• Condition 5 requires that the approved Bunnings warehouse on the balance portion of the site must be
operated in accordance with development approval 07/0256.
• Condition 7 requires muted environmental tones, and a colour scheme that must be different to the
existing Bunnings Warehouse.
• Condition 15d requires provision of 1 street tree for every 8 metres of road frontage.
• Condition 20 requires a $20,000 security prior to the issue of a development permit for operational works
to secure performance of the conditions of approval.
• Conditions 21, 39 and 40 relate to carrying out an acid sulphate soils investigation and potential
preparation of a management plan if required.
We provide details of representations regarding these conditions below.
2 Representations
2.1 Conditions 3 and 13
The requirements of conditions 3 and 13 are unworkable and will prevent development proceeding. They
effectively render the approval to be of no value. Changes to the design that would be required to comply with the
conditions would result in a building that is operationally unworkable for Bunnings.
In the Council officer’s report recommending approval of the proposed development, no such amendments to the
plans were included in the recommended conditions package.
In short, the removal of the requirements regarding building height is sought on the basis that:
1. Complying with the conditions would render the building operationally unworkable for Bunnings. The
conditions render the development approval to be of no value to Bunnings.
2. The 10 metre height limit was justified based on a perceived precedent set by the Maroochydore trade centre,
which is not a reasonable or appropriate comparison.
3. The requirements for 10 metre maximum building height above finished levels have no basis in the planning
scheme. These are unreasonable conditions.
4. Adequate measures (setback, landscaping, and comparable height to the adjoining development) have been
provided to ensure amenity and attractive streetscape such that reduced building height is not necessary.
5. The building is far removed from Eumundi Noosaville Road. It does not front that road, and does not have
potential to adversely affect the amenity of this entry into Noosaville.
6. The proposed building height complies with the planning scheme performance outcome for building height.
Removal of the requirement to change the exit driveway design is sought on the basis that:
7. Significant front setback and landscape planting within the setback will provide adequate screening. This will
be more effective than a 0.5m strip which will not be sufficient to enable any plants to achieve height.
8. The planning scheme allows that an industrial development need not have any setback to a side boundary.
On this basis it is unreasonable for Council to require a change to the design to incorporate a landscape strip,
where a built to boundary wall would otherwise be allowable.
9. Operationally unworkable.
10. Unreasonable to expect mitigation of an adjoining development. The development on the adjoining site at 13
Vision Court sits on a separate lot and subject to a separate approval.
Clarification is also sought regarding the nature of eave required. That is:
11. It is unclear if the eave is to be a forward projection of the main roofline, or a projecting eave over the front of
the understorey level (e.g. to provide cover to the car park entry/exits) and provide articulation at that mid-level
on the front elevation.
We provide further explanation below.
RPS AAP Consulting Pty Ltd. Registered in Australia No. 97 117 883 173
rpsgroup.com Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU22-0051_Change Representations_v1.4_041223.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.