Skip to the record
The gold standard in government transparency.

Council archive · source document

Decision Notice - MCU22 0038 01 [As Published] · MCU22/0038.01

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      c.      a total of 16 bicycle parking spaces; and
                      d.      end of trip facilities involving 8 lockers, 2 male and female showers and change rooms
                              within the development.
                      Water Quality
               57.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with an Operational Works approval and the latest version
                      of the Water Sensitive Urban Design Technical Design Guidelines for South East
                      Queensland, and must include in particular:
                      a.      stormwater quality treatment devices of a size and location generally in accordance
                              with those shown in Stormwater Management Plan, prepared by MPN Consulting,
                              dated 27th June 2022;
                      b.      bioretention devices which:
                              i.       demonstrate that Bio basin 1 is able to gravity drain to the existing stormwater
                                       infrastructure on site. The outlet pipe grade must be a minimum of 0.5% to
                                       ensure the bio basin is free draining.
                              i.       are designed generally in accordance with the Bioretention Technical Design
                                       Guidelines (Water by Design, 2012)
                              ii.      are designed, where applicable, generally in accordance with IPWEQA Standard
                                       Drawing No. DS-073, DS-075, DS-076, and DS-078
                              iii.     are provided with a free-draining outlet from the sub-soil drainage system
               58.    A maintenance manual is required to be prepared for the stormwater quality treatment
                      devices, rainwater tanks and basement pump out system for the development. This manual
                      is to be submitted to Council at Operational Works stage for review.
               59.    Permanent educational signage must be erected to educate the residents of the development
                      about the function of the bioretention device(s). The dimensions, standard, presentation and
                      location of the educational signage must be in accordance with an Operational Works
                      approval.
               60.    All stormwater quality treatment devices must be maintained in accordance with the Water
                      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
                      Operational Works drawings for the stormwater quality treatment system and detailed life
                      cycle costing of the system must be attached as an addendum to this document. Records of
                      all maintenance activities undertaken must be kept and made available to Council upon
                      request.
               61.    Any proposed Community Management Statement required for the development must
                      include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
                      must include the full cost of maintaining the system in accordance with Water by Design
                      (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
                      system must be included in the proposed levies for each unit owner.
                      Stormwater Drainage
               62.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and the Queensland Urban Drainage Manual, and must include in particular:
                      a.      the detention system generally as described in Stormwater Management Plan,
                              prepared by MPN Consulting, dated 27th June 2022;
                      b.      the use of gravity stormwater drainage and not surcharge pits to the maximum extent
                              practicable. Surcharge pits may only be used where the catchment is composed of roof
                              surfaces only;
                      c.      provision of rainwater tanks for the capture and reuse of roof water for the irrigation of
                              communal landscaping; and


                                                                                                          Page 7 of 15
Document Set ID: 22385500
Version: 8, Version Date: 28/04/2023

Used in these records

About this file

File size
323 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - MCU22 0038 01 [As Published].pdf · 323 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