Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2016-02-08 General Committee Agenda

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 8 February 2016

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Bob Abbot, Sandy Bolton,
             Joe Jurisevic, Frank Pardon, Noel Playford, Tony Wellington



   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2016-02-08 General Committee Agenda(PDF, 10MB).pdf · 10.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 38 (of 47)

Section 2

GENERAL COMMITTEE MEETING AGENDA                            8 FEBRUARY 2016


TABLE OF CONTENTS


ITEM                                                                   PAGE


ATTENDANCE & APOLOGIES                                                      -

PRESENTATIONS                                                               -

ITEMS REFERRED FROM INFRASTRUCTURE & SERVICES COMMITTEE                     -

ITEMS REFERRED FROM PLANNING & ORGANISATION COMMITTEE                       -

REPORTS DIRECT TO GENERAL COMMITTEE                                        3

1      COMMUNITY GRANTS POLICY 2016/17                                      3

2      JANUARY 2016 YEAR TO DATE (YTD) COUNCIL FINANCIAL PERFORMANCE      16

3      DECEMBER QUARTER BUDGET REVIEW                                     23

CLOSED SESSION                                                        -




                                                                 Page 2 of 47

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                              8 FEBRUARY 2016


REPORTS DIRECT TO GENERAL COMMITTEE


1                        COMMUNITY GRANTS POLICY 2016/17
DOCUMENT INFORM AT ION




Author                              Community Development Coordinator, Alison Hamblin
                                    Community Services Department

Index                               ECM/Subject/Community Grants

Attachments                         1.   Community Grants Policy


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Development Coordinator to the General
Committee Meeting dated 8 February 2016 and
A.                       Adopt the updated Community Grants Policy provided at Attachment 1 to the report;
B.                       Allocate unspent water and sewerage funds from 2015/2016 to pay outstanding water bills
                         from previous years and implement recommendations from recent hydrology reports
                         undertaken for eligible not for profit community organisations; and
C.                       Repeal the current Festive Season Event Grants Policy.


REPORT
Council’s power to issue grants is governed by the Local Government Act 2009 and the Local
Government Regulation 2012. The Community Grants Policy ensures alignment with this
legislation.

In the last quarter of 2015 Council officers undertook a strategic review of the administration of
Noosa Council’s Community Grants program. The objective was to improve the efficiency,
effectiveness, accountability and transparency of the Community Grants program.

The review found that generally the grants program was well received and is a strategic
investment tool assisting the community to meet and respond to Council’s priorities and vision.

The review supported the current strategies of providing funding on a needs basis and Council
officers working to encourage and assist community organisations to identify external funding
where available, rather than simply relying on Council funding.

It identified some administrative issues and lack of clarity regarding the eligibility for Operational
Grant funding and explored options with regard to supporting Community Organisations through
the provision of water rebates and Council covering various types of insurance through its own
policies.

Updated Community Grants Policy

As a result of the 2015 Community Grants review the following changes are proposed to the
current Community Grants Policy:


                                                                                                    Page 3 of 47

Section 4

GENERAL COMMITTEE MEETING AGENDA                                             8 FEBRUARY 2016


   Operational Grants – It is proposed that these grants be discontinued.

   Community Alliance Grants – This is a new category of funding which will:
     o  provide financial support for up to 3 years to not-for-profit incorporated community
        organisations whose services provide significant benefit to the Noosa community
        (beyond their membership);
     o  demonstrate value for money; and
     o  closely align with Council’s strategic goals and identified key initiatives.
     For the 2016/17 financial year, expressions of interest for this program will be called from
     organisations who offer services in any one of the following areas:
     o     arts and cultural development;
     o     community development;
     o     community safety;
     o     environment;
     o     heritage.

   Water Rebates – This formalises Council’s commitment to fund Unitywater’s fixed water
     and sewerage access charges for eligible, not for profit organisations in the Shire. In
     addition it will also fund the cost of water consumption for these groups up to a maximum of
     $1,000 per annum.

   Building Insurance – This is a new category of support whereby Council covers the cost
     of building insurance for eligible Community Organisations who have facilities on Council
     controlled land. The insurance for these buildings will be incorporated into Council’s Local
     Government Mutual Asset Scheme Industrial Special Risks coverage. The cover will only
     be provided on the terms offered by the LGM to Queensland Councils and is not negotiable
     for individual groups.
     The portion of Council’s annual LGM Assets cover attributable to the participating
     community organisations will be appropriately identified for internal costing purposes.
     Given the significant number and value of Council’s assets already covered by the LGM
     Assets Scheme, adding the participating community groups to the scheme will provide
     them with suitable coverage at reasonable rate. This will ensure that the relevant assets
     are appropriately covered by a reputable insurance scheme and the costs to Council for
     arranging this coverage will be reduced. The LGM Assets Scheme has been established
     for the purpose of benefiting its Local Government members, which provides a level of
     assurance that the cost of coverage is appropriate. This Policy will enable eligible
     community organisations to benefit from that advantage.

   The Community Project Grants, Regional Arts Development Fund (RADF) and Three
     Year Maintenance Grants are retained.

   The revised policy has been expanded to include the Festive Season Grants with slightly
     revised eligibility criteria such that no commercial businesses can apply. This change
     requires the previously adopted Festive Season policy to be repealed.


Implementation

Community Grant Guidelines, including the operational requirements for the application and
distribution of community grants, to ensure compliance with the adopted Policy and relevant
legislative requirements, will be developed by Council staff prior to the next Community Grant
round being advertised.



                                                                                   Page 4 of 47

Section 5

GENERAL COMMITTEE MEETING AGENDA                                               8 FEBRUARY 2016


The 2016/17 Community Grants Programs will be advertised and applications called for as
follows.

Grant Round                       Open date                         Close date
Projects Round One                22 February 2016                  8 April 2016
Projects Round Two                15 August 2016                    30 September 2016
RADF Round One                    22 February 2016                  8 April 2016
RADF Round Two                    15 August 2016                    30 September 2016
Festive Season                    22 February 2016                  8 April 2016
Community Alliance                22 February 2016                  8 April 2016

As Water Rebate and Building Insurance Cover are non-competitive, Council Officers will contact
eligible organisations directly and put in place the necessary arrangements to implement these
programs.

Three Year Maintenance Grants still have a further two years to run.

Previous Council Consideration

Ordinary Meeting Minutes 15 January 2015, Item 16, Page 5
That Council note the report by the Community Development Coordinator to the General
Committee Meeting dated 12 January 2015 and:
A.   Repeal the existing Community Grants Policy and adopt the revised Community Grants
     Policy (Attachment 1) amended by including Chambers of Commerce with Service Clubs
     as eligible for Community Project grants;
B.   Repeal the existing Community Grants Framework and Criteria and adopt the revised
     Community Grants Framework and Criteria (Attachment 2); and
C.   Delegate to the Chief Executive Officer the development of a Festive Season Strategy.

Ordinary Meeting Minutes 7 May 2015, Item 2, Page 11
That Council note the report by the Community Engagement Manager to the Planning &
Organisation Committee Meeting dated 28 April 2015 and:
A.   Repeal the Festive Season Strategy and Minor Grants Program Policy that transferred to
     Noosa Council from the Sunshine Coast Regional Council under the Local Government
     (De-amalgamation Implementation) Regulation 2013; and
B.   Adopt the Noosa Council Festive Season Event Grants Policy (provided at Attachment 1 to
     the report) with the following amendments:
     Eligible Festive Season Events, page 2, dot point 3:
          New Year’s Eve events open to the public.
     Ineligible Expenses, page 3, dot point 4:
          Fireworks other than New Year’s Eve events and Balloons.

Finance & Risk

The allocation of funding for the 2016/17 community grants program will be determined as part of
the budget process. This will included the cost of the water rebates and building insurance cover
as they forms part of Council’s support to community organisations.

Eligibility criteria for organisations applying for grants and rebates are detailed in the Community
Grants Policy.



                                                                                      Page 5 of 47

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                             8 FEBRUARY 2016


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

This report has been developed in consultation with relevant internal stakeholders across various
departments and branches of Noosa Council, including:
    Environmental Services
    Economic Development
    Executive Office
    Community Services
    Property and Facilities
    Financial Services

Departments/Sections Consulted:

x     Chief Executive Officer                x   Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

x     Executive Office                           Planning & Infrastructure
      Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Infrastructure Planning & Design
x     Governance                                 Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                     Page 6 of 47

Section 7

GENERAL COMMITTEE MEETING AGENDA                                              8 FEBRUARY 2016
                                                                                      Attachment 1


                                                                         Council Policy
                                                       COMMUNITY GRANTS
 Corporate Plan Reference:

 Endorsed by Council:

 Policy Author:                              Community Development Coordinator, Community
                                             Services


POLICY BACKGROUND

This Policy is to guide the administration of Council’s Community Grants Program so that the
grants:
    Assist Council to achieve its strategic goals and identified key initiatives; and
    Align with the intent of the Local Government Act 2009 and the Local Government
      Regulation 2012, which state that (community) grants will be used for a purpose that is in
      the public interest.

This Policy is to be read in conjunction with any supporting guidelines for specific funding
programs.

This Policy does not apply to sponsorship, donations, advertising, naming rights and service level
agreements.

POLICY OUTCOMES

The outcomes of this policy include:
   Providing community organisations and individuals* with financial support to meet identified
     community needs;
   Building community skills and resilience;
   Developing and maintaining sustainable community infrastructure;
   Providing opportunities for community organisations to leverage Council’s financial
     assistance to obtain funding from other sources; and
   Providing opportunities for community organisations to deliver on Councils strategic goals
     and identified key initiatives (e.g. Noosa Corporate Plan, Noosa Social Strategy).

WHO CAN APPLY

Not for profit incorporated community organisations can apply for a Community Grant provided
they meet the following criteria:
   The project, event or program for which they are applying, benefits the residents of the
     Noosa Shire community;
   The application meets the specific eligibility criteria of the funding programs as set out in
     this Policy and the supporting Grant Guidelines;




                                                                                    Page 7 of 47

Section 8

GENERAL COMMITTEE MEETING AGENDA                                               8 FEBRUARY 2016


   The organisation:
     o    Is a legal not for profit entity;
     o    Complies with all incorporation requirements of the State and Commonwealth as at
          the closing date for the grant program;
     o    Has appropriate insurances and adheres to sound Workplace Health and Safety
          practices;
     o    Has no debt to Council, or has entered into scheduled payment arrangements with
          Council that is being adhered to; and
     o    Has met acquittal conditions for any previous Council grants
If a community group is not incorporated and wishes to apply for a Grant, the group is able to do
so provided that the application is auspiced and administered by an incorporated not-for-profit
community organisation that is willing and able to accept legal and financial responsibility for the
grant.
Service Clubs are eligible for water rebates and building insurance cover and may apply for
Community Project and Festive Season Grants only.
Chambers of Commerce may apply for Community Project and Festive Season Grants only.
Not for profit community organisations with a liquor-licenced supporters/associated club that
commercially trade seven days a week may apply for Festive Season Grants only.
*Individuals may apply for Regional Arts Development Fund (RADF) only.

WHO CANNOT APPLY

   Commercial businesses and enterprises
   Government agencies or Departments of local, state or federal government
   Educational institutions
   Parents and Friends Associations, or Parents & Citizens Associations
   Medical organisations or Primary Health Care Providers
   Political organisations
   Kindergartens and Pre-school centres
   Religious organisations where the application is for a project that relate specifically to the
     organisation’s core business.

ELIGIBLE PROJECTS, EVENTS OR PROGRAMS

To be eligible to apply for funding, community grant applications must adhere to the terms and
conditions set out in this Policy as well as the supporting Grant Guidelines for that specific
funding program.

COMMUNITY GRANT PROGRAMS

Council’s Community Grants will encompass the following seven funding programs.
1.     Community Project Grants
Applications for Community Project Grants will be accepted twice yearly and successful
applications will be decided in a competitive assessment process based on:
    Demonstrated need for the project;
    Value for money,
    Alignment with Council’s strategic goals and identified key initiatives;
    The quality of the proposed project; and
    The amount of funding allocated in Council’s annual budget for Community Grants.



                                                                                      Page 8 of 47

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                  8 FEBRUARY 2016


Council may determine priority funding areas on a year to year basis and these priorities will be
identified in the Community Project Grant Guidelines.
Community Projects may include, but are not restricted to:
    Community based festivals or events that bring residents together, including cultural,
      sports or community festivals. (Such events may require a Temporary Event Permit from
      Noosa Council);
    One off projects or programs that respond to a specific opportunity or need within the
      Community. These programs may enhance the skills of participants or be pilot projects with
      a community focus;
    Building works or infrastructure projects that include new or replacement infrastructure,
      or the maintenance of existing infrastructure. This may include lighting, shade sails, storage
      facilities, fit-outs etc. (Works may require approvals such as, building approval and property
      owner's consent).
Projects that are ineligible for funding are detailed in the Community Project Guidelines.

2.     Regional Arts Development Fund.
The Regional Arts Development Fund (RADF) is a partnership between the Queensland
Government and Noosa Council to support local arts and culture in regional Queensland.
RADF investment supports local artists and communities to participate in locally determined arts
and cultural priorities, activities and opportunities. Projects receiving a RADF grant will need to
demonstrate how they have met the RADF Key Performance Outcomes (KPOs).
Applications for RADF will be accepted twice yearly and successful applications will be decided
in a competitive assessment process. Council may determine priority funding areas on a year to
year basis and these priorities will be identified in the RADF Guidelines.
Council will require a contribution to the project from the applicant or a third party.

3.     Festive Season Event Grants
Festive Season Event Grants will provide financial assistance for up to three years to not for
profit incorporated community organisations for events that are free to the public and occur
between late November and January each year. Events that can be funded through this program
include Christmas Carols, Concerts, Parades, New Year’s celebrations, and Australia Day
activities within the Noosa Council area.
Council Festive Season Event Grants will contribute to costs associated with:
  Expenses related to hire of equipment, temporary structures, professional services and
    promotion and advertising of the event; and / or
  Traffic management plans including traffic control services.
Funding will be capped and Council will require a contribution to the event from the event
organiser or a third party.

4.     Three Year Community Alliance Agreement

This funding will provide financial support for up to three years to not-for-profit incorporated
community organisations whose services provide significant benefit to the Noosa community
(beyond their membership); demonstrate value for money; and closely align with Council’s
strategic goals and identified key initiatives.




                                                                                          Page 9 of 47

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                 8 FEBRUARY 2016


Council will initially call for expressions of interest for this grants program from organisations who
offer services in one of the following areas:
     Arts and cultural development
     Community development
     Community safety
     Environment
     Heritage.
Successful applicants will need to:
   demonstrate their need for funding
   provide an achievable operational or business plan for the duration of the agreement

Council will establish a formula and a funding cap setting the maximum allowable amount for
individual Three-Year Community Alliance Agreements as part of its annual budget process.

Recipients will be required to provide an annual acquittal (including audited financial statements)
and a progress report demonstrating delivery of agreed outcomes.

The renewal of agreements will be negotiated six months prior to their expiry, following an
invitation to continue with the program being provided by Council.

As part of its annual budget process Council will consider whether or not to invite additional
organisations to be considered for funding under this program.

Recipients of Three-Year Community Alliance Agreements are ineligible for Three Year
Maintenance Agreements.

5.     Three-Year Maintenance Agreements
This funding will provide financial support up to three years to eligible not-for-profit incorporated
community organisations that maintain Council and community infrastructure. There are two
categories:

    Maintenance and management of community halls or centres. Eligible community
      organisations may receive part funding for on-going operational and/or maintenance
      purposes of Council infrastructure only where that infrastructure is publicly accessible.

    Sports field maintenance. Eligible sporting organisations may receive part funding for on-
      going maintenance of sporting fields. The organisations must have primary responsibility
      for fields that are open to the public when not being used by those organisations.

Three-Year Maintenance Agreements operate by invitation-only rather than through a
competitive process.

Recipients will be required to provide an annual acquittal and a progress report demonstrating
delivery of agreed outcomes.

The renewal of agreements will be negotiated six months prior to their expiry, following an
invitation to continue with the program being provided by Council.

Council will establish a formula and a funding cap setting the maximum allowable amount for
individual Three-Year Maintenance Agreements as part of its annual budget process.

Recipients of Three-Year Maintenance Agreements are ineligible for Three Year Community
Alliance Agreements.



                                                                                      Page 10 of 47

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                8 FEBRUARY 2016


6.     Water Rebates

Council will fund Unitywater fixed water and sewerage access charges for all eligible not for profit
organisations as defined in this Policy.

