Budget Review 3 - December Quarter Review 2015/16
Summary of Submissions Received 15,120,117.71 4,738,897.00 1,924,993.29 17,045,111.00
aisles lac) ele Tacit g Teele) Cost Centre / Project Eee Cuts 2015/16 Current PA Ea Cel Ir Proposed Proposed New Capital / Operating Revenue / Expense Funding Source Council Resolution / Business Contact ere
Description Description Budget Budget Budget Contract Reference
Adjustment
CP018 Planning & Strategic Land Use Whole of Shire Planning $400,000.00 $116,211.00 $468,575.00 Capital Expense Rates Rebecca Britton Additional Allocation to allow LGIP review to
Infrastructure Planning Scheme Development be undertaken in accordance with statutory
Projects 2016 timelines
CP019 Planning & Infrastructure Planning Noosa Junction Transit $40,000.00 $0.00 $0.00 Capital Expense Rates Craig Eldridge Works not considered necessary and
Infrastructure & Design Centre - improvements therefore project to be cancelled.
CP020 Planning & Infrastructure Planning Noosa Heads - Noosa Bus $50,291.00 $24,096.00 $100,000.00 Capital Expense Rates Jo Ferris Initial estimates were short of actual quotation
Infrastructure & Design Station Safer Streets received.
p ogram
CP022 Planning & Infrastructure Planning Electric Bus Charging $77,910.00 $79,643.00 $97,910.00 Capital Expense Rates Adam Britton Actual costs exceeded original estimates -
Infrastructure & De: gn Station and installation installation to be deferred
CP023 Planning & Civil Operations Hastings St Landscape $0.00 $41,874.00 $41,874.00 Capital Expense Rates Allan Hull Urgent works funded from Hastings Street
Infrastructure timber structure renewal Maintenance Le
CP024 Planning & Infrastructure Planning Translink Bus Stops Walter $0.00 $49,038.00 $49,038.00 Capital Expense Rates Scott Morgan Consolidate 2 separate projects into 1
Infrastructure & Design Hay Drive
CP024 Planning & Infrastructure Planning Noosaville - Walter Hay $27,710.00 $0.00 $0.00 Capital Expense Rates Scott Morgan Consolidate 2 separate projects into 1
Infrastructure & Design Drive - Bus Shelters
CP025 Planning & Infrastructure Planning Sunrise Beach - Ben $0.00 $0.00 $184,000.00 Capital Expense Bryan O'Connor Project is a result of the rehabilitation of the
Infrastructure & Design Lexcen Drive Southern end underground services and the need to renew
Road Corridor drainage assets - Kerb and Channel and
improvements catch pits in readiness for asphalt overlay.
CP026 Planning & Civil Operations Cooroy maple Street $0.00 $0.00 $20,000.00 Capital Expense Offset Martin Sergas Assets have failed.
Infrastructure Driveway renewals
CP027 Planning & Civil Operations Black Mountain Rd Landslip $0.00 $0.00 $320,000.00 Capital Expense Cameron Shields Land slip from weather event.
Infrastructure
CP028 Planning & Infrastructure Planning Noosaville - Eumundi Road $0.00 $7,776.00 $7,776.00 Capital Expense Offset Craig Eldridge 2014/15 project completed in July 2015 but
Infrastructure & Design Corridor not included in carryover req
uests
cP029 Planning & Civil Operations Dr Pages - Kinmond Creek $75,055.00 $94,022.00 $0.00 Capital Expense Rates Craig Eldridge Consolidate 2 separate projects into 0
Infrastructure Rd Initial Planning & Design
CP029 Planning & Civil Operations Cootharaba - Dr Pages $5,500,000.00 $1,345,295.00 $5,575,055.00 Capital Expense Rates Craig Eldridge Consolidate 2 separate projects into 1
Infrastructure Road & Kinmond Creek
Road Construction
CP030 Planning & Civil Operations Whole of Shire Reseal and $1,378,680.00 $336,317.00 04 )) $336,317.00 Capital Expense Rates Cameron Shields Consolidate 2 separate projects into 1
Infrastructure Rehab
CP030 Planning & Civil Operations Whole of Shire Reseal and $4,750,000.00 $1,361 ,408.00 $5,792,363.00 Capital Expense Rates Cameron Shields Consolidate 2 separate projects into 1
Infrastructure Rehab
CP032 Planning & Infrastructure Planning Whole of Shire Stormwater $249,998.00 $2,583.00 Me
Infrastructure & Design Pit Structure Renewal
Program
CP033 Planning & Civil Operations Cootharaba Kinmond Creek $0.00 $0.00 $50,000.00 Capital Expense Offset Craig Eldridge Culverts have rusted out and are currently
Infrastructure Road Sandy Ck Amco propped to cater for the Dr Pages Rd
Renewal - desig onstruction activities.
CP033 Planning & Civil Operations Cootharaba Kinmond Creek $0.00 $0.00 $50,000.00 Capital Expense Craig Eldridge Culverts have rusted out and are currently
Infrastructure Road Eastern Branch Amco propped to cater for the Dr Pages Rd
Renewal - design construction activities.
CP034 Planning & Infrastructure Planning Weyba Road Reef Street $104,480.00 $18,676.00 $324,480.00 Capital Expense Offset Craig Eldridge There were a number of issues that have
Infrastructure & Design Intersection Improvements - been identified since this project was first
PIP estimated. . The scope of the project has
increased significantly since it was first
considered. Details in Project brief
CP035 Planning & Infrastructure Planning Eenie Creek Road / Walter $0.00 $37,632.00 $37,632.00 Capital Expense Rates Scott Morgan 2014/15 project completed in July 2015 but
Infrastructure & Design Hay Drive intersection not included in carryover requests
Safety Upgrade
CP036 Planning & Infrastructure Planning Standards Review - $13,791.00 $3,187.00 $38,791.00 Capital Expense Rates Craig Eldridge An additional $25,000 in funds is required to
Infrastructure & Design Standard Drawings continue the review and updating of the
Noosa Council civil engineering standard
drawings. The original budget request of
$25,000 was not sufficient to cover the extent
of work required as it was not anticipated that
a major review was required.
CP037 Planning & Infrastructure Planning Noosa Heads Noosa $0.00 $0.00 $200,000.00 Capital Expense Offset Scott Morgan Successful grant funds from Cycle network
Infrastructure & Design Parade Road Corridor program
Upgrade - Design
CP037 Planning & Infrastructure Planning Noosa Heads Noosa $0.00 $0.00
Infrastructure & Design Parade Road Corridor
Upy rade - Design
q
4
CP038 Community Services Waste and Noosaville Landfill - Bio $0.00 $7,130.00 $7,130.00 Capital Expense Rates Wayne Schafer 2014/15 project completed in July 2015 but
Environmental Health Basin not included in cai over requests
CP039 Community Services Waste and Shade Sail Replacement at $0.00 $7,112.00 $7,112.00 Capital Expense Rates Wayne Schafer Shade sail relocated from Tewantin Water
Environmental Health Briteside Park
CP040 Planning & Infrastructure Planning Whole of Shire Emergent $2,675,803.00 $0.00 ee
Infrastructure & Design Works Program 2015/2016
Page 36 of 47See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.