e site nominated e isting vegetation requires protection management
· Sediment erosion control devices to be installed ere necessary as directed on
· Natural vegetation regeneration needs to be encouraged
site by super PRELIMINARIES
· Site eed removal is important to allo regeneration
· All sediment erosion control devices are to be installed in accordance it · Before ork commences t e S PER is to organise a pre start meeting it t e
· Vegetation to be protected is plan nominated predominately native species in a
manufacturer s specifications landscape arc itect and NSC environment landscape officer to establis scope of
ealt y safe condition t at are not located so as to interfere it required
· T e contractor is responsible for ensuring sediment erosion control devices are orks management procedures and clarify any issues
approved site orks
inspected maintained
· T e follo ing table summari es t e vegetation management program elements; · ere any discrepancies occur refer to A
OPERATIONS - DISTURBED AREAS
Client Project NORT TITLE: JOB No.: S22061152a
anembo consultants
FILE: 220623
Alba Projects Pty Ltd 11c Church St, Pomona DWG. No. LD2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall Rehabilitation Plan B 23.06.22 AMENDMENTS CK TH
DRAINAGE RESERVE SHEET 2 OF 7 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
A 17.06.22 COUNCIL SUBMISSION CK TH REHABILITATION NTS Ph: 07 5437 0000
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 SPECIFICATION NOTES NTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.