The maximum annual funding for each organisation will be limited to the minimum water and
sewerage access charges (based up to and including 25mm meters) for each land parcel unless
there is a legal requirement or hydrology report that requires the organisation to have a larger
water meter or additional meters.

In addition Council will fund the annual water consumption charges of all eligible not for profit
organisations up to a maximum of $1,000 per annum. Organisations with consumption charges
over $250 per annum will be required to have a Council approved water management plan in
place.

The cost of the water rebate will be identified and funded through the Community Grants
Program as it forms part of Council’s support to community organisations.

7.     Building Insurance Cover

Council will cover the cost of building insurance for eligible not for profit community organisations
(as defined in this policy) with facilities built on Council owned or controlled land.

The insurance provided by Council will be incorporated into Council’s Local Government Mutual
(LGM) Asset Scheme Industrial Special Risks coverage. The cover will only be provided on the
terms offered by the LGM to Noosa Council and is not negotiable for individual groups.

The cost of this insurance will be identified and funded through the Community Grants Program
as it forms part of Councils support to community organisations.

Council may require community groups covered by this scheme to meet excess charges in the
event of any claim.

APPLICATION PROCESS

Community Project, Festive Season Event and RADF grant applications must be submitted by
the advertised closing date and time. Applications received after the closing date and time will
not be accepted.

Applications for Community Project, Festive Season Event and RADF grants must be submitted
on a current Grant Application Form made available by Noosa Council. Applicants must have
spoken with a Council Officer prior to submitting the grant.

There will be an initial call for expressions of interest for the Community Alliance program
following which Council will determine which organisations will be funded through this program.
Thereafter individual applications will be decided annually as part of the budget process on a
case by case basis.

Three-Year Maintenance Agreements operate by invitation-only rather than through a
competitive process.

Water Rebates and Building Insurance Cover will be arranged for eligible recipients and these
organisations will not be required to complete an application form.




                                                                                     Page 11 of 47

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                  8 FEBRUARY 2016


OUT OF ROUND FUNDING

In exceptional circumstances, or cases of significant hardship, Council may consider special one
off funding upon presentation of a business case.

CONDITIONS OF FUNDING

All successful applicants will be required to enter into a funding agreement with Council and
acquit funds within the allocated timeframes. The timeframes and acquittal requirements are
outlined in the supporting Grant Guidelines for the specific funding program.

As a condition of funding, successful applicants will be required to actively and publicly
acknowledge Council’s support.

The level of acknowledgement will be determined by the amount funded and will be outlined in
the funding agreement.

COUNCIL’S ROLES AND RESPONSIBILITIES

Council will publicise the availability of its grants programs widely and in such a way as to
promote public confidence in the process.

In assessing the grants, Council will:
    Ensure public monies are allocated in a fair and equitable way;
    Ensure best possible value for money;
    Check each application against eligibility criteria and particular assessment criteria, as set
      out in the appropriate Grant Guidelines; and
    Seek recommendations from an expert panel that can comprise Council officers,
      Councillors and/or community representatives.

Council will determine the total allocation of funds to the community grants program through its
annual budgetary processes.

The number and types of grants approved by Council will depend on the demand for funding, the
available program budget and corporate priorities. In some instances, part funding may be
offered.

Funding priorities for individual grant programs will be regularly reviewed to ensure their
relevance and they continue to meet Council objectives.

Council officers are available to provide advice to community organisations and help develop
Council grant applications. They will also assist organisations to identify additional and alternative
sources of funding relevant to their project or event.

Council officers and Councillors are responsible for recognising and declaring any actual or
potential conflicts of interest. This may include, but is not limited to, personal connections with the
applicant. Anyone having a determined conflict of interest should not debate or be involved in any
discussions on any matter relating to that application.




                                                                                       Page 12 of 47

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                  8 FEBRUARY 2016


Council officers are required to adhere to this policy when supporting, facilitating, or delivering
grants-related activities. It is the responsibility of Council officers to ensure that grants and
funding provided from public monies are:
    Administered transparently and accountably;
    Align with Council’s objectives, goals and priorities;
    Effectively advertised and promoted to the community so that all potential applicants have
      equal opportunity to apply for funds; and
    Monitored for compliance against set performance measures.

Final decisions in the Community Grants Program are made by the Council, CEO or delegate.

RELEVANT DOCUMENTS

    Noosa Council Corporate Plan
    Noosa Social Strategy.

RELEVANT LEGISLATION

Queensland Government
  Local Government Regulation (2012)
  Local Government Act (2009)
  Statutory Bodies Financial Arrangements Act (1982).

DEFINITIONS

Acquittal
This is the process by which a recipient demonstrates in writing to the funding body that it has
expended the funds in accordance with the terms and conditions of the funding agreement on
completion of the activity or project.

The acquittal process, when conducted correctly, demonstrates that these monies were being
used efficiently, effectively or that the community is getting value for money for services.

Auspice
Auspice means that an organisation takes responsibility for ensuring the funds are used as
specified in the grant allocation. An auspicing organisation will be responsible for:
    Sign off on the funding agreement;
    The receipt, banking and administration of all monies;
    Project monitoring and completion;
    Ensuring the applicant acquits the funding on time; and
    Sign off on the acquittal form.

Business
For the purpose of this policy, business is defined as an organisation or enterprising entity
engaged in commercial, industrial or professional activities for profit.

Community
For the purpose of this policy, community refers to a group of people living within the Noosa
Shire local government boundaries.

Conflict of Interest
A conflict of interest is a conflict between an officer’s or councillor’s personal interests (including
personal interests arising from their relationships or club memberships, for example); and the
public interest that might lead to a decision that is contrary to the public interest.


                                                                                       Page 13 of 47

Section 14

GENERAL COMMITTEE MEETING AGENDA                                               8 FEBRUARY 2016


Donations
Donations are defined as a voluntary gift of product, service or cash without expectation of return.

Funding Agreement
A legal agreement entered into by the successful applicant and Council noting the obligations of
both parties.

Grant
Funds provided to a recipient through a formal program for a specified purpose, directed at
achieving goals and objectives consistent with Council policy, where the recipient is selected on
merit against a set of criteria. Funding is subject to entering a written agreement with Council
that outlines accountability requirements.

Grant Guidelines
The grant guidelines will include:
   Aim of the grant
   Criteria
   Assessment information
   How to apply
   How to acquit
   Terms and Conditions
   Glossary.

Individuals
Individuals are classified as a singular person or couple, as distinguished from a group, who
carry on activities for a community purpose and benefit.

Incorporated Organisations
For the purposes of this Policy the term Incorporated Organisations means:
    Incorporated Associations (incorporated under state legislation, commonly have
      ‘Association’ or ‘Incorporated’ or ‘Inc.’ in their legal name);
    Incorporated Cooperatives (also incorporated under state legislation, commonly have
      ‘Cooperative’ in their legal name);
    Companies (incorporated under the Corporations Act 2001 – may be proprietary company
      (limited by shares or by guarantee) or public companies); and
    Aboriginal Corporations (incorporated under the Corporations (Aboriginal and Torres Strait
      Islander) Act 2006)

Naming Rights
The right to name property, either tangible property or an event, usually granted in exchange for
financial consideration.

Not for profit community organisation
A community organisation that operates as an incorporated organisation (as defined above)with
a primary purpose of providing services to the community and is not carried on for the direct or
indirect profit or gain of its members, both in its operations and winding up.

Public Interest
For the purpose of this policy, public interest refers to ‘the welfare of the general public in
contrast to the interest of an individual or group’.




                                                                                     Page 14 of 47

Section 15

GENERAL COMMITTEE MEETING AGENDA                                              8 FEBRUARY 2016


Service Level Agreements
Service Level Agreements are a formally negotiated agreement between Council and an
organisation, individual or community group which details the nature, quality and scope of a
service to be provided. The purpose of a service level agreement is to formalise the services of a
provider and outline the responsibilities of both Council and the provider in the provision of a
defined service.

Sponsorship
Sponsorship is a contractual business arrangement under which a sponsor, for a specified term,
provides a contribution in cash and/ or in kind (“contra”) in return for specified commercial
benefits.

Transparency
Transparency refers to the openness with which the administration of funds and obligations
between entities are discharged.




Version control:
 Version   Reason/ Trigger                   Change     Endorsed/ Reviewed by     Date
                                             (Y/N)
 1.0        New Policy                       N          Noosa Council             3 April 2014
 2.0        Policy review after 2 grant      Y          Noosa Council             15 January
            rounds                                                                2015
 3.0        Policy review after completion   Y          Noosa Council             11 February
            of 2015/16 grant rounds                                               2016




                                                                                   Page 15 of 47

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                                     8 FEBRUARY 2016


2                            JANUARY 2016 YEAR TO DATE (YTD) COUNCIL FINANCIAL PERFORMANCE
OCUMENT INFORM AT ION




Author                               Manager Financial Services, Wayne Jensen
                                     Corporate Services Department

Index                                ECM / Subject / 22.09 – Monthly Financial Performance Report

Attachments                          1.       Statement of Comprehensive Income
                                     2.       Statement of Financial Position


EXECUTIVE SUMMARY
Year to date financial performance to 31 January 2016 is generally in accordance with budget
forecasts. Budgets have been reviewed utilising the December YTD revenue and expenditure
actuals to determine whether budget forecasts require change, and to also incorporate recent
Council decisions that impact on the budget, with proposed changes included in a separate
report to this meeting. Note that the proposed December Quarter adjustments will not be
reflected in the budget reports until they have been adopted by Council.

         YTD Financial Performance Summary to 31 January 2016
                                 Current YTD Actual      Variance                         Variance     Status
                                     YTD          $m           $m                             YTD
                                 Budget                                                         %
                                      $m
         Recurrent Revenue          $78.1      $79.7          $1.6                           2.1%     On track
         Recurrent Expense          $49.6      $46.8          $2.8                           5.6%     On track

         Net Capital Revenue                         $2.3        $4.1           $1.8         178%     On track
         Capital Expenditure                        $13.1       $13.2           $0.1          0.7%    On track

Financial statements including Statement of Comprehensive Income and Statement of Financial
Position are included as attachments for information of Council.

Figure 1: Actual Performance Compared to YTD Budget
               $90
               $80
               $70
               $60
               $50
               $40
               $30
               $20
               $10
                        $-
                                    YTD Budget ($m)                     YTD Actual ($m)

                                          Operating Revenue   Operating Expenditure




                                                                                                         Page 16 of 47

Section 17

GENERAL COMMITTEE MEETING AGENDA                                              8 FEBRUARY 2016


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 8 February 2016 providing the January YTD financial performance report for the
2015/16 financial year.


REPORT
Recurrent Revenue (YTD Benchmark 58%)

Council has received 91% ($79.7 million) of its recurrent revenue budget of $87.5 million as at
the end of January 2016. Based on current projects Council will achieve its budgeted revenue
targets. Commentary on each recurrent revenue type is provided below:

      Rates and Levies – $61.4m (102%) of the annual budget of $60.5m has been recorded
        following the January issue of rate notices. Whilst general rate revenue is slightly below
        forecast levels, waste collection charges received are above budget. The impact of
        discounts to be applied to general rate revenue in February will reduce the total rate
        revenue collected by approximately $800k.
      Fees and Charges – Fees and charges earned ($4.9m) totals 84% of the full year forecast.
        Favourable variances exist for cemetery operations, parking, and development related
        fees, with adjustments proposed as part of the December quarter budget review.
      Interest Received – Currently 4.2% above forecast levels due to higher cash balances than
        originally estimated. No adjustments to the year-end forecast have been proposed at this
        stage, but will be monitored for possible amendment at the March quarter budget review.
      Dividend and Tax – Dividends and the payment of tax equivalent from Unitywater are in
        line with budget forecasts.
      Other Revenue – areas including waste fees are marginally above budget predictions, with
        sale of recyclable materials (particularly scrap metal) currently below forecasts. All
        variances will continue to be monitored to determine whether adjustments should be made
        as part of the next budget review.
      Grants and Subsidies – Overall receipts for operational grants are generally in accordance
        with adjustments to the revised budget forecast proposed to account for variances due to
        additional funding received not previously recognised.

Figure 2: Recurrent Revenue Position by Type (Excluding Rates)
 $7.0

 $6.0
                                   YTD Budget ($m)
 $5.0                              YTD Actual ($m)

 $4.0

 $3.0

 $2.0

 $1.0

 $0.0
                                                         Other
              Fees




                                                                    Grants
                        Dividend




                                                Tax
                                     Interest




                                                                                   Page 17 of 47

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                            8 FEBRUARY 2016


Recurrent Expenditure (YTD Benchmark 58%)

Operating expenditure is currently 54% of the full year budget forecast. Based on current
expenditure patterns Council will keep its expenditure for the full year within budget. Areas with
current YTD material variances will continue to be monitored to ensure that timing variances are
minimised, and for possible adjustments to be made in the March quarter budget review
(although some items have been addressed as part of the December quarter budget review).
Further commentary appears below.

        Employee Costs – Actuals of $15.7m against the YTD budget of $16.3m and equates to
          46% of the full year budget. YTD variances can be attributed in part to the capitalisation of
          Civil Operations staff salaries (where capital works are being performed in house) as well
          as higher rates of capitalisation of planning and design staff costs than budgeted, training
          costs underspent compared to YTD budget, and positive YTD variances for the aquatic
          centre and Noosa community Support.
        Materials and Services – 50% of the full year budget ($19.8m) has been expended
          compared to the YTD budget of $22.0m. Variances generally relate to under expenditure in
          contract services, maintenance and special levies. As with employee costs, all variances
          are subject to ongoing scrutiny.
        Finance Costs – generally in accordance with budget.
        Depreciation expenses are currently running in accordance with budget forecasts.
        Other Expenses – generally in accordance with budget.

Figure 3: Recurrent Expenditure Position by Type

 $25


 $20                                                       YTD Budget ($m)
                                                           YTD Actual ($m)
 $15


 $10


     $5


     $0
                              Materials




                                           Finance Costs




                                                                     Depreciation
                Employees




                                                                                    Other




Capital Revenue

YTD revenue received includes $2.2 million of developer cash contributions (full year budget $1.6
million), together with $1.9 million received for transport infrastructure capital grant funding.
Adjustments were proposed following the December quarter budget review to account for Council
receiving additional grant funding towards capital works and the higher than anticipated
contributions received from developers.




                                                                                               Page 18 of 47

Section 19

GENERAL COMMITTEE MEETING AGENDA                                               8 FEBRUARY 2016


Capital Works Program

Actual capital expenditure (excluding commitments) is $13.2 million against the current full-year
budget of $32.4 million. It is noted that the program is proposed to increase to $35.6m following
the December quarter budget review, with the most significant variation relating to the $2.8m
purchase of environmental land at Lake Cooroibah (as per Council resolution in November
2015). Committed expenditure totals a further $10.5 million bringing the total of actual and
committed funds to $23.7 million (67.2% of the total program once adjusted to account for the
land purchase). Detailed discussion of progress in the delivery of the capital works program is
provided quarterly to the Infrastructure and Services Committee.

Cash Management and Investment Performance

Council funds are invested in accordance with the adopted Investment Policy. Total cash on
hand as at 31 January 2016 was $59.7 million. The cash balance includes constrained funding
carried forward for capital projects still under construction, plus unspent funds from special rates
and levies.

Council’s investment portfolio is balanced across a number of agencies, as shown in the graph
on the left. The graph on the right shows the current risk profile using industry credit ratings.

                Bendigo
                  7%
                                                                        A2
                                                                  A1    7%
                 Suncorp                                         13%
      Westpac                                                                       A1+
                  13%              QTC
       0%                                                                          (QTC)
                                   46%
                NAB                                                                 46%
                13%
                                                                  A1+
                                                                 (Other)
                      CBA                                         34%
                      21%



The actual interest revenue for the month was $133,461 with a weighted average yield of 2.73%
against the industry benchmark (Bloomberg AusBond Bank Bill Index) of 2.35%.


Previous Council Consideration

Nil

Finance & Risk

Monthly financial performance is monitored across all operational areas to ensure Council’s
forecast operating result is achieved.




