Original source · versioned page text
12. Appendix I - Engineering Services Report
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
Infrastructure Services Report
Noosa Marketplace Development, 2 - 20 Hofmann Dr, Noosaville
4.5 Telecommunications
Telstra are the responsible authority for the provision of telecommunications facilities to the development.
Asset information provided by Telstra indicates a cable network entering the site’s north from Eenie Creek
Road, following the site’s western boundary and terminating at the centre of the site near the main access
point, refer Figure 4-5.
NBN records indicate assets in the same trench location as Telstra’s infrastructure, following the site west
from the north towards the centre of the site.
It is expected that these authorities will extend supply infrastructure to the site from the development in
accordance with standard industry practice.
Figure 4-5 Telstra underground cable plan (Telstra asset plans)
4.6 Gas Supply
No known gas information is available in the area.
17 May 2019 Cardno 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.