Skip to the record
For the highest quality transcripts.

Original source · versioned page text

12. Appendix I - Engineering Services Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

PAPER SIZE A3

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately.

For Emergency Situations
Please call 13 19 62

 

 

 

 

 

 

 

 

 

 

 

UNCONTROLLED COPY

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
y or provide iti

of the infor ic d. Exact p of cables and electrical connectivity should be confirmed on site.

TREY
So.

energex
GIS
DBYD

Date: 17 Apr 19 Time: 16.52.29
Requested By: DBYD

NOT TO SCALE

° 100m

 

Enquiry No: 82461331
KEY MAP

Enquiry Area

 

 

LOCALITY DIAGRAM

No

 

PAPER SIZE A3

 

 
Log in to download the original file

12. Appendix I - Engineering Services Report.pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.