                                                                                     Page 19 of 47

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                             8 FEBRUARY 2016


Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

x     Chief Executive Officer                x   Community Services                 x   Corporate Services
      Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
      Executive Support                          Community Development                  ICT
                                                 Libraries & Galleries                  Procurement & Fleet
                                                 Local Laws                             Property & Facilities
                                                 Waste & Environmental Health           Revenue Services

x     Executive Office                       x   Planning & Infrastructure
      Community Engagement                       Building & Plumbing Services
      Customer Service                           Civil Operations
      Economic Development                       Infrastructure Planning & Design
      Governance                                 Planning & Environment
      Human Resources                            Strategic Land Use Planning
      Sustainability




                                                                                                    Page 20 of 47

Section 21

GENERAL COMMITTEE MEETING AGENDA   8 FEBRUARY 2016


                                       Attachment 1




                                      Page 21 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                        8 FEBRUARY 2016

                                                                                                                Attachment 1
    Noosa Council
    Statement of Comprehensive Income
    For the Year Ended 30 June 2016
    As at 31-Jan-2016
                                                           Current               Current
                                                             Budget              Budget             Actual             Percentage
                                                              2016               YTD                  YTD             Annual Budget
                                                                $                   $                   $                   %

    Revenue
          Recurrent Revenue
          Rates, levies and charges                            60,463,174          61,128,174          61,445,318               102%
          Fees and charges                                      4,738,448           3,582,617           3,977,424                84%
          Dividend income                                       1,925,140             962,570             962,612                50%
          Interest received                                     4,568,059           2,470,965           2,576,164                56%
          Tax equivalents                                       1,088,812             583,278             646,472                59%
          Sale of Goods and Major Services                      7,408,961           4,560,698           4,730,147                64%
          Sale of Contract & Recoverable Works                     15,364               8,962              (8,358)               -54%
          Rental & Lease Income                                 1,173,953             688,304             749,201                64%
          Other income                                            709,908             431,150             632,738                89%
          Grants, subsidies, contributions and donations        5,483,370           3,669,617           3,992,777                73%
                                                               87,575,189          78,086,336          79,704,493                91%
    Expenses
          Recurrent Expenses
          Employee benefits                                    27,646,928          16,337,131          15,728,151                57%
          Materials and services                               39,401,146          21,988,897          19,796,258                50%
          Finance costs                                         2,686,315           1,552,434           1,549,491                58%
          Depreciation and amortisation                        16,630,163           9,700,928           9,710,124                58%
          Other expenses                                          105,993              51,900              56,513                53%
                                                               86,470,545          49,631,290          46,840,537                54%

    Operating Result                                            1,104,644          28,455,046          32,863,955
    Capital Revenue
          Capital contributions and donations                   1,606,029           1,287,043           2,217,633               138%
          Grants, subsidies, contributions and donations        2,791,696           1,035,516           1,973,404                ™1%
          Other capital revenue                                         -                   -                   -
    Total Capital Revenue                                       4,397,725           2,322,559           4,191,037

                                                                                                                Page 21 of 47

Section 22

GENERAL COMMITTEE MEETING AGENDA   8 FEBRUARY 2016


                                      Attachment 2




                                      Page 22 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                      8 FEBRUARY 2016

                                                                                                             Attachment 2

    Current Assets
         Cash and cash equivalents                                     36,759,172              56,660,234               50,891,174
         Trade and other receivables                                    8,072,958              34,542,546                5,794,388
          Inventories                                                     104,038                 205,271                  104,038
         Other current assets                                             657,006                1,344,443               3,097,262
                                                                       45,593,174              92,752,494               59,886,862
          Non Current Assets held for sale                                       -                       -                       -
    Total Current Assets                                               45,593,174              92,752,494               59,886,862
    Non Current Assets
         Trade and other receivables                                   49,217,517              49,217,517               49,217,517
         Other non current Assets                                                -                       -                       -
          Investments                                                  60,978,225             60,978,425                60,978,225
          Investment property                                           3,831,234                3,831,234               3,831,234
          Property, plant and equipment                               924,908,040             890,393,327             887,078,579
          Intangible assets                                             2,873,146                2,595,779               2,701,457
    Total Non Current Assets                                        1,041,808,162            1,007,016,282           1,003,807,012
    Total Assets                                                    1,087,401,336            1,099,768,776           1,063,693,873
    Current Liabilities
         Trade and other payables                                       4,316,797              10,435,566                8,100,894
         Borrowings                                                     2,854,619                1,540,381               2,633,065
          Provisions                                                    5,013,310                8,782,069               4,114,390
         Other                                                            380,497              (5,730,093)               1,082,497
    Total Current Liabilities                                          12,565,223              15,027,923               15,930,845
    Non Current Liabilities
         Trade and other payables                                                -                       -                       -
         Borrowings                                                    35,247,498              36,747,480               36,747,480
          Provisions                                                    8,210,644               8,194,924                8,194,924
    Total Non Current Liabilities                                      43,458,142             44,942,404                44,942,404
    Total Liabilities                                                  56,023,365              59,970,327               60,873,249
    Net Community Assets                                            1,031,377,971            1,039,798,448           1,002,820,624

    Community Equity
         Asset Revaluation Surplus                                     36,519,656              14,334,106               14,334,106
          Retained Surplus / (Defeciency)                                        -                       -                       -
         Shire Capital                                               994,858,315              988,486,518             973,851,849
         Current Year Net Earnings                                               -             36,977,824               14,634,670
    Total Community Equity                                          1,031,377,971            1,039,798,448           1,002,820,625

                                                                                                              Page 22 of 47

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                              8 FEBRUARY 2016


3                       DECEMBER QUARTER BUDGET REVIEW
OCUMENT INFORM AT ION




Author                             Manager Financial Services, Wayne Jensen
                                   Corporate Services Department

Index                              ECM/Subject/ 7.09 – 2015/2016 Budget

Attachments                        1.    Proposed Budget Adjustments – operating and capital
                                   2.    Revised Budget Financial Statements


EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned
activities to be funded through the budget period. Consequently, a review of all activities has
been undertaken using income and expenditure figures as at the end of December 2015.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 8 February 2016 and approve the requested changes to the budget for the
2015/16 financial year, as outlined in Attachments 1 and 2 to the Report.


REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year. As such, formal reviews have been
scheduled to be undertaken following the close of each quarter (July to September; October to
December; January to March), using year-to-date figures as the basis for any revised forecasts.
This review also provides an opportunity to take account of any additional information that has
come to light since the adoption of the original budget to ensure the most accurate figures are
included.
The Revised Budget Financial Statements clearly identify statement line items that have been
affected by the proposed adjustments.
Key considerations for any budget adjustments include:
                      All increases in operating expenditure should be funded. If variances cannot be funded at
                        the branch or departmental level, then operational savings, determined after collaboration
                        with other departments, should be identified to ensure no degradation in the overall
                        operating position for Council.
                      Proposed reallocation of savings or additional revenue will be confirmed by the leadership
                        team based on business risk assessment.
                      The business capacity to deliver the adopted works program should be considered as part
                        of the evaluation process for all projects.

1.                      Operating Budget Adjustments

There have been a number of proposed adjustments to the operating budget. Requests for
additional expenditure have not impacted Council’s operating position as they have been funded
with savings in other expenses or through additional revenue, apart from a recent decision of
Council relating to advance funding for the Noosa Biosphere Reserve Foundation Ltd (which is
funded via restricted cash held in the Environment Levy reserve).

                                                                                                   Page 23 of 47

Section 24

GENERAL COMMITTEE MEETING AGENDA                                              8 FEBRUARY 2016


Key elements include:

    Fees and charges – minor changes reflect increased activity levels beyond what was
      originally proposed for development and building areas.
    Grants and subsidies – operating – recognition of additional grant revenue received (offset
      by expenditure) for Noosa Community Support, library programs, disaster recovery and
      community development.
    Other recurrent income – minor adjustments based on actual performance from the second
      quarter.
    Employee benefits – reallocations between cost centres to move budgets to where
      operational activities are occurring; and minor adjustments to forecast based on actual
      performance from the first and second quarter.
    Materials and services – additional expenditure to reflect grants and Council resolutions
      since adoption of the original budget. Significant changes relate to the $360k contribution
      for environmental grants through Noosa Biosphere Reserve Foundation Ltd; and $150k for
      specialised external assistance to undertake condition assessments for Council buildings
      that will inform future asset maintenance and renewal budgets.

2.    Capital Works Program Adjustments

There have been a number of adjustments to the capital works program to reflect recent Council
resolutions and variations across different programs. Details for changes to each program are
outlined in the Attachments. The total program has increased to $35.6 million, with the most
significant change being to account for the strategic acquisition of environmental land, which was
subject to a separate report to Council in November. The majority of adjustments relate to the
reallocation of funding from the emergent renewals provision to specific capital projects, and to
also recognise Council’s co-contribution towards state government grants received for pathway
and cycleway upgrades.

Previous Council Consideration

The budget was amended in November 2015 to account for adjustments identified from the
September quarter.

Finance & Risk

There has been a reduction to the operating result of the proposed budget review, but overall
Council is still forecasting a surplus of $882k.

Apart from the purchase of environmental land, which was funded from the Environment Levy,
changes to the capital program are largely funded through the rescheduling of projects, additional
grant revenue received, and redirection from the Emergent Works allocation. Capital program
changes do not impact the operating position, though the forecast cash position is marginally
reduced.

All financial sustainability ratios remain within (or exceed) target ranges, as outlined in the
attached Budget Financial Statements.


Consultation

External Consultation - Community & Stakeholder

Nil



                                                                                   Page 24 of 47

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                           8 FEBRUARY 2016


Internal Consultation

All areas of Council have been consulted in undertaking this review.

Departments/Sections Consulted:

X   Chief Executive Officer                X   Community Services                 X   Corporate Services
    Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
    Executive Support                          Community Development                  ICT
                                               Libraries & Galleries                  Procurement & Fleet
                                               Local Laws                             Property & Facilities
                                               Waste & Environmental Health           Revenue Services

X   Executive Office                       X   Planning & Infrastructure
    Community Engagement                       Building & Plumbing Services
    Customer Service                           Civil Operations
    Economic Development                       Infrastructure Planning & Design
    Governance                                 Planning & Environment
    Human Resources                            Strategic Land Use Planning
    Sustainability




                                                                                                  Page 25 of 47

Section 26

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 26 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                             8 FEBRUARY 2016

      Budget Review 3 - December Quarter Review 2015/16
      Summary   of Submissions Received                                                                                   -$   1,723,311.04 -$   1,858,325.39  $     212,639.40 -$   1,510,671.64
      tila lel       eleTer Tata          Tele g]               Cost Centre / Project           Pee eC Cutg               2015/16 Current  Pi Ea WCE          Proposed           Proposed New      Capital / Operating      Revenue / Expense      Funding Source       Council Resolution /      Council Contact     Comments
                                                                Description                         Description           Budget                              =] ele Tehg        Budget                                                                                 ete e le aaa)
                                                                                                                                                                  CR retars
      cso0o1         Community Services   Community Facilities  Noosa Aquatic Centre            Materials & Services             $61,172.00        $14,537.00        $15,000.00         $76,172.00 Operating                Expense                Rates                Leadership team             Ash Saward        Conduct detailed inspection and condition
                                                                                                                                                                                                                                                                        backlog projects                              audit of NAC pool plant.

     'cs001          Community Services   Director Community    Director Community              Materials & Services                                                 ee   a
                                                                                                                                 $10,000.00             $0.00        ($5,000.00)         $5,000.00 Operating                Expense                Offset               Leadership team              Fox Rogers       Contributing towards the cost of conducting
                                          Services              Services                                                                                                                                                                                                backlog projects                              the detailed inspection and condition
                                                                                                                                                                                                                                                                                                                      assessment of the NAC pool plant, as
                                                                                                                                                                                                                                                                                                                      approved via the Leadership Team backlog
                                                                                                                                                                                                                                                                                                                     _projects process.
      cso02          Community Services   Community Facilities Respite Centre                   Materials & Services                                 1,662.00 $ 26,000.00              $26,000.00 Operating                Expense                 Other                                            Ash Saward        Purchase of outdoor and indoor blinds, indoor
                                                                                                                                                                                                                                                                                                                      and outdoor furniture, autoclave for
                                                                                                                                                                                                                                                                                                                      sterilization of pedicure equipment, assorted
                                                                                                                                                                                                                                                                                                                      kitchen appliances and a new fridge. All to be
                                                                                                                                                                                                                                                                                                                      funded from NCS reserve account.

     _               Community Services   Community Facilities  Respite Centre                  Materials & Services                                           $       4,000.00          $4,000.00 Operating                Expense                Other                                            Ash Saward        Purchase of six iPads for use in the
                                                                                                                                                                                                                                                                                                                      Broadband for Seniors program. Funding to
                                                                                                                                                                                                                                                                                                                      come from NCS reserve account.
      CS003          Community Services   Community Facilities  Noosa Leisure Centre             Employee Benefits         $    315,661.00         128,661.00 -$       7,250.00        $308,411.00 Operating                Expense                Offset                                           Ash Saward        Transfer of budget from casual labour to
                                                                                                                                                                                                                                                                                                                      contract services for group fitness instructors
                                                                                                                                                                                                                                                                                                                      due to a shift away from employees towards
                                                                                                                                                                                                                                                                                                                     contractors. _
     r               Community Services   Community Facilities                                                             $      35,280.00         21,265.00 $       7,250.00          $42,530.00 Operating                Expense                                                                Ash Saward         Transfer of budget from casual labour to
      CS003                                                     Noosa Leisure Centre            Materials & Services                                                                                                                               Offset
                                                                                                                                                                                                                                                                                                                      contract services for group fitness instructors
                                                                                                                                                                                                                                                                                                                      due to a shift away from employees towards
                                                                                                                                                                                                                                                                                                                      contractors.
                                                                                                                                                   202,244.00 -$     11,262.00,     ($402,290.00) Operating
                                                                                                                                                                      orresmenears
      cso004         Community Services   Community Facilities  Respite Centre              Grants, subsidies - Operating $     391,028.00  -$                                                                              Revenue                Grant                                            Ash Saward        Increase in state government under 65's
                                                                                                                                                                                                                                                                                                                      respite care as a result of an annual
                                                                                                                                                                                                                                                                                                                      indexation increase of 2.88%. Contract
                                                                                                                                                                                                                                                                                                                      services expenses will be increased
                                                                                                                                                                                                                                                                                                                      accordingly to result in a zero net budget
                                                                                                                                                                                                                                                                                                                      change.
      cso04          Community Services   Community Facilities  Respite Centre              Grants, subsidies - Operating $    1,828,130.00 -$     618,679.00 -§      27,904.00 -($1,856,034.00) Operating                  Revenue                Grant                                            Ash Saward        Increase in federal government's over 65's
                                                                                                                                                                                                                                                                                                                      respite care as a result of a new funding
                                                                                                                                                                                                                                                                                                                      agreement. Contract services expenses will
                                                                                                                                                                                                                                                                                                                      be increased accordingly to result in a zero
                                                                                                                                                                                                                                                                                                                      net budget change.
     'cS004          Community Services   Community Facilities  Respite Centre                  Materials & Services       $    272,218.00         161,516.00 $       39,166.00        $311,384.00 Operating                Expense                Grant                                            Ash Saward        Combined increase of $11,262 from state
                                                                                                                                                                                                                                                                                                                      funding and $27,904 from federal funding
                                                                                                                                                                                                                                                                                                                      increases, as per previous listed items.
                                                                                                                                                                                                                                                                                                                      Increase in expenditure results in zero net
     }                                                                                                                                                                                                                                                                                                                budget movement.
     —               Community Services   Libraries and Galleries Library Program and           Materials & Services             $46,410.00             $0.00|     ($46,410.00)              $0.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
     ‘C8005          Community Services   Libraries and Galleries Library Program and            Employee Benefits               $30,000.00             $0.00        $28,310.00         $58,310.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
     ‘CS005          Community Services   Libraries and Galleries Library Program and           Materials & Services                  $0.00             $0.00          - $800.00           $800.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
     |                                                          Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
      Cso0s          Community Services   Libraries and Galleries Library Program and           Materials & Services                $439.00           $388.62 ‘$1,200.00                 $1,639.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
      —              Community Services   Libraries and Galleries Library Program and           Materials & Services              $3,000.00         $2,800.00          $5,400.00         $8,400.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
      CSo0s          Community Services   Libraries and Galleries Library Program and           Materials & Services                  $0.00           $390.00           $900.00            $900.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
                     Community Services   Libraries and Galleries Library Program and           Materials & Services                  $0.00             $0.00        $1,500.00           $1,500.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
     ‘CS005          Community Services   Libraries and Galleries Library Program and           Materials & Services              $6,000.00            $16.36 |        $4,800.00        $10,800.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
     joe             Community Services   Libraries and Galleries Library Program and           Materials & Services                  $0.00             $0.00           $300.00            $300.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
      CSo0s          Community Services   Libraries and Galleries Library Program and           Materials & Services                  $0.00             $0.00           $200.00            $200.00 Operating                Expense                Offset                                             Mel Tong        Best Start literacy project first five forever -
                                                                Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
     /CS005          Community Services   Libraries and Galleries Library Program and           Materials & Services                  $0.00             $0.00          $3,000.00.        $3,000.00 Operating               ‘Expense                Offset                                             Mel Tong      - Best Start literacy project first five forever -
     |                                                          Services / Best Start Family                                                                                                                                                                                                                          reallocate budget to project natural accounts
                                                                Literacy
     ‘CS006          Community Services   Community            Active Mums Program          Grants, subsidies - Operating             $0.00      ($10,050.00)      4810,050.00)       -($10,050.00) Operating               Revenue                Grant                                           Alison Hamblin     Grant funding for Get Out Get Active Program
                                          Development                                                                                                                                                                                                                                                                 - Active Mums as supported by CEO

