Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 81-167
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Climate Change
Intensive urban development exacerbates major The development does not benefit from high
climate events caused by global warming. levels of accessibility, public transport or
All new developments should be set well back proximity to schools or employment nodes
from the sea and coastal flood plains due to the and will result in car dependency for its
impact of rising sea levels and increasing violent residents.
storms. The proposed setback to Lake Weyba is
Proposed clearing of trees and grasses, insufficient to protect against increased risks
increased population and vehicles will result in due to climate change.
increased carbon being released into the
atmosphere.
Urban Design
The location of the development will result in While the development site has proximity to
heavy reliance on motor vehicle for goods or Noosa’s urban area and its primary
services. commercial centre it does not benefit from
good connectivity. Residents will be highly
car dependent as a result.
Infrastructure
The subject site was never intended for urban The proposal falls outside of areas planned
development and is not planned to be serviced for community infrastructure and essential
with urban infrastructure. services and represents inefficient urban
The proposed development relies on the surplus form and delivery of the infrastructure it does
capacity of existing and planned infrastructure provide.
This is likely to result in there being no surplus
capacity to cater for contingencies and a drop in
the standard of service.
Development will generate additional burdens on
Council by way of road maintenance, water
supply, waste management and sewage
treatment. This will increase costs to Noosa
ratepayers.
Impact on capacity of the Noosa sewerage
treatment plant which is due to be upgraded in
2015.
Development brings forward water storage
deficiency of the Tewantin Reservoir to 2016.
Weyba Downs residents are currently on self-
provided tank water and should not be forced
into using town utilities if the development is
approved.
Development will require footpaths and lighting
to be provided from the site to the nearby Noosa
Civic.
Development will impact on social infrastructure
such as schools, medical services, libraries and
community services.
Rates paid would not go to Noosa where
facilities would be used.
Why should Noosa residents fund water,
sewerage and power to service development?
Page 153 of 231
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.