Original source · versioned page text
12. Appendix I - Engineering Services Report
Original PDF page 26, section 1. The text section number identifies this passage in the reader.
PAPER SIZE A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.
4600 4700
7
4
‘|
N
~
8800
8700
~ eS ~N
P1417216
N
XN S
BQ N
S aw
~N
\
o/ > SSN
P1417217 Kx 7 NO
N
AL los
ae) \ P1417218 sy
Sy @ co \
P141721 NS
oN
NN
707 8600m N
4800
For Emergency Situations
Please call 13 19 62
8800
8700
8600
504600m E 4700
This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.
4800
UNCONTROLLED COPY
ae
a
energex
GIS
DBYD
Date: 17 Apr 19 Time: 16.52.41
Requested By: DBYD
SCALE 1:1000
20 ° 20m
-
Enquiry No: 82461331
STRIP No: 1
= Cable Voltage
(A Ground Transformer Less Than $534
Cubicle Tansformer | Cable Voltage
33kV or Higher
fm Ring Main Unit
@) Metering Unit © Direer-Lay
wv Link Pillar O Conduit
[1 Service Pillar Multi-Section
Junction Pillar Duct
’ Trench
J Pit ——
Cable Tray
b> Cable Termination [| Wanner
“Cable Marker
ms = Cable Joint
x} Street Light Pole
li Earth
Planned Work
labelled by Work Order
INDEX TO SHEETS
LOCALITY DIAGRAM
PAPER SIZE A3 Map has been designed to be reproduced in colour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.