                                                                                                                                   Page 26 of 47

Section 27

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 27 of 47

oO
                  fu

                        Sot
            ee          <3                                                                |=
                                                                                          aw
            So          se
            os          oO»                  5 2
            -~ D                                      aL       o 2                                                    $  3
                                                      @c
            Se                                                               ee           if
                                                                                                                       no
                                                                                                                     cer
                        £3                                                   oo                                      So Sic
                                                                                                                     aA2aq
            a           ot                                                                &                           =~ 8x
              se                                                                          Ss
            SE          BE                            oe                oe
                                                                        38                                           qo350
            noo         qa                            za                za            gc  2                            fo8

                                                                                      a                                     2
                                                                                 =                                         Ee
                                                                                      o   @
                                                                                 =    =   =                                =

                                                                                      ~   -        ood                     ~
                                                                                 eo}  °   °        8        g    3   2   3 g
                                                                                                                 °

                                                                                  3   3   3                  3   3    o  3
                                                                                 8    3   8                  3   8
                                                                                          | 5
                                                                                 Ww   Ww  Ww                     Ww  a  Ww Ww

                                                                                          3
                        oO
                                    =                                                     8s                         s  8
                                    kK                         8                          3            3
                                    3                                                                                3 ©

            &     8     8     8                                     8                     8   8        8    8        2  .
                                                          }                                                             8  8
      mo                      3                       8    oO           oOo                   ‘Re      3     tT         s
        oO                                            nN  Tee           oO                             4                oo
      ry =                                                                                                       a    T+ | <<
        aA

                                    \%  i?        a                [:            a                                      i2 a
                                                      Fess
                                                                                          8

                                                                                 A        A                                A

                        So

                                                          A                      A    A   aA                     A

            eS                           eS                                      Se       3
                                                                                          a”
                                                                                          (8       re)
                                                                                          &         x

                                                                                          =

                                    os       os       3s   —   os        3s  3s
                                                                                 oS   oS  oS   oS  oS   oS  «aS  oS  S323
                                    a -      a -      a    a - a -      a +  a + oo”  on” oD”       no” nD” oD”  oD”       = 3
                        | a                  Eo            Eo  —£o      Eo   Eo  £ oO —o  Eo        Eo  Eo  £ o  — oa
                                                        :                        Lon k   23s    Sou        vis         aga
                                                                                                    82  822    Bes
                                                                                                                    UGS
                                                                                                                       Geo
                                    ag       awn           ao  ao       awn              Cag   ag  ag    GE     CaG        ag
                                                                                 ageaag                             fagagd
                                             28         8      28                           ga     2ge         Qe 8 tase 8
                                    28                     28                    28228         ego      28228
                                          Le          Pee:                    ec         cif >            Se
                                    fee   2ecefe   ec   —   2ecif&ec    Sec      f&eecke       ge         ec                £2
                                    Soe   o2802    oo       o28 60      2o2H800          ooo              ©2856
                                                                                 HOOLGG            Soe          ©solHogsd
                                    AoW      ae         NL AONL AHL    w         jAOUWIDN                      LIne ATHAI0
                                          Ow       Ow                   AMNUwiAdWL       LiAnw  Ow   Ow  OuisA4n

                                                                                          o                          &  8
                  >o
                                                                                          ©

            oa    oa    oa

                                                                                          3
                                                                                          |e
                                                                                          iz       iF                2 2
                                                                                          }o

            Oo

                                                                                 o        co
                                                                                                   no)
aw                                                    3                          3        8        6        8              3

Section 28

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 28 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                        8 FEBRUARY 2016

     Budget Review 3 - December Quarter Review 2015/16
     Summa     of Submissions Received                                                                                 -$  1,723,311.04 -$   1,858,325.39_ $    212,639.40 -$   1,510,671.64
      ioe           eleyer Tatil ala     Branch               Cost Centre / Project          Earle                     2015/16 Current  2015/16 Actuals   Proposed          Proposed New      Capital / Operating     le ola}                Funding Source      Council Resolution /     Council Contact    ere Tay
                                                              Description                        Description           Budget                             Budget            Budget                                                                               eel eT aed
                                                                                                                                                             UR ag
     csoo9          Community Services   Libraries and Galleries Library Programs &           Materials & Services                                         $        500.00           $500.00 Operating               Expense                 Offset                                           Mel Tong       QLD Week 2016. New budget allocation to
                                                              Services/QLD Week 2016                                                                                                                                                                                                                         natural accounts
                    Community Services   Libraries and Galleries Library Programs &                                                                       _                         $550.00 Operating                Expense                                                                  Mel Tong       QLD Week 2016. New budget allocation to
     csoo9                                                                                    Materials & Services                                    ne   $                                                                                 Offset
                                                              Services/QLD Week 2016                                                                                             soni                                                                                                                        natural accounts
     CS010          Community Services   Libraries and Galleries Library Programs &       Grants, subsidies - Operating                 -$      16,980.00 -$     16,980.00      -($16,980.00) Operating               Revenue                Offset                                           Mel Tong       Tech Savy Seniors. New budget allocation to
                                                              Services/Tech Savy                                                                                                                                                                                                                             natural accounts
                                                              Seniors
     CS010          Community Services   Libraries and Galleries Library Programs &           Employee Benefits                                            $     11,780.00         $11,780.00 Operating               Expense                Offset                                           Mel Tong       Tech Savy Seniors. New budget allocation to
                                                              Services/Tech Savy                                                                                                                                                                                                                             natural accounts
                                                              Seniors
     CS010          Community Services   Libraries and Galleries Library Programs &           Materials & Services                                    s    $      5,200.00.         $5,200.00 Operating               Expense                Offset                                           Mel Tong       Tech Savy Seniors. New budget allocation to
                                                              Services/Tech Savy                                                                                                                                                                                                                             natural accounts
                                                              Seniors
     cso11          Community Services   Waste and           Wild Dog Trapping                Materials & Services                                    2    $     39,000.00        $39,000 .00 Operating              Expense                 Rates              “ISCM 1 November 215       Wayne Schafer     Council agreed to conduct a trial wild dog
                                         Environmental Health Program                                                                                                                                                                                                                                        trapping program under contract
     CS012          Community Services   Waste and            Waste Collection              Sale of Goods and Major                     -$       5,380.00 -$      5,380.00        -($5,380.00) Operating              Revenue                Other                                         Wayne Schafer     Revenue generated from payment for
                                         Environmental Health                                      Services                                                                                                                                                                                                  mattress removal during annual kerbside
                                                                                                                                                                                                                                                                                                             collection
     CS013          Community Services   Waste and            Mosquito Control                Materials & Services             6,500.00  $       3,282.00 -$      3,218.00          $3,282.00 Operating              Expense                 Other                                         Wayne Schafer     Savings identified MARC Membership (new
                                         Environmental Health                                                                                                                                                                                                                                                initiative)
     cso14          Community Services   Waste and            Environmental Health            Employee Benefits                                 31,733.00  $     31,733.00         $31,733.00 Operating               Expense                Rates                                         Wayne Schafer     Staff Redundancy not covered from within
                                         Environmental Health Coordinator                                                                                                                                                                                                                                    available budget.

                                                                                                                                                                 ae
                                                                                                                                                                           r
     Ex001          Executive Office     CEO                  Materials & Services            Materials & Services           $60,000.00        $10,000.00       ($5,000.00)        $55,000.00 Operating              Expense                 Rates                                        Alison Hamblin /   CEO contribution to Active Mums Programme
                                                                                                                                                                                                                                                                                            Amanda Tie       under Community Development as agreed in
                                                                                                                                                                                                                                                                                                             letter dated 20/8/15 confirming co-funding of
                                                                                                                                                                                                                                                                                                             project
     Ex002          Executive Office     Executive Manager    Environment Levy                Materials & Services          $250,000.00       $610,000.00       $360,000.00       $610,000.00 Operating              Expense                 Other              Council resolution -17      Narelle Reid     Funding for multi-year projects through the
                                                                                                                                                                                                                                                                 December 215                                Noosa Biosphere Reserve Foundation

     Ex003          Executive Office     Human Resources      Workplace Health and            Employee Benefits             $157,198.00        $90,242.00        $54,230.00       $211,428.00 Operating              Expense                 Rates              CEO & LT discussions       Deb lezzi / Will  Additional costs to address backlog of issues
                                                              Safety                                                                                                                                                                                                                       Burgess-Dean      related to the establishment of WH&S policies
                                                                                                                                                                                                                                                                                                             and procedures

     Ex004          Executive Office     Human Resources      Recruitment                     Materials & Services             $5,000.00       $14,672.00         $9,672.00        $14,672.00 Operating               Expense                Rates                                         Deb lezzi / Will  Recruitment costs exceeded original
                                                                                                                                                                                                                                                                                           Burgess-Dean      estimates

     0s001          Corporate Services   Property and Facilities North Shore Beach            Materials & Services             $1,680.00        $5,012.00        $11,732.00        $13,412.00 Operating              Expense                 Offset                                        Michelle Stirling Increased water quality monitoring
                                                              Campground
     oso002         Corporate Services   Property and Facilities North Shore Beach            Materials & Services           $15,250.00        $27,708.00 |      $54,750.00        $70,000.00 Operating              Expense                 Offset                                        Michelle Stirling Increase in cartage to improve water quality
                                                              Campground                                                                                                 ee
     S003           Corporate Services  Property and Facilities Transit Centre                Materials & Services             $1,500.00            $0.00        $27,512.60        $29,012.60 Operating              Expense                 Offset                                       Hayley Jamieson    Share of costs for Transit centre cleaning as
                                                                                                                                                                                                                                                                                                             per lease agreement - missed in the original
                                                                                                                                                                                                                                                                                                             budget
     OS004          Corporate Services   Property and Facilities North Shore Beach            Materials & Services           $35,000.04         $9,981.00      ($15,000.00)        $20,000.04 Operating               Expense                Offset                                        Michelle Stirling Cost reduction to offset increased expenses
                                                              Campground                                                                                                                                                                                                                                     for water monitoring, cartage and cleaning
     OS005          Corporate Services   Property and Facilities Community Leasing            Materials & Services           $90,600.00        $11,292.03      -($47,140.60)       $43,459.40 Operating              Expense                 Offset                                        Michelle Stirling Cost reduction to offset increased expenses
                                                                                                                                                                                                                                                                                                             for water monitoring, cartage and cleaning
     OS006          Corporate Services   Property and Facilities Community Land Use             Fees & Charges             ($28,702.00)      ($32,743.00)       -($4,041.00)   -($32,743.00) Operating               Revenue                 Offset                                        Michelle Stirling Recognise additional revenue from increased
                                                              Permits                                                                                                                                                                                                                                        activity level

                                                                                                                           ($53,500.00)      ($39,059.00)             ——        -($80,000.00) Operating
                    Corporate Services   Property and Facilities Community Land Use             Fees & Charges                                                          .00)                                                                                                               Michelle Stirling Recognise additional revenue from increased
     OS007                                                                                                                                                          500.                                             Revenue                 Offset
                                                              Permits                                                                                                                                                                                                                                        activity
                                                                                                                             -($3,609.00)     ($4,922.00) |    ~ ($1,313.00)      -($4,922.00) Operating
                                                                                                                                                                    aero
     OS008          Corporate Services   Property and Facilities Community Land Use             Fees & Charges                                                                                                        Revenue                Offset                                        Michelle Stirling Recognise additional revenue from increased
                                                              Permits                                                                                                                                                                                                                                        activity
     Pi001          Planning &           Building and Plumbing Building and Facilities        Materials & Services                $0.00             $0.00      $150,000.00        $150,000.00 Operating               Expense                Offset                                         Allan Hazel      Building Condition Assessment Report.
                    Infrastructure       Services             Management                                                                                                                                                                                                                                     Prepare specifications utilising local buy
                                                                                                                                                                                                                                                                                                             consultants in delivering stage 1 of condition
                                                                                                                                                                                                                                                                                                             reporting on Council owned buildings.

     Pl002          Planning &           Building and Plumbing Public Amenities               Materials & Services           $12,000.00         $3,997.00      (83,800.00)          $8,200.00 Operating               Expense                Offset                                          Allan Hazel     Purchase of locks for 38 toilet blocks to be
                    Infrastructure       Services                                                                                                                                                                                                                                                            complete next financial year.

                                                                                                                                 Page 28 of 47

Section 29

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 29 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                            8 FEBRUARY 2016

      Budget Review 3 - December Quarter Review 2015/16
      Summary of Submissions Received                                                                                    -$  1,723,311.04 -$   1,858,325.39  $     212,639.40 -$   1,510,671.64
      (clea)       fel yer atlas          Te Talo)             Cost Centre / Project           Financial Statement       2015/16 Current  PAU Ea    el 1     Proposed          Proposed New      Capital / Operating     Revenue / Expense       Funding Source      Council Resolution /      Council Contact    ere TT
                                                               Description                         Description           Budget                              Budget            Budget                                                                                ore elt eae ad
                                                                                                                                                             Ee its
      PI003         Planning &           Building and Plumbing Public Amenities                Materials & Services             $20,000.00         $3,365.00       -(87,000.00)       $13,000.00 Operating               Expense                 Offset                                          Allan Hazell     Public amenity works to be undertaken next
                    Infrastructure       Services                                                                                                                                                                                                                                                                 financial year

      PI004         Planning &           Building and Plumbing Tewantin Admin Building         Materials & Services             $20,000.00         $5,156.00     -($14,000.00)         $6,000.00 Operating               Expense                 Offset                                          Allan Hazel      Stage 1 - Level 3 handrails and safety
                    Infrastructure       Services                                                                                                                                                                                                                                                                 screens to be complete next finncial year

      PI005         Planning &           Building and Plumbing Building and Pool                 Fees & Charges             ($120,000.00)       -($83,666.00)    Se)              -($150,000.00) Operating               Revenue                 Offset                                          Allan Hazel      Increase in lodgement fees this FY.
                                                                                                                                                       a     —-.-.
                                                                                                                                                                 ‘
                    Infrastructure _     Services              Compliance                                                                                        ($35,000.00)     -($160,000.00) Operating
      PIO06         Planning &           Building and Plumbing Building and Pool                 Fees & Charges             -($125,000.00)      -($93,001.00)                                                            Revenue                 Offset                                          Allan Hazel      Increase in Property search fees this FY.
                    Infrastructure       Services              Compliance                                                                             eames
      PI007         Planning &           Building and Plumbing Building and Pool                 Fees & Charges              -($92,000.00)      ($56,606.00)     ($20,000.00)     -($112,000.00) Operating               Revenue                 Offset                                          Allan Hazel      Increase in application fees this FY.
                    Infrastructure       Services              Compliance
      PIO08         Planning &           Infrastructure Planning Asset Management and          Materials & Services                  $0.00             $0.00      $128,000.00       $128,000.00 Operating                Expense                 Offset              Infrastructure &          Bryan O'Conner     Asset Management Capability Audit approved |
                    Infrastructure       & Design              Service Programming                                                                                                                                                                                   Services Committee                           by the Infrastructure and Services Committee
                                                                                                                                                            ee                                                                                                       Meeting Nov 215.                             Meeting in November 2015.
                                                                                                                                                                      ,000.00)
                                                                                                                                                                      Canat
      Pl008         Planning &           Infrastructure Planning Asset Management and          Materials & Services           $139,325.00          $1,381.00    {$128                 $11,325.00 Operating               Expense                 Offset                                        Bryan O'Conner     Reduction required to fund the Asset
                                                                                                                                                                    23
                    Infrastructure       & Design              Service Programming                                                                                                                                                                                                                                Management Capability Audit
      Pi009         Planning &           Civil Operations      Sealed Roads                     Employee Benefits                    $0.00      $261,517.00                         $523,034.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PI009         Planning &           Civil Operations      Gravel Roads                     Employee Benefits                    $0.00      $184,194.00      $368,388.00        $368,388.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PIO09         Planning &           Civil Operations      Signs and lines                  Employee Benefits                    $0.00        $84,683.00      $169,367.00       $169,367.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PI009         Planning &           Civil Operations      Bridges                          Employee Benefits                    $0.00      $153,727.00       $307,454.00       $307,454.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PIO09         Planning &           Civil Operations      Drainage                         Employee Benefits                    $0.00      $239,979.00       $479,958.00       $479,958.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      Pl009         Planning &           Civil Operations      Road Fumiture                    Employee Benefits                    $0.00       $63,263.00       $126,526.00       $126,526.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PIO09         Planning &           Civil Operations      Emergency Operations             Employee Benefits                    $0.00        $15,865.00        $31,730.00        $31,730.00 Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PIO09         Planning &           Civil Operations      Vegetation                       Employee Benefits                    $0.00       $89,025.00       $178,051.00       $178,051.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                               NALIN                                                                                                                                                            accounts to actual cost centres
     Pi009          Planning &           Civil Operations      Pathways                         Employee Benefits                    $0.00      $108,296.00       $216,592.00       $216,592.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PI009         Planning &           Civil Operations      Carparks                         Employee Benefits                    $0.00        $13,163.00        $26,326.00        $26,326.00 Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                  a                                                                                                                                             accounts to actual cost centres
      PIO09         Planning &           Civil Operations      Works Operations                 Employee Benefits                    $0.00        $53,733.00    - $107,466.00       $107,466.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      PI009         Planning &           Civil Operations      Works Operations                 Employee Benefits                    $0.00       $35,070.00        $70,141.00         $70,141.00 Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                             Coordination                                                                                                                                                                                                                                       accounts to actual cost centres
      P1009         Planning &           Civil Operations      Management Civil                 Employee Benefits                    $0.00       $44,566.00        $89,132.00         $89,132.00 Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                             Operations                                                                                                                                                                                                                                         accounts to actual cost centres
      Pl009         Planning &           Civil Operations      Works Operations                 Employee Benefits           ($769,000.00)    -($1,736,517.00) -($2,694,168.00)   -($3,463,168.00) Operating              Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      P1010         Planning &           Civil Operations      Parks & Gardens                  Employee Benefits                    $0.00      $331,542.00      $663,084.00        $663,084.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      P1010         Planning &           Civil Operations      Roads Landscaping and            Employee Benefits                    $0.00      $288,024.00       $576,048.00       $576,048.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                             Mowing                                                                                                                                                                                                                                             accounts to actual cost centres
      P1010         Planning &           Civil Operations      Arborist Services                Employee Benefits                    $0.00      $122,128.00       $244,256.00       $244,256.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      P1010         Planning &           Civil Operations      Sport Grounds                    Employee Benefits                    $0.00          $759.00          $1,518.00         $1,518.00 Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      P1010         Planning &           Civil Operations      Trail Network                    Employee Benefits                    $0.00        $90,933.00     $181,866.00        $181,866.00 Operating                Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres _
      PI010         Planning &           Civil Operations      Bushland Reserves                Employee Benefits                    $0.00        $11,116.00       $22,232.00.        $22,232.00 Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      P1010          ees                                                                                                                                       -($1,192,402.00)  -($1,223,402.00) Operating
                    Planning &           Civil Operations      Parks & Gardens                  Employee Benefits            -($31,000.00)    -($596,201.00)                                                             Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                  eee                                                                                                                                                           accounts to actual cost centres
      P1010         Planning &           Civil Operations      Roads Landscaping and            Employee Benefits                   $0.00        ($3,991.00)       -($7,982.00)      -($7,982.00) Operating              Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                             Mowing                                                                                                                                                                                                                                             accounts to actual cost centres
      P1010         Planning &           Civil Operations      Arborist Services                Employee Benefits                    $0.00    ($161,861.00)     $323,722.00)      -($323,722.00) Operating               Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure      Civil Operations                                        Employee Benefits                                                   ppp amo mae   ($163,163.00) Operating                Expense                                                                                  accounts to actual cost centres
      P1010         Planning &                                                                                                       $0.00      ($81,582.00) ($4        63.00)                                                                                                                                    Reallocation of labour budget from home
                                                               Bushland Reserves                                                                                    63                                                                           Rates                                            Allan Hull
                    Infrastructure                                                                                                                                  a                                                                                                                                             accounts to actual cost centres
      P1010         Planning &           Civil Operations      Ecology and Vegetation           Employee Benefits                    $0.00       -($1,030.00) |    481,738.00)       -($1,738.00) Operating              Expense                 Rates                                            Allan Hull      Reallocation of labour budget from home
                    Infrastructure                                                                                                                                                                                                                                                                                accounts to actual cost centres
      Pi011         Planning &           Infrastructure Planning Infrastructure Design          Employee Benefits                    $0.00       $41,950.00 —       $83,900.00        $83,900.00 Operating               Expense                 Rates                                        Nicholas Wellwood   Reallocation of labour budget from home
                    Infrastructure       & Design              Services                                                                                                                                                                                                                                           accounts to actual cost centres
      PI011         Planning &           Infrastructure Planning Project Design and Delivery    Employee Benefits                    $0.00        $26,158.00        $52,316.00        $52,316.00 Operating               Expense                 Rates                                        Nicholas Wellwood   Reallocation of labour budget from home
                    Infrastructure       & Design                                                                                              -                —                  -                                                                                                                              accounts to actual cost centres
      P1011         Planning &          Infrastructure. Planning Infrastructure Design          Employee Benefits                  ~ $0.00    48274,592.00)     ($275,592.00)     -($275,592.00) Operating               Expense                “Rates                                        Nicholas Wellwood   Reallocation of labour budget from home
                    Infrastructure       & Design              Services                                                                                                                                                                                                                                           accounts to actual cost centres
      PIO11         Planning &           Infrastructure Planning Infrastructure Survey          Employee Benefits                    $0.00      -($40,452.00)    -($80,905.00)      -($80,905.00) Operating              Expense                 Rates                                        Nicholas Wellwood   Reallocation of labour budget from home
                    Infrastructure       & Design              Services                                                                                                                                                                                                                                           accounts to actual cost centres
      P1014         Planning &           Infrastructure Planning Project Design and Delivery    Employee Benefits                    $0.00      ($45,914.00) |   (845,914.00)       -($45,914.00) Operating              Expense                 Rates                                        Nicholas Wellwood   Reallocation of labour budget from home
                    Infrastructure       & Design                                                                                                                                               a                                                                                                                 accounts to actual cost centres

                                                                                                                                   Page 29 of 47

Section 30

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 30 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                        8 FEBRUARY 2016

     Budget Review 3 - December Quarter Review 2015/16
      Summary of Submissions Received                                                                                   -$  1,723,311.04 -$   1,858,325.39  $     212,639.40 -$   1,510,671.64
      tei (elgclalote) fete Tetuleelg    Branch               Cost Centre / Project           ECC g                     2015/16 Current   2015/16 Actuals  Proposed          Proposed New      Capital / Operating     Revenue / Expense       Funding Source      Council Resolution /     Council Contact     ore      a)
                                                              Description                         Description           Budget                             [= TT e felt      Budget                                                                                ere  lt maga)
                                                                                                                                                           PUR es
      P1011         Planning &           Infrastructure Planning Transport Infrastructure      Employee Benefits           ($225,100.00)      -($37,389.00)      $150,321.70      -($74,778.30) Operating              Expense                 Rates                                       Nicholas Wellwood    Reallocation of labour budget from home
                    Infrastructure       & Design             Planning                                                                                                                                                                                                                                          accounts to actual cost centres
      P1012         Planning &           Building and Plumbing Tewantin Admi Building          Employee Benefits                $1,000.00        $6,025.00       $12,050.00         $13,050.00 Operating               Expense                 Rates                                           Allan Hazell     Reallocation of labour budget from home
                    Infrastructure       Services                                                                                                                                                                                                                                                               accounts to actual cost centres
     Pio12          Planning &           Building and Plumbing Electrical Services             Employee Benefits                    $0.00        $5,294.00        $10,588.00       - $10,588.00 Operating              Expense                 Rates                                           Allan Hazell     Reallocation of labour budget from home
                    Infrastructure       Services                                                                                                                                                                                                                                                               accounts to actual cost centres
     /P1012                                        prema                                       Employee Benefits                                                                   $38,612.00 Operating                Expense
                    Planning &           Building and Plumbing Noosaville Depot                                                     $0.00       $18,960.00        $38,612.00                                                                   Rates                                           Allan Hazell     Reallocation of labour budget from home
                    Infrastructure       Services                                                                                                                                                                                                                                                               accounts to actual cost centres
      P1012         Planning &           Building and Plumbing Pomona Depot                    Employee Benefits                    $0.00        $6,596.00        $13,192.00        $13,192.00 Operating               Expense                 Rates                                           Allan Hazell     Reallocation of labour budget from home
                    Infrastructure       Services                                                                                             ($37,221.00)      ($74,442.00)                                                                                                                                    accounts to actual cost centres
     P1012                               Building and Plumbing Electrical Services             Employee Benefits                    $0.00                                         ($74,442.00) Operating               Expense                 Rates
                                        ms
                    Planning &                                                                                                                                                                                                                                                                 Allan Hazell     Reallocation of labour budget from home
                    Infrastructure       Services                                                                                                                                                                                                                                                               accounts to actual cost centres
     ‘P1013         Planning &           Development          Environmental Services          Materials & Services            $28,040.00        $12,750.00        $23,500.00        $51,540.00 Operating               Expense                 Offset              General Committee Nov       Kerri Coyle      Wallace Park Flying Fox management review.
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Review the effectiveness of flying fox
                                         Environment                                                                                                                                                                                                                                                            deterrent and continue to monitor the flying
                                                                                                                                                                                                                                                                                                                foxes and provide educational material for
                                                                                                                                                                                                                                                                                                                residents and visitors.
     P1014          Planning &           Development          Environment Levy                Materials & Services                  $0.00            $0.00         $5,000.00         $5,000.00 Operating               Expense                 Other               Franz land agreement        Peter Milne      Implementation of environmental land
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         management agreement Coroibah purchase
                                         Environment

     'PI014         Planning &           Development          Environment Levy                Materials & Services          $1,401,068.00            $0.00 ($5,000.00)           $1,396,068.00 Operating               Expense                 Other               Franz land agreement _      Peter Milne      Implementation of environmental land
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         management agreement Coroibah purchase
                                         Environment
      P1015         Planning &           Development          Development Assessment            Fees & Charges              ($54,040.04)      $58,843.40) 484,808.36)            ($58,843.40) Operating                Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Application Fees -
                                                                                                                                                                    a a
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Reconfiguring of a Lot to reflect current level
     P1015          Planning &           Environment.        ~ Development Assessment           Fees & Charges                ($1,520.04)       a                          eee     --($9,258.00) Operating                                   Rates                                                              of activity.
                                         Development                                                                                            ($9,258.00)                                                            Revenue                                                                 Kerri Coyle      Adjust revenue forecast for Application Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Op Works Signs to reflect current level of
                                         Environment                                                                                                                                                                                                                                                            activity.
     P1015          Planning &           Development          Development Assessment            Fees & Charges                      $0.00      ($5,985.00) ($5,985.00) ($5,985.00) Operating                           Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for App Fees - Infra
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Agreement Variation to reflect current level of
     ‘P1015                              Environment                                                                                                      ——       ($267.00)         -($267.00) Operating                                                                                                       activity.
                    Planning &           Development          Development Assessment            Fees & Charges                      $0.00        -($267.00)                                                            Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Misc Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Building File Retrieval to reflect current level
                    Planning &           Environment                                                                                           -($4,167.00)      rite tereneoet    -($4,167.00) Operating                                                                                                       of activity.
      P1015                              Development          Development Assessment            Fees & Charges                      $0.00                        (84,167.00)                                           Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Misc Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Document Examination Fees to reflect current
                                         Environment                                                                                                                                                                                                                                                            level of activity.
     P1015          Planning &           Development          Development Assessment            Fees & Charges             -($720,000.00)    ($806,735.25)     ($126,735.25)    -($846,735.25) Operating               Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Application Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Material Change of Use to reflect current level
                                         Environment                                                                                                                                                                                                                                                            of activity.
     ‘P01           Planning &           Development          Development Assessment            Fees & Charges             ($102,000.00)      ~($19,560.00)       $62,000.00      -($40,000.00) Operating              Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Search Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Property to reflect current level of activity.
                                         Environment,
     'PI015         Planning &           Development          Development Assessment        Sale of Goods and Major           -($8,049.96)      -($8,839.11)     -($3,000,00)     -($11,049.96) Operating              Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Other - Sales -
                    Infrastructure       Assessment and                                             Services                                                                                                                                                                                                    Written Advices to reflect current level of
      P1015         Planning &           Environment                                        Sale of Goods and Major            ($120.00) ©        8798.73)   ——_—+48678.73)          ($798.73) Operating                                                                                                        activity.
                                                                                                                                                                     sa perescenmeneaen
                                         Development          Development Assessment                                                                                                                                   Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Other - Sales -
                    Infrastructure       Assessment and                                             Services                                                                                                                                                                                                    Maps Etc to reflect current level of activity.
     P1015                               Environment                                                                                                      _
                    Planning &           Development          Development Assessment         Other Recurrent Income                 $0.00      -($4,020.57)     ATL)              -($12,000.00) Operating              Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Other - Sundry
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Recoup - Legal Fees Recovered to reflect
     P1015                               Environment                                                                          ($3,677.04)     4{$15,209.00)     $11,531.96)       -($15,209.00) Operating                                                                                                       current level of activity.
                                                                                                                                                                                   =
                    Planning &           Development          Operational Works                 Fees & Charges                                                                                                         Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Application Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Changes to reflect current level of activity.
                                         Environment
                                                                                                                               ($480.96)        ($1,431.00)        eee             ($1 ,431.00) Operating
      PI015         Planning &           Development          Operational Works                 Fees & Charges                                                     ($950.04)                                           Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for Misc Fees - Bond
                                                                                                                                                                  2
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Processing Fees to reflect current level of
     /PIO15         Planning &           Environment         ~ Operational Works                Fees & Charges             -($110,000.00)    ($147,634.50)      ($57,000.00)     -($167,000.00) Operating                                      Rates                                           Kerri Coyle      activity.
                                         Development                                                                                                                                                                   Revenue                                                                                  Adjust revenue forecast for Application Fees -
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         Op Works Civil to reflect current level of
                                         Environment                                                                                                                                                                                                                                                            activity.
     P1015          Planning &           Development          Operational Works                 Fees & Charges              -($73,500.00)     -($28,350.00)     ($50,000.00)     ($123,500.00) Operating               Revenue                 Rates                                           Kerri Coyle      Adjust revenue forecast for search fees to
                    Infrastructure       Assessment and                                                                                                                                                                                                                                                         reflect current level of activity.
    ‘pio16          Planning &           Environment                                                                        ($21,318.00)      -($59,671.00)     APSF, 2ELO0)      -($59,680.00) Operating
                                         Director Planning &  Disaster Management         Grants, subsidies - Operating                                                                                                Revenue                 Offset                                         Martin Drydale    Reimbursement of costs from QLD NDRRA
                    Infrastructure       Infrastructure                                                                                                                                                                                                                                                         for TC Maricia.

                                                                                                                                 Page 30 of 47

Section 31

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 31 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                              8 FEBRUARY 2016

     Capital / Operating                    Operating

     Sum of Proposed Budget Adjustment                                                                                                                                                                                                       Revenue / Expense
     Financial Statement Description        Branch                                              Cost Centre / Project Description                     Comments                                                                                      Expense                  Revenue           Grand Total
        Employee Benefits                      Community Facilities                                Noosa Leisure Centre                               Transfer of budget from casual labour to contract services for group fitness instructors due            (7,250)                               (7,250)
                                                                                                                                                      to a shift away from employees towards contractors.
                                                                                                Noosa Leisure Centre Total                                                                                                                                    (7,250)                               (7,250)
                                            Community Facilities Total                                                                                                                                                                                        (7,250)                               (7,250)
                                              Building and Plumbing Services                      Tewantin Admi Building                              Reallocation of labour budget from home accounts to actual cost centres                                 12,050                                 12,050
                                                                                                Tewantin Admi Building Total                                                                                                                                  12,050                                 12,050
                                                                                                  Electrical Services                                 Reallocation of labour budget from home accounts to actual cost centres                                (63,854)                              (63,854)
                                                                                                Electrical Services Total                                                                                                                                    (63,854)                              (63,854)
                                                                                                  Noosaville Depot                                    Reallocation of labour budget from home accounts to actual cost centres                                 38,612                                 38,612
                                                                                                Noosaville Depot Total                                                                                                                                        38,612                                 38,612
                                                                                                  Pomona Depot                                        Reallocation of labour budget from home accounts to actual cost centres                                 13,192                                 13,192
                                                                                                Pomona Depot Total                                                                                                                                            13,192                                 13,192
                                            Building and Plumbing Services Total                   Workplace Health and Safety                        Additional costs to address backlog of issues related to the establishment of WH&S                      54,230                                 54,230
                                               Human Resources
                                                                                                                                                      policies and procedures
                                                                                                Workplace Health and Safety Total                                                                                                                             54,230                                 54,230
                                            Human Resources Total                                                                                                                                                                                             54,230                                 54,230
                                               Libraries and Galleries                             Library Program and Services / Best Start Family Liter Best Start literacy project first five forever - reallocate budget to project natural accounts      28,310                                 28,310

                                                                                                Library Program and Services / Best Start Family                                                                                                              28,310                                 28,310
                                                                                                Literacy Total
                                                                                                  Library Program and Services / Noosa's War Front    Noosa's War Front. Reallocate budget to project natural accounts                                           915                                   915
                                                                                                Library Program and Services / Noosa's War Front                                                                                                                 915                                   915
                                                                                                Total
                                                                                                  Library Programs & Services/Noosa's War Front Pinne Noosa's War Front Pinned. Reallocate budget to natural accounts                                          3,387                                  3,387
                                                                                                Library Programs & Services/Noosa's War Front Pinned                                                                                                           3,387                                  3,387
                                                                                                Total
                                                                                                  Library Programs & Services/Tech Savy Seniors       Tech Savy Seniors. New budget allocation to natural accounts                                            11,780                                 11,780
                                                                                                Library Programs & Services/Tech Savy Seniors Total                                                                                                           11,780                                 11,780

                                            Libraries and Galleries Total                                                                                                                                                                                     44,392                                44,392
                                              Waste and Environmental Health                      Environmental Health Coordinator                    Staff Redundancy not covered from within available budget.                                              31,733                                 31,733
                                                                                                Environmental Health Coordinator Total                                                                                                                        31,733                                 31,733
                                            Waste and Environmental Health Total                                                                                                                                                                              31,733                                 31,733
                                              Civil Operations                                    Sealed Roads                                        Reallocation of labour budget from home accounts to actual cost centres                                523,034                               523,034
                                                                                                Sealed Roads Total                                                                                                                                           523,034                               923,034
                                                                                                  Gravel Roads                                        Reallocation of labour budget from home accounts to actual cost centres                                368,388                               368,388
                                                                                                Gravel Roads Total                                                                                                                                           368,388                               368,388
                                                                                                  Signs and lines                                     Reallocation of labour budget from home accounts to actual cost centres                                169,367                               169,367
                                                                                                Signs and lines Total                                                                                                                                        169,367                               169,367
                                                                                                  Bridges                                             Reallocation of labour budget from home accounts to actual cost centres                                307,454                               307,454
                                                                                                Bridges Total                                                                                                                                                307,454                               307,454
                                                                                                  Drainage                                            Reallocation of labour budget from home accounts to actual cost centres                                479,958                               479,958
                                                                                                Drainage Total                                                                                                                                               479,958                               479,958
                                                                                                  Road Furniture                                      Reallocation of labour budget from home accounts to actual cost centres                                126,526                               126,526
                                                                                                Road Furniture Total                                                                                                                                         126,526                               126,526
                                                                                                  Emergency Operations                                Reallocation of labour budget from home accounts to actual cost centres                                 31,730                                 31,730
                                                                                                Emergency Operations Total                                                                                                                                    31,730                                 31,730
                                                                                                  Vegetation                                          Reallocation of labour budget from home accounts to actual cost centres                                178,051                               178,051
                                                                                                Vegetation Total                                                                                                                                             178,051                               178,051
                                                                                                  Pathways                                            Reallocation of labour budget from home accounts to actual cost centres                                216,592                               216,592
                                                                                                Pathways Total                                                                                                                                               216,592                               216,592
                                                                                                  Carparks                                            Reallocation of labour budget from home accounts to actual cost centres                                 26,326                                 26,326
                                                                                                Carparks Total                                                                                                                                                26,326                                 26,326
                                                                                                  Works Operations                                    Reallocation of labour budget from home accounts to actual cost centres                             (2,586,702)                           (2,586,702)
                                                                                                Works Operations Total                                                                                                                                    (2,586,702)                           (2,586,702)
                                                                                                  Works Operations Coordination                       Reallocation of labour budget from home accounts to actual cost centres                                 70,141                                 70,141
                                                                                                Works Operations Coordination Total                                                                                                                           70,141                                 70,141
                                                                                                  Management Civil Operations                         Reallocation of labour budget from home accounts to actual cost centres                                 89,132                                 89,132
                                                                                                Management Civil Operations Total                                                                                                                             89,132                                 89,132
                                                                                                  Parks & Gardens                                     Reallocation of labour budget from home accounts to actual cost centres                              (529,318)                              (529,318)
                                                                                                Parks & Gardens Total                                                                                                                                      (529,318)                              (529,318)
                                                                                                  Roads Landscaping and Mowing                        Reallocation of labour budget from home accounts to actual cost centres                                568,066                               568,066
                                                                                                Roads Landscaping and Mowing Total                                                                                                                           568,066                               568,066
                                                                                                  Arborist Services                                   Reallocation of labour budget from home accounts to actual cost centres                                (79,466)                              (79,466)
                                                                                                Arborist Services Total                                                                                                                                      (79,466)                              (79,466)
                                                                                                  Sport Grounds                                       Reallocation of labour budget from home accounts to actual cost centres                                  1,518                                  1,518

                                                                                                                Page 31 of 47

Section 32

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 32 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                     8 FEBRUARY 2016

     Sum of Proposed Budget Adjustment                                                                                                                                                                                                        Revenue / Expense
     Financial Statement Description         Branch                                              Cost Centre / Project Description                     Comments                                                                                       Expense                  Revenue          Grand Total
     Employee Benefits                       Civil Operations                                    Sport Grounds Total                                                                                                                                             1,518                                  1,518
                                                                                                   Trail Network                                       Reallocation of labour budget from home accounts to actual cost centres                                181,866                                181,866
                                                                                                 Trail Network Total                                                                                                                                          181,866                                181,866
                                                                                                   Bushland Reserves                                   Reallocation of labour budget from home accounts to actual cost centres                               (140,931)                              (140,931)
                                                                                                 Bushland Reserves Total                                                                                                                                     (140,931)                              (140,931)
                                                                                                   Ecology and Vegetation                              Reallocation of labour budget from home accounts to actual cost centres                                 (1,738)                                (1,738)
                                                                                                 Ecology and Vegetation Total                                                                                                                                  (1,738)                                (1,738)
                                             Civil Operations Total                                                                                                                                                                                                (6)                                    (6)
                                               Infrastructure Planning & Design                    Infrastructure Design Services                      Reallocation of labour budget from home accounts to actual cost centres                               (191,692)                              (191,692)
                                                                                                 Infrastructure Design Services Total                                                                                                                        (191,692)                              (191,692)
                                                                                                   Project Design and Delivery                         Reallocation of labour budget from home accounts to actual cost centres                                   6,402                                  6,402
                                                                                                 Project Design and Delivery Total                                                                                                                               6,402                                  6,402
                                                                                                   Infrastructure Survey Services                      Reallocation of labour budget from home accounts to actual cost centres                                (80,905)                               (80,905)
                                                                                                 Infrastructure Survey Services Total                                                                                                                         (80,905)                               (80,905)
                                                                                                   Transport Infrastructure Planning                   Reallocation of labour budget from home accounts to actual cost centres                                150,322                                150,322
                                                                                                 Transport Infrastructure Planning Total                                                                                                                      150,322                                150,322
                                             Infrastructure Planning & Design Total                                                                                                                                                                          (115,873)                              (115,873)
                                               Community Development                               Active Mums Program                                 Staff for delivery of Get Out Get Active Program - Active Mums as supported by CEO                        3,200                                  3,200
                                                                                                 Active Mums Program Total                                                                                                                                       3,200                                  3,200
                                             Communi     Development Total                                                                                                                                                                                       3,200                                  3,200
     Employee Benefits Total                                                                                                                                                                                                                                    10,426                                10,426
        Materials & Services                   Community Facilities                                 Noosa Aquatic Centre                               Conduct detailed inspection and condition audit of NAC pool plant, document current                      15,000                                 15,000
                                                                                                                                                       condition assessments and develop detailed maintenance schedules, capital replacement
                                                                                                                                                       schedules and comprehensive asset register. Total cost is $18k however $3k will be
                                                                                                                                                       funded out of current budget, with lower priority projects to be pushed back as a result.

                                                                                                 Noosa Aquatic Centre Total                                                                                                                                     15,000                                 15,000
                                                                                                    Respite Centre                                     Purchase of six iPads for use in the Broadband for Seniors program. Funding to come from                  4,000                                  4,000
                                                                                                                                                       NCS reserve account.
                                                                                                                                                       Combined increase of $11,262 from state funding and $27,904 from federal funding                        39,166                                 39,166
                                                                                                                                                       increases, as per previous listed items. Increase in expenditure results in zero net budget
                                                                                                                                                       movement.
                                                                                                                                                       Purchase of outdoor and indoor blinds, indoor and outdoor furniture, autoclave for                      26,000                                 26,000
                                                                                                                                                       sterilization of pedicure equipment, assorted kitchen appliances and a new fridge. All to be
                                                                                                                                                       funded from NCS reserve account.
                                                                                                 Respite Centre Total                                                                                                                                          69,166                                 69,166
                                                                                                    Noosa Leisure Centre                               Transfer of budget from casual labour to contract services for group fitness instructors due              7,250                                  7,250
                                                                                                                                                       to a shift away from employees towards contractors.
                                                                                                 Noosa Leisure Centre Total                                                                                                                                      7,250                                  7,250
                                             Community Facilities Total                                                                                                                                                                                        91,416                                 91,416
                                               Executive Manager                                   Environment Levy                                    Funding for multi-year projects through the Noosa Biosphere Reserve Foundation                         360,000                                360,000
                                                                                                 Environment Levy Total                                                                                                                                       360,000                                360,000
                                             Executive Manager Total                                                                                                                                                                                          360,000                                360,000
                                               Property and Facilities                              North Shore Beach Campground                       Cost reduction to offset increased expenses for water monitoring, cartage and cleaning                 (15,000)                               (15,000)

                                                                                                                                                       Increase in cartage to improve water quality                                                             54,750                                54,750
                                                                                                                                                       Increased water quality monitoring                                                                       11,732                                 11,732
                                                                                                 North Shore Beach Campground Total                                                                                                                            51,482                                 51,482
                                                                                                   Transit Centre                                      Increased costs for cleaning as per lease agreement                                                     27,513                                 27,513
                                                                                                 Transit Centre Total                                                                                                                                          27,513                                 27,513
                                                                                                    Community Leasing                                  Cost reduction to offset increased expenses for water monitoring, cartage and cleaning                 (47,141)                               (47,141)

                                                                                                 Community Leasing Total                                                                                                                                      (47,141)                               (47,141)
                                             Property and Facilities Total                                                                                                                                                                                     31,854                                 31,854
                                               Building and Plumbing Services                       Tewantin Admin Building                            Stage 1-Level 3 handrails and safety screens to be complete next FY. Allowance has been                (14,000)                               (14,000)
                                                                                                                                                       made in next FY budget.
                                                                                                 Tewantin Admin Building Total                                                                                                                                (14,000)                               (14,000)
                                                                                                    Public Amenities                                   Purchase of locks for 38 toilet blocks to be complete next financial year. Budget has been              (3,800)                                (3,800)
                                                                                                                                                       placed into next FY for completion.
                                                                                                                                                       Following works relating to public amenities will not be complete this FY. Allowance has                (7,000)                                (7,000)
                                                                                                                                                       been made in next FY budget.
                                                                                                                                                       Castaways Repaint ext doors screens and roof $2,000. Ed Webb-repaint block walls
                                                                                                                                                       fascia's and soffit $1000, Replace doors $700, repaint int walls $700.
                                                                                                                                                       Seaview Tc - repaint int doors $300, ext wall repaint $1000, Repaint int doors $300, ext
                                                                                                                                                       wall repaint $1000,

                                                                                                 Public Amenities Total                                                                                                                                       (10,800)                               (10,800)

                                                                                                                   Page 32 of 47

Section 33

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 33 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                           8 FEBRUARY 2016

     Sum of Proposed Budget Adjustment                                                                                                                                                                                                 Revenue / Expense
     Financial Statement Description       Branch                                             Cost Centre / Project Description                    Comments                                                                                    Expense                 Revenue          Grand Total
       Materials & Services                   Building and Plumbing Services                     Building and Facilities Management                Building Condition Assessment Report. Prepare specifications utilising local buy                    150,000                               150,000
                                                                                                                                                   consultants in delivering stage 1 of condition reporting on Council owned buildings.
                                                                                                                                                   Identified 53 high priority buildings, we estimate an average costs of $2,830/ building.
                                                                                              Building and Facilities Management Total                                                                                                                 150,000                               150,000
                                           Building and Plumbing Services Total                                                                                                                                                                        125,200                               125,200
                                              Director Community Services                        Director Community Services                       Contributing towards the cost of conducting the detailed inspection and condition                    (5,000)                               (5,000)
                                                                                                                                                   assessment of the NAC pool plant, as approved via the Leadership Team backlog projects
                                                                                                                                                   process.
                                                                                              Director Community Services Total                                                                                                                         (6,000)                               (5,000)
                                           Director Community Services Total                                                                                                                                                                            (5,000)                               (5,000)
                                             Human Resources                                    Recruitment                                        Recruitment costs exceeded original estimates                                                         9,672                                 9,672
                                                                                              Recruitment Total                                                                                                                                          9,672                                 9,672
                                           Human Resources Total                                                                                                                                                                                         9,672                                 9,672
                                              CEO                                                Materials & Services                              CEO contribution to Active Mums Programme under Community Development as agreed in                   (5,000)                               (5,000)
                                                                                                                                                   letter dated 20/8/15 confirming co-funding of project
                                                                                              Materials & Services Total                                                                                                                                (5,000)                               (5,000)
                                           CEO Total                                                                                                                                                                                                    (5,000)                               (5,000)
                                              Libraries and Galleries                            Library Program and Services / Best Start Family Liter Best Start literacy project first five forever - reallocate budget to project natural accounts (28,310)                              (28,310)

                                                                                              Library Program and Services / Best Start Family                                                                                                         (28,310)                              (28,310)
                                                                                              Literacy Total
                                                                                                Library Program and Services / Noosa's War Front   Noosa's War Front. Reduce forecast budget to account for GST error                                   (8,652)                               (8,652)
                                                                                                                                                   Noosa's War Front. Reallocate budget to project natural accounts                                      8,099                                 8,099
                                                                                              Library Program and Services / Noosa's War Front                                                                                                            (553)                                 (553)
                                                                                              Total
                                                                                                Library Programs & Services/Noosa's War Front Pinne Noosa's War Front Pinned. Reallocate budget to natural accounts                                     (3,387)                               (3,387)
                                                                                              Library Programs & Services/Noosa's War Front Pinned                                                                                                      (3,387)                               (3,387)
                                                                                              Total
                                                                                                Library Programs & Services/QLD Week 2016          QLD Week 2016. New budget allocation to natural accounts                                              4,050                                 4,050
                                                                                              Library Programs & Services/QLD Week 2016 Total                                                                                                            4,050                                 4,050
                                                                                                Library Programs & Services/Tech Savy Seniors      Tech Savy Seniors. New budget allocation to natural accounts                                          5,200                                 5,200
                                                                                              Library Programs & Services/Tech Savy Seniors Total                                                                                                        5,200                                 5,200

                                           Libraries and Galleries Total                                                                                                                                                                               (23,000)                              (23,000)
                                             Waste and Environmental Health                     Wild Dog Trapping Program                          Council agreed to conduct a trial wild dog trapping program under contract                           39,000                                39,000
                                                                                              Wild Dog Trapping Program Total                                                                                                                           39,000                                39,000
                                                                                                Mosquito Control                                   Savings identified MARC Membership (new initiative)                                                  (3,218)                               (3,218)
                                                                                              Mosquito Control Total                                                                                                                                    (3,218)                               (3,218)
                                           Waste and Environmental Health Total                                                                                                                                                                         35,782                                35,782
                                              Infrastructure Planning & Design                   Asset Management and Service Programming          Asset Management Capability Audit approved by the Infrastructure and Services                       128,000                               128,000
                                                                                                                                                   Committee Meeting in November 2015.
                                                                                              Asset Management and Service Programming Total       Reduction required to fund the Asset Management Capability Audit                                   (128,000)                             (128,000)
                                           Infrastructure Planning & Design Total                                                                                                                                                                            =                                     o
                                             Development Assessment and Environment             Environment Levy                                   Implementation of environmental land management agreement Coroibah purchase                               -                                     -
                                                                                              Environment Levy Total                               Wallace Park Flying Fox management review. Review the effectiveness of flying fox                    23,500                                23,500
                                                                                                 Environmental Services
                                                                                                                                                   deterrent and continue to monitor the flying foxes and provide educational material for
                                                                                                                                                   residents and visitors.
                                                                                              Environmental Services Total                                                                                                                              23,500                                23,500
                                           Development Assessment and Environment Total                                                                                                                                                                 23,500                                23,500

                                             Community Development                              Active Mums Program                                Get Out Get Active Program - Active Mums as supported by CEO                                         10,250                                10,250
                                                                                                                                                   Equipment for delivery of Get Out Get Active Program - Active Mums as supported by CEO                  200                                   200

                                                                                                                                                   Advertising for the Get Out Get Active Program - Active Mums as supported by CEO                        580                                   580
                                                                                                                                                   Hire of premise for the Get Out Get Active Program - Active Mums as supported by CEO                    820                                   820

                                                                                              Active Mums Program Total                                                                                                                                 11,850                                11,850
                                           Community Development Total                                                                                                                                                                                  11,850                                11,850
     Materials & Services Total                                                                                                                                                                                                                        656,274                               656,274
       Fees & Charges                        Property and Facilities                            Community Land Use Permits                         Recognise additional revenue from increased activity level                                                                  (31,854)      (31,854)
                                                                                              Community Land Use Permits Total                                                                                                                                                 (31,854)      (31,854)
                                           Property and Facilities Total                                                                                                                                                                                                       (31,854)      (31,854)
                                             Building and Plumbing Services                     Building and Pool Compliance                       Increase in application fees this FY.                                                                                       (20,000)      (20,000)
                                                                                                                                                   Increase in lodgement fees this FY.                                                                                         (30,000)      (30,000)
                                                                                                                                                   Increase in Property search fees this FY.                                                                                   (35,000)      (35,000)
                                                                                              Building and Pool Compliance Total                                                                                                                                               (85,000)      (85,000)
                                           Building and Plumbing Services Total                                                                                                                                                                                                (85,000)      (85,000)

                                                                                                               Page 33 of 47

Section 34

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 34 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                               8 FEBRUARY 2016

     Sum of Proposed Budget Adjustment                                                                                                                                                                                                     Revenue / Expense
     Financial Statement Description        Branch                                              Cost Centre / Project Description                    Comments                                                                                      Expense                 Revenue           Grand Total
       Fees & Charges                         Development Assessment and Environment              Development Assessment                             Adjust revenue forecast to reflect current level of activity.                                                                  (87,696)      (87,696)
                                                                                                Development Assessment Total                                                                                                                                                        (87,696)      (87,696)
                                                                                                  Operational Works                                  Adjust revenue forecast to reflect current level of activity.                                                                 (119,482)    (119,482)
                                                                                                Operational Works Total                                                                                                                                                            (119,482)    (119,482)
                                            Development Assessment and Environment Total                                                                                                                                                                                           (207,178)    (207,178)

     Fees & Charges Total                                                                                                                                                                                                                                                          324,032       324,032
       Grants, subsidies - Operating           Community Facilities                                Respite Centre                                    Increase in state government under 65's respite care as a result of an annual indexation                                       (11,262)      (11,262)
                                                                                                                                                     increase of 2.88%. Contract services expenses will be increased accordingly to result ina
                                                                                                                                                     zero net budget change.
                                                                                                                                                     Increase in federal government's over 65's respite care as a result of a new funding                                           (27,904)      (27,904)
                                                                                                                                                     agreement. Contract services expenses will be increased accordingly to result in a zero net
                                                                                                                                                     budget change.
                                                                                                Respite Centre Total                                                                                                                                                                (39,166)      (39,166)
                                            Community Facilities Total                                                                                                                                                                                                              (39,166)     (39,166)
                                              Libraries and Galleries                             Library Program and Services / Noosa's War Front   Noosa's War Front. Reduce forecast budget to account for GST error                                                                (362)        (362)
                                                                                                Library Program and Services / Noosa's War Front                                                                                                                                       (362)        (362)
                                                                                                Total
                                                                                                  Library Programs & Services/QLD Week 2016          QLD Week 2016. New budget allocation to natural accounts                                                                        (4,050)       (4,050)
                                                                                                Library Programs & Services/QLD Week 2016 Total                                                                                                                                      (4,050)       (4,050)
                                                                                                  Library Programs & Services/Tech Savy Seniors      Tech Savy Seniors. New budget allocation to natural accounts                                                                   (16,980)      (16,980)
                                                                                                Library Programs & Services/Tech Savy Seniors Total                                                                                                                                 (16,980)      (16,980)

                                            Libraries and Galleries Total                                                                                                                                                                                                           (21,392)     (21,392)
                                              Director Planning & Infrastructure                  Disaster Management                                Reimbursement of costs from QLD NDRRA for TC Maricia.                                                                          (38,362)      (38,362)
                                                                                                Disaster Management Total                                                                                                                                                           (38,362)      (38,362)
                                            Director Planning & Infrastructure Total                                                                                                                                                                                                (38,362)     (38,362)
                                              Community Development                               Active Mums Program                                Grant funding for Get Out Get Active Program - Active Mums as supported by CEO                                                 (10,050)      (10,050)
                                                                                                Active Mums Program Total                                                                                                                                                           (10,050)      (10,050)
                                            Communi     Development Total                                                                                                                                                                                                           10,050        10,050
     Grants, subsidies -   Operating Total                                                                                                                                                                                                                                         108,970       108,970
       Sale of Goods and Major Services        Waste and Environmental Health                     Waste Collection                                   Revenue generated from payment for mattress removal during annual kerbside collection                                           (5,380)       (5,380)

                                                                                                Waste Collection Total                                                                                                                                                               (5,380)       (5,380)
                                            Waste and Environmental Health Total                                                                                                                                                                                                     (5,380)       (5,380)
                                              Development Assessment and Environment              Development Assessment                             Adjust revenue forecast to reflect current level of activity.                                                                   (3,679)       (3,679)
                                                                                                Development Assessment Total                                                                                                                                                         (3,679)       (3,679)
                                            Development Assessment and Environment Total                                                                                                                                                                                             (3,679)       (3,679)

     Sale of Goods and Major Services                                                                                                                                                                                                                                                (9,059)       (9,059)
     Total
       Other Recurrent Income                 Development Assessment and Environment              Development Assessment                             Adjust revenue forecast to reflect current level of activity.                                                                  (12,000)      (12,000)
                                                                                                Development Assessment Total                                                                                                                                                        (12,000)      (12,000)
                                            Development Assessment and Environment Total                                                                                                                                                                                            (12,000)     (12,000)

     Other Recurrent Income Total                                                                                                                                                                                                                                                   (12,000)     (12,000)
     Grand Total                                                                                                                                                                                                                                           666,699                 (454,060)      212,639

                                                                                                                Page 34 of 47

Section 35

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 35 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                    8 FEBRUARY 2016

     Budget Review 3 - December Quarter Review 2015/16
     Summary of Submissions Received                                                                                   $_15,120,117.71   $   4,738,897.00  $   1,924,993.29  $ 17,045,111.00
      Reference     eleyeF Tate) g       Branch               Cost Centre / Project          Financial Statement       2015/16 Current  Pi aD We          Proposed          Proposed New      Capital / Operating     Revenue / Expense      Funding Source      Council Resolution /    Business Contact    ere      ey
                                                              Description                        Description           Budget                             Budget            Budget                                                                               ree laa eas
                                                                                                                                                          Adjustment
     CP001          Planning &           Civil Operations     Cooroy,Mary River Road                                         $50,000.00        $10,613.00       $122,500.00       $172,500.00 Capital                 Expense                Offset                                       Cameron Shields    Level 3 Inspection conducted by TODs on
                    Infrastructure                            Timber Bridge                                                                                                                                                                                                                                  OCT 2015 found additional work was required
                                                              Rehabilitation                                                                                                                                                                                                                                 to extend the asset life that was not identified
                                                                                                                                                                                                                                                                                                             in the original level 3 inspection.
     CP002          Planning &           Infrastructure Planning Castaways Beach - Beach                                     $70,000.00           $482.00         $6,000.00        $76,000.00 Capital                 Expense                Offset                                         David Shing      Final costs exceeded initial estimates
                    Infrastructure       & Design             Access 42                                                                                                  ee
     CP003          Planning &           Building and Plumbing Noosa Heads Surf Club                                         $85,000.00             $0.00 |    -($85,000,00)            $0.00 Capital                 Expense                Offset                                          lan Pearce      Expanded scope of works following detailed
                    Infrastructure       Services             Public Amenities                                                                                                                                                                                                                               investigations - works deferred to 2016/17
                                                              Refurbishment                                                                                                                                                                                                                                  program

     CP004          Community Services   Community Facilities Sunshine Beach - NAC :                                         $55,000.00             $0.00       $45,000.00        $100,000,00 Capital                 Expense                Offset                                        Stephen James     Initial estimates incomplete for scope of works
                                                              Replacement of Program                                                                                                                                                                                                                         required
                                                              Pool heat pump

     CPO005         Planning &           Building and Plumbing Replacement of Condenser                                            $0.00       $64,102.00        $65,000.00        $65,000.00 Capital                 Expense                Offset                                         Allan Hazell     Emergent works due to failure of the existing
                    Infrastructure       Services             Units at The J AC                                                                                                                                                                                                                              unit
     CP006          Planning &           Building and Plumbing Noosaville Depot Workshop                                           $0.00            $0.00 |      $17,795.00        $17,795.00 Capital                 Expense                Offset                                         Phill Parkman    Urgent renewal works as current asset has
                    Infrastructure       Services             Roller Doors Replacement                                                                                                                                                                                                                       failed
     CP007          Planning &           Planning and         Environment Levy Land                                                $0.00    $2,850,810.00     $2,850,810.00     $2,850,810.00 Capital                 Expense                Rates               November 2015 OM            Peter Milne     Council resolution to purchase environmental
                    Infrastructure       Environment          Acquisition - Cooroibah                                                                                                                                                                                                                        land, including stamp duty and legal costs.
     CP010          Corporate Services   Property and Facilities North Shore Beachfront                                            $0.00            $0.00       $50,000.00         $50,000.00 Capital                 Expense                Rates               December 2015 P&O          Narelle Reid     Initial planning works towards overall master
                                                              Campground — Planning                                                                                                                                                                              Committee                                   plan
                                                              Consultancy
     CP011          Planning &           Civil Operations     Tewantin RSL Park Shade                                              $0.00        $2,119.00        $40,000.00        $40,000.00 Capital                 Expense                Offset                                         Dallas Bickley   Provide new shade structure over new
                    Infrastructure                            Structure Renewal                                                                                                                                                                                                                              playground refurbishment at RSL Park
                                                                                                                                                                                                                                                                                                             Tewantin. Requested by Councillors and
                                                                                                                                                                                                                                                                                                             community.
     CP012          Planning &           Civil Operations     Tewantin Spray Park                                                  $0.00            $0.00        $50,000.00        $50,000.00 Capital                 Expense                Offset                                         Dallas Bickley   Provide new shade structure over new spray
                    Infrastructure                            Shade Structure Renewal                                                                                                                                                                                                                        park refurbishment at. Requested by
                                                                                                                                                                                                                                                                                                             Councillors and community.
     CP013          Planning &           Infrastructure Planning Tewantin Poinciana Avenue                                         $0.00            $0.00       $180,000.00       $180,000.00 Capital                 Expense                Offset                                         Scott Morgan     Successful grant funds from Cycle network
                    Infrastructure       & Design             Shared Path Upgrade                                                                                                                                                                                                                            program
                                                              Design & Construction
                                                                                                                                                                    —
                    Planning &           Infrastructure Planning Tewantin Poinciana Avenue                                                                     ($90              -($90,000,00) Capital
     CP013                                                                                                                         $0.00            $0.00      -($90,000.00)                                          Revenue                Grant                                          Scott Morgan     Recognise additional capital grants revenue
                    Infrastructure       & Design             Shared Path Upgrade                                                                                                                                                                                                                            Cycle Network Local Government Grants
                                                              Design & Construction                                                                                                                                                                                                                          Program
     CP014          Planning &           Infrastructure Planning Noosaville Eenie Creek                                            $0.00            $0.00       $130,000.00       $130,000.00 Capital                 Expense                Rates                                          Scott Morgan     Successful grant funds from Cycle network
                    Infrastructure       & Design             Road Off-Ramp to                                                                                                                                                                                                                               program
                                                              Underpass Design &
                                                              Construction
                                                                                                                                                               pe am aoe
                                                                                                                                                                        ~
                                                                                                                                                                        00)      -($65,000.00) Capital
     CP014          Planning &           Infrastructure Planning Noosaville Eenie Creek                                            $0.00            $0.00      -($65,000.                                             Revenue                Grant                                          Scott Morgan     Recognise additional capital grants revenue
                    Infrastructure       & Design             Road Off-Ramp to                                                                                                                                                                                                                               Cycle Network Local Government Grants
                                                              Underpass Design &                                                                                                                                                                                                                             Program
                                                              Construction
     CP015          Planning &           Infrastructure Planning Whole of Shire - Noosa                                            $0.00            $0.00                          $90,000.00 Capital                 Expense                Rates                                          Scott Morgan     Successful grant funds from Cycle network
                    Infrastructure       & Design             Pedestrian and Cycle Data                                                                                                                                                                                                                      program
                                                              Counters
     CP015          Planning &           Infrastructure Planning Whole of Shire - Noosa                                            $0.00            $0.00      ($45,000.00)      -($45,000,00) Capital                Revenue                Grant                                          Scott Morgan     Recognise additional capital grants revenue
                    Infrastructure       & Design             Pedestrian and Cycle Data                                                                                                                                                                                                                      Cycle Network Local Goverment Grants
                                                              Counters                                                                                                                                                                                                                                       Program
     CP016          Planning &           Infrastructure Planning Noosa Heads - Park Road                                    $156,865.00         $4,967.00     ($151,898.00)         $4,967.00 Capital                 Expense                Rates                                       Nicholas Wellwood   Consolidate 2 separate projects into 1
                    Infrastructure       & Design             Boardwalk Design
     CP016          Planning &           Infrastructure Planning Noosa Heads - Park Road                                    $199,996.00        $58,442.00       $151,898.00       $351,894.00 Capital                 Expense                Rates                                       Nicholas Wellwood   Consolidate 2 separate projects into 1
                    Infrastructure       & Design             Boardwalk Design and
                                                              Consultation
     CP017          Planning &           Strategic Land Use   Business Distribution &                                              $0.00        $6,425.00        $11,425.00        $11,425.00 Capital                 Expense                Rates                                         Rebecca Britton   Additional works required for this study to
                    Infrastructure       Planning             Land Needs Project                                                                                                                                                                                                                             inform the new Town Plan

                                                                                                                                Page 35 of 47

Section 36

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 36 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                        8 FEBRUARY 2016

      Budget Review 3 - December Quarter Review 2015/16
     Summary   of Submissions Received                                                                                     15,120,117.71      4,738,897.00      1,924,993.29     17,045,111.00
      aisles lac)   ele Tacit g          Teele)                Cost Centre / Project          Eee Cuts                  2015/16 Current  PA Ea Cel Ir      Proposed          Proposed New      Capital / Operating     Revenue / Expense       Funding Source      Council Resolution /    Business Contact     ere
                                                              Description                         Description           Budget                             Budget            Budget                                                                                Contract Reference
                                                                                                                                                           Adjustment
     CP018          Planning &           Strategic Land Use   Whole of Shire Planning                                        $400,000.00       $116,211.00                         $468,575.00 Capital                 Expense                 Rates                                         Rebecca Britton    Additional Allocation to allow LGIP review to
                    Infrastructure       Planning             Scheme Development                                                                                                                                                                                                                                be undertaken in accordance with statutory
                                                              Projects 2016                                                                                                                                                                                                                                     timelines
     CP019          Planning &           Infrastructure Planning Noosa Junction Transit                                       $40,000.00             $0.00                               $0.00 Capital                 Expense                 Rates                                          Craig Eldridge    Works not considered necessary and
                    Infrastructure       & Design             Centre - improvements                                                                                                                                                                                                                             therefore project to be cancelled.
     CP020          Planning &           Infrastructure Planning Noosa Heads - Noosa Bus                                      $50,291.00        $24,096.00                         $100,000.00 Capital                 Expense                 Rates                                            Jo Ferris       Initial estimates were short of actual quotation
                    Infrastructure       & Design             Station Safer Streets                                                                                                                                                                                                                             received.
                                                              p  ogram
     CP022          Planning &           Infrastructure Planning Electric Bus Charging                                        $77,910.00        $79,643.00                          $97,910.00 Capital                 Expense                 Rates                                          Adam Britton      Actual costs exceeded original estimates -
                    Infrastructure       & De: gn             Station and installation                                                                                                                                                                                                                          installation to be deferred
     CP023          Planning &           Civil Operations     Hastings St Landscape                                                 $0.00       $41,874.00                          $41,874.00 Capital                 Expense                 Rates                                            Allan Hull      Urgent works funded from Hastings Street
                    Infrastructure                            timber structure renewal                                                                                                                                                                                                                          Maintenance Le
     CP024          Planning &           Infrastructure Planning Translink Bus Stops Walter                                         $0.00       $49,038.00                          $49,038.00 Capital                 Expense                 Rates                                          Scott Morgan      Consolidate 2 separate projects into 1
                    Infrastructure       & Design             Hay Drive
     CP024          Planning &           Infrastructure Planning Noosaville - Walter Hay                                      $27,710.00             $0.00                               $0.00 Capital                 Expense                 Rates                                          Scott Morgan      Consolidate 2 separate projects into 1
                    Infrastructure       & Design             Drive - Bus Shelters
     CP025          Planning &           Infrastructure Planning Sunrise Beach - Ben                                                $0.00            $0.00                         $184,000.00 Capital                 Expense                                                               Bryan O'Connor     Project is a result of the rehabilitation of the
                    Infrastructure       & Design             Lexcen Drive Southern end                                                                                                                                                                                                                         underground services and the need to renew
                                                              Road Corridor                                                                                                                                                                                                                                     drainage assets - Kerb and Channel and
                                                              improvements                                                                                                                                                                                                                                      catch pits in readiness for asphalt overlay.
     CP026          Planning &           Civil Operations     Cooroy maple Street                                                   $0.00            $0.00                          $20,000.00 Capital                 Expense                 Offset                                         Martin Sergas     Assets have failed.
                    Infrastructure                            Driveway renewals
     CP027          Planning &           Civil Operations     Black Mountain Rd Landslip                                            $0.00            $0.00                         $320,000.00 Capital                 Expense                                                              Cameron Shields     Land slip from weather event.
                    Infrastructure
     CP028          Planning &           Infrastructure Planning Noosaville - Eumundi Road                                          $0.00        $7,776.00                           $7,776.00 Capital                 Expense                 Offset                                         Craig Eldridge    2014/15 project completed in July 2015 but
                    Infrastructure       & Design             Corridor                                                                                                                                                                                                                                          not included in carryover req
                                                                                                                                                                                                                                                                                                                                         uests
     cP029          Planning &           Civil Operations     Dr Pages - Kinmond Creek                                        $75,055.00        $94,022.00                               $0.00 Capital                 Expense                 Rates                                          Craig Eldridge    Consolidate 2 separate projects into 0
                    Infrastructure                            Rd Initial Planning & Design
     CP029          Planning &           Civil Operations     Cootharaba - Dr Pages                                         $5,500,000.00    $1,345,295.00                       $5,575,055.00 Capital                 Expense                 Rates                                          Craig Eldridge    Consolidate 2 separate projects into 1
                    Infrastructure                            Road & Kinmond Creek
                                                              Road Construction
     CP030          Planning &           Civil Operations     Whole of Shire Reseal and                                     $1,378,680.00      $336,317.00        04        ))     $336,317.00 Capital                 Expense                 Rates                                        Cameron Shields     Consolidate 2 separate projects into 1
                    Infrastructure                            Rehab
     CP030          Planning &           Civil Operations     Whole of Shire Reseal and                                     $4,750,000.00    $1,361 ,408.00                      $5,792,363.00 Capital                 Expense                 Rates                                        Cameron Shields     Consolidate 2 separate projects into 1
                    Infrastructure                            Rehab
     CP032          Planning &           Infrastructure Planning Whole of Shire Stormwater                                   $249,998.00         $2,583.00                  Me
                    Infrastructure       & Design             Pit Structure Renewal
                                                              Program
     CP033          Planning &           Civil Operations     Cootharaba Kinmond Creek                                              $0.00            $0.00                          $50,000.00 Capital                 Expense                 Offset                                         Craig Eldridge    Culverts have rusted out and are currently
                    Infrastructure                            Road Sandy Ck Amco                                                                                                                                                                                                                                propped to cater for the Dr Pages Rd
                                                              Renewal - desig                                                                                                                                                                                                                                    onstruction activities.
     CP033          Planning &           Civil Operations     Cootharaba Kinmond Creek                                              $0.00            $0.00                          $50,000.00 Capital                 Expense                                                                Craig Eldridge    Culverts have rusted out and are currently
                    Infrastructure                            Road Eastern Branch Amco                                                                                                                                                                                                                         propped to cater for the Dr Pages Rd
                                                              Renewal - design                                                                                                                                                                                                                                  construction activities.
     CP034          Planning &           Infrastructure Planning Weyba Road Reef Street                                      $104,480.00        $18,676.00                         $324,480.00 Capital                 Expense                 Offset                                         Craig Eldridge    There were a number of issues that have
                    Infrastructure       & Design             Intersection Improvements -                                                                                                                                                                                                                       been identified since this project was first
                                                              PIP                                                                                                                                                                                                                                               estimated. . The scope of the project has
                                                                                                                                                                                                                                                                                                                increased significantly since it was first
                                                                                                                                                                                                                                                                                                                considered. Details in Project brief
     CP035          Planning &           Infrastructure Planning Eenie Creek Road / Walter                                          $0.00       $37,632.00                          $37,632.00 Capital                 Expense                 Rates                                          Scott Morgan      2014/15 project completed in July 2015 but
                    Infrastructure       & Design             Hay Drive intersection                                                                                                                                                                                                                            not included in carryover requests
                                                              Safety Upgrade
     CP036          Planning &           Infrastructure Planning Standards Review -                                           $13,791.00         $3,187.00                          $38,791.00 Capital                 Expense                 Rates                                          Craig Eldridge    An additional $25,000 in funds is required to
                    Infrastructure       & Design             Standard Drawings                                                                                                                                                                                                                                 continue the review and updating of the
                                                                                                                                                                                                                                                                                                                Noosa Council civil engineering standard
                                                                                                                                                                                                                                                                                                                drawings. The original budget request of
                                                                                                                                                                                                                                                                                                                $25,000 was not sufficient to cover the extent
                                                                                                                                                                                                                                                                                                                of work required as it was not anticipated that
                                                                                                                                                                                                                                                                                                                a major review was required.
     CP037          Planning &           Infrastructure Planning Noosa Heads Noosa                                                  $0.00            $0.00                         $200,000.00 Capital                 Expense                 Offset                                         Scott Morgan      Successful grant funds from Cycle network
                    Infrastructure       & Design             Parade Road Corridor                                                                                                                                                                                                                              program
                                                              Upgrade - Design
     CP037          Planning &           Infrastructure Planning Noosa Heads Noosa                                                  $0.00            $0.00
                    Infrastructure       & Design             Parade Road Corridor
                                                              Upy rade - Design
                                                                 q
                                                                 4
     CP038          Community Services   Waste and            Noosaville Landfill - Bio                                             $0.00        $7,130.00                           $7,130.00 Capital                 Expense                 Rates                                         Wayne Schafer      2014/15 project completed in July 2015 but
                                         Environmental Health Basin                                                                                                                                                                                                                                            not included in cai over requests
     CP039          Community Services   Waste and            Shade Sail Replacement at                                             $0.00        $7,112.00                           $7,112.00 Capital                 Expense                 Rates                                         Wayne Schafer      Shade sail relocated from Tewantin Water
                                         Environmental Health Briteside                                                                                                                                                                                                                                         Park
     CP040          Planning &           Infrastructure Planning Whole of Shire Emergent                                    $2,675,803.00            $0.00                                                                                                                                                              ee
                    Infrastructure       & Design             Works Program 2015/2016

                                                                                                                                 Page 36 of 47

Section 37

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 37 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                                                                                                                        8 FEBRUARY 2016

      Budget Review 3 - December Quarter Review 2015/16
     Summary   of Submissions Received                                                                                 $ 15,120,117.71   $   4,738,897.00  §$ 1,924,993.29  $ 17,045,111.00
       Ce ad       ITF erates            Branch               Cost Centre / Project          Financial Statement       2015/16 Current  2015/16 Actuals   Proposed          Proposed New     or] Vim) ela}           Revenue / Expense      Funding Source      Council Resolution /     Business Contact    Ce TTS
                                                              Description                        Description           Budget                             Budget            Budget                                                                                NTE Tot Mad ICEL)
                                                                                                                                                          Adjustment
      P1015         Planning &           Developmen           PIP and Infrastructure       Capital Contributions and      -($102,909.25)    -($140,471.00)     -($37,561.75)   -($140,471.00) Capital                Revenue                Rates                                           Kerri Coyle     Adjust revenue forecast to reflect current leve
                    Infrastructure       Assessment and       Charges                             Donations                                                                                                                                                                                                  of activity.
                                         Environment
      PI015         Planning &           Developmen:          PIP and Infrastructure       Capital Contributions and       ($94,850.04)     ($213,226.00)     -($118,375.96)   ($213,226.00) Capital                 Revenue                Rates                                           Kerri Coyle     Adjust revenue forecast to reflect current level
                    Infrastructure       Assessment and       Charges                             Donations                                                                                                                                                                                                  of activity.
                                         Environment
      P1015         Planning &           Developmen           PIP and Infrastructure       Capital Contributions and      -($111,438.00)    -($413,301.00)    -($301,863.00)   -($413,301.00) Capital                Revenue                Rates                                           Kerri Coyle     Adjust revenue forecast to reflect current leve
                    Infrastructure       Assessment and       Charges                             Donations                                                                                                                                                                                                  of activity.
                                         Environment
      P1015         Planning &           Developmen           PIP and Infrastructure       Capital Contributions and       ($54,443.04)     -($155,090.00)    -($100,646.96)   -($155,090.00) Capital                Revenue                Rates                                           Kerri Coyle     Adjust revenue forecast to reflect current level
                    Infrastructure       Assessment and       Charges                             Donations                                                                                                                                                                                                  of activity.
                                         Environment
      P1015         Planning &           Developmen           PIP and Infrastructure       Capital Contributions and      -($331,569.96)    -($390,744.00)     -($59,174.04)   -($390,744.00) Capital                Revenue                Rates                                           Kerri Coyle     Adjust revenue forecast to reflect current leve
                    Infrastructure       Assessment and       Charges                             Donations                                                                                                                                                                                                  of activity.
                                         Environment
      P1015         Planning &           Developmen           PIP and Infrastructure       Capital Contributions and      ($145,251.00)     ($478,231.00)     -($332,980.00)   ($478,231.00) Capital                 Revenue                Rates                                           Kerri Coyle     Adjust revenue forecast to reflect current level
                    Infrastructure       Assessment and       Charges                             Donations                                                                                                                                                                                                  of activity.
                                         Environment

                                                                                                                                 Page 37 of 47

Section 38

GENERAL COMMITTEE MEETING AGENDA                   8 FEBRUARY 2016




                                   Page 38 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                                8 FEBRUARY 2016

    Capital / Ope Capital

    Sum of Proposed Budget Adjustment                                                                                                                        Revenue / Expense
    CAPEX Ren CAPEX PROGRAM                                      Cost Centre / Project Description             Comments                                      Expense                 Revenue                 Grand Total
      (blank)     (blank)                                          PIP and Infrastructure Charges              Adjust revenue forecast to reflect current level of                                 (950,602)     (950,602)
                                                                                                               activity.
                 blank) Total                                                                                                                                                                      950,602       950,602
     blank) Total                                                                                                                                                                                  950,602       950,602
       Renewal    Bridges                                          Cooroy,Mary River Road Timber Bridge        Level 3 Inspection conducted by TODs on OCT                  122,500                               122,500
                                                                   Rehabilitation                              2015 found additional work was required to
                                                                                                               extend the asset life that was not identified in the
                                                                                                               original level 3 inspection.
                Bridges Total                                                                                                                                               122,500                               122,500
                  Coastal Canals and Waterways                    Castaways Beach - Beach Access 42            Final costs exceeded initial estimates                          6,000                                6,000
                Coastal Canals and Waterways Total                                                                                                                             6,000                                6,000
                  Community Facilities                             Sunshine Beach - NAC : Replacement of       Initial estimates incomplete for scope of works               45,000                                45,000
                                                                   Program Pool heat pump                      required
                                                                   Noosa Heads Surf Club Public Amenities      Expanded scope of works following detailed                   (85,000)                              (85,000)
                                                                   Refurbishment                               investigations - works deferred to 2016/17
                                                                                                               program
                                                                   Replacement of Condenser Units at The J AC  Emergent works due to failure of the existing unit            65,000                                65,000

                Community Facilities Total                                                                                                                                   25,000                                25,000
                  Corporate Buildings                              Noosaville Depot Workshop Roller Doors      Urgent renewal works as current asset has failed               17,795                               17,795
                                                                   Replacement
                Corporate Buildings Total                                                                                                                                     17,795                               17,795
                  Parks & Playgrounds                              Tewantin RSL Park Shade Structure Renewal   Provide new shade structure over new                          40,000                                40,000
                                                                                                               playground refurbishment at RSL Park Tewantin.
                                                                                                               Requested by Councillors and community.

                                                                   Tewantin Spray Park Shade Structure         Provide new shade structure over new spray park               50,000                                50,000
                                                                   Renewal                                     refurbishment at. Requested by Councillors and
                                                                                                               community.
                Parks & Playgrounds Total                                                                                                                                    90,000                                90,000
                  Pathways and Enabling Facilities                 Tewantin Poinciana Avenue Shared Path       Successful grant funds from Cycle network                    180,000                               180,000
                                                                   Upgrade Design & Construction               program
                                                                                                               Recognise additional capital grants revenue Cycle                                    (90,000)      (90,000)
                                                                                                               Network Local Government Grants Program

                                                                   Noosa Heads Noosa Parade Road Corridor      Successful grant funds from Cycle network                    200,000                               200,000
                                                                   Upgrade - Design                            program
                                                                                                               Recognise additional capital grants revenue Cycle                                   (100,000)     (100,000)
                                                                                                               Network Local Government Grants Program

                Pathways and Enabling Facilities Total                                                                                                                      380,000                (190,000)      190,000
                  Sealed Road Network                              Sunrise Beach - Ben Lexcen Drive Southern   Project is a result of the rehabilitation of the             184,000                               184,000
                                                                   end Road Corridor improvements              underground services and the need to renew
                                                                                                               drainage assets - Kerb and Channel and catch
                                                                                                               pits in readiness for asphalt overlay.
                                                                  Cooroy maple Street Driveway renewals        Assets have failed.                                           20,000                                20,000
                                                                  Black Mountain Rd Landslip                   Land slip from weather event.                                320,000                               320,000
                                                                   Noosaville - Eumundi Road Corridor          2014/15 project completed in July 2015 but not                  7,776                                7,776
                                                                                                               included in carryover requests
                                                                  Whole of Shire Reseal and Rehab              Consolidate 2 separate projects into 1                    (1,588,071)                           (1,588,071)
                                                                   Whole of Shire Emergent Works Program       Reallocation from Emergent Works Program
                                                                   2015/2016                                   (also covers some upgrade elements)
                Sealed Road Network Total                                                                                                                                (1,056,295)                           (1,056,295)

                                                                                      Page 38 of 47

The text continues on section 39.